Summary of 870420 Meeting W/Tva in Chattanooga,Tn Re Review of Rev 4 to Vol 1 of TVA Nuclear Performance Plan & Status of Vol II of Plan.Agenda,Transcript of Meeting,List of Attendees & Viewgraphs Encl
ML20214L591
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/18/1987
From: Donohew J
NRC OFFICE OF SPECIAL PROJECTS
To:
NRC OFFICE OF SPECIAL PROJECTS
Shared Package
ML20214L593 List:
References
NUDOCS 8706010011
Download: ML20214L591 (4)


Text

May 18, 1987 Docket Nos. 50-327/50-328 LICENSEE: Tennessee Valley Authority FACILITY: Sequoyah Nuclear Plant, Units 1 and 2

SUBJECT:

MEETING 0F APRIL 20, 1987 BETWEEN THE OFFICE OF SPECIAL PROJECTS, NRC AND THE TENNESSEE VALLEY AUTHORITY On Monday, April 20, 1987, a meeting was held in Chattanooga, Tennessee, between the Office of Special Projects (OSP), NRC and the Tennessee Valley Authority (TVA). The meeting was held at TVA's corporate headquarters from 1:00 p.m. to 5:00 p.m. for the OSP staff to present the conclusions of its review of Revision 4 of Volume I of TVA Nuclear Performance Plan and for the TVA staff to present the status of the implementation of Volume II of the TVA Plan. Volume I is for the corporate level and Volume II is for the Sequoyah site. Revision 4 of Volume I was submitted on March 26, 1987, and Revision 1 of Volume II was submitted April 1, 1987.

The meeting was transcribed. Enclosure 1 is the agenda for the meeting.

Enclosure 2 is the transcription of the meeting. Enclosure 3 is the list of those attending the meeting. Enclosure 4 is the material handed out by TVA.

There was no handout from the OSP staff.

k ton w, Jr. , Branch Chief

!Sequoyah art Division of TVA Projects Office of Special Projects Enclosures As stated cc: See attached lists DISTRIBUTION Docket File NRC PDR Local PDR 7

NO kOON >

P

/

j OFC :0SP:DTVA :DTV : :r]N :DTVA:AD/P  :  :  :

NAME :CJanerson :JD :JZwolinski  :  :

......:...[..----(s DATE :5/ /87 ( :5/stlT.87 w

5/[d/87  :  :  :

i Sequoyah Nuclear Plant

'E cc:

Tennessee Department of Regional Administrator, Region II Public Health U.S. Nuclear Regulatory Comission, ATTN: Director, Bureau of 101 Marietta Street, N.W.

, Environmental Health Services Atlanta, Georgia 30323

- Cordell Hull Building

! Nashville, Tennessee 37219 Mr. R. W. Cantrell

ATTN
D.L. Williams Mr. Michael H. Mobley, Director Tennessee . Valley Authority Division of Radiological Health 400 West Summit Hill Drive, W12 A12 T.E.R.R.A. Building l Knoxville, Tennessee 37902 150 9th Avenue North Nashville, Tennessee 37203 Mr. Bob Faas j Westinghouse Electric Corp. County Judge P.O. Box 355 Hamilton County Courthouse Pittsburgh, Pennsylvania 15230 Chattanooga, Tennessee 37402 Mr. R. L. Gridley Mr. Richard King i Tennessee Valley Authority c/o U.S. GA0 SN 1578 Lookout Place 1111 North Shore Drive

, Chattanooga, Tennessee 37402-2801 Suite 225, Box 194 j Knoxville.. Tennessee 37919 1 Mr. M. R. Harding Tennessee Valley Authority Mr. S. A. White Sequoyah Nuclear Plant Manager of Nuclear Power P.O. Box 2000 Tennessee Valley Authority Soddy Daisy, Tennessee 37379 6N~38A Lookout Place 1101 Market Street Resident. Inspector /Sequoyah NP Chattanooga, Tennessee 37402-2801 c/o U.S. Nuclear Regulatory Comission 2600 Igou Ferry Road' Soddy Daisy, Tennessee 37379 ,

t Mr. H.L. Abercrombie

. Tennessee Valley Authority Sequoyah Nuclear Plant P.O. Box 2000 Soddy Daisy, Tennessee 37379 i

i .

u.--. . - - , _ _ _ . , _ _ , . _ . , _ . , - _ _ _ ,,___..._...,_m...,_,___..___,_ . _ _ _ _ _ _ , . _ __

DISTRIBUTION FOR MEETING

SUMMARY

DATED: May la, 1987 Facility: Sequoyah Nuclear Plant, Units 1 and 2*

VDecket"Midt NRC Participants

~

NRC PDR J. Donohew Local PDR J. Keppler J. Axelrad S. Ebneter -

S. R. Connel.ly, OIA S. Richardson C. Jamerson, w/o encl. J. Zwolinski F. Miraglia B. D. Liaw ACRS (10) G. Zech, RII OGC-BETH M. Branch E. Jordan J. Partlow Dr. Henry Myers SON F.ile Projects Rdg TVA-Bethesda

~

  • Copy sent to persons on facility service list hs ,

sh

TVA-NRC ElCL00Ur.I 1 MEETING AGENDA TENNESSEE RIVER ROOH APRIL 20, 1987 1 P.M. - 4 P.M.

Introduction S. A. White /J. Kepoler I.

- Scope / Objectives

- Introductions II. Olscussion of Volume 1 SER NRC Staff III. Otscussion of Open Volume 2 Issues

- - Design and Configuration Control J. A. Kirkebo

-

  • DBVP s
  • Design Calculations

- Environmental Qualification J. A. Xtrkebo

- Restart Test Program C. H. Fox, Jr.

C. H. Fox, Jr.

- Heat Code Traceability

- Maintenance H. L. Abercromble

- Surveillance Instructions H. L. Abercrombie

- Post Modification H. L. Abercromble Functional Testing

- Quality Assurance N. C. Kazanas

  • CAQR Process QA-EA-ONE Interface

- Employee Concerns

  • Intimidation and Harassment /

Wrongdoing Issues 7. 8. Jenkins

  • Employee Concern Special Program Status (Including Allegations) M. S. Hartin
  • New Employee Concern Progam Status (Including Allegations) E. K. 511ger S. A. White /J. Keppler IV. Concluding Remarks

.