Summary of 870420 Meeting W/Tva in Chattanooga,Tn Re Review of Rev 4 to Vol 1 of TVA Nuclear Performance Plan & Status of Vol II of Plan.Agenda,Transcript of Meeting,List of Attendees & Viewgraphs Encl
ML20214L591
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/18/1987
From: Donohew J
NRC OFFICE OF SPECIAL PROJECTS
To:
NRC OFFICE OF SPECIAL PROJECTS
Shared Package
ML20214L593 List:
References
NUDOCS 8706010011
Download: ML20214L591 (4)


Text

May 18, 1987 Docket Nos. 50-327/50-328 LICENSEE:

Tennessee Valley Authority FACILITY:

Sequoyah Nuclear Plant, Units 1 and 2

SUBJECT:

MEETING 0F APRIL 20, 1987 BETWEEN THE OFFICE OF SPECIAL PROJECTS, NRC AND THE TENNESSEE VALLEY AUTHORITY On Monday, April 20, 1987, a meeting was held in Chattanooga, Tennessee, between the Office of Special Projects (OSP), NRC and the Tennessee Valley Authority (TVA). The meeting was held at TVA's corporate headquarters from 1:00 p.m. to 5:00 p.m. for the OSP staff to present the conclusions of its review of Revision 4 of Volume I of TVA Nuclear Performance Plan and for the TVA staff to present the status of the implementation of Volume II of the TVA Plan. Volume I is for the corporate level and Volume II is for the Sequoyah site. Revision 4 of Volume I was submitted on March 26, 1987, and Revision 1 of Volume II was submitted April 1, 1987.

The meeting was transcribed. is the agenda for the meeting. is the transcription of the meeting. is the list of those attending the meeting. Enclosure 4 is the material handed out by TVA.

There was no handout from the OSP staff.

k ton w, Jr., Branch Chief

!Sequoyah art Division of TVA Projects Office of Special Projects Enclosures As stated cc: See attached lists DISTRIBUTION Docket File NRC PDR Local PDR NO kOON 7

P

/

j OFC

0SP:DTVA
DTV :
r]N
DTVA:AD/P NAME :CJanerson
JD
JZwolinski

......:...[..----(s- :...........--:---......--...:..----........:--.....--.....:.----........

DATE

5/ /87

(

5/stlT.87
5/[d/87 w

i Sequoyah Nuclear Plant

'E cc:

Tennessee Department of Regional Administrator, Region II Public Health U.S. Nuclear Regulatory Comission, ATTN:

Director, Bureau of 101 Marietta Street, N.W.

Environmental Health Services Atlanta, Georgia 30323 Cordell Hull Building Nashville, Tennessee 37219 Mr. R. W. Cantrell ATTN:

D.L. Williams Mr. Michael H. Mobley, Director Tennessee. Valley Authority Division of Radiological Health 400 West Summit Hill Drive, W12 A12 T.E.R.R.A. Building l

Knoxville, Tennessee 37902 150 9th Avenue North Nashville, Tennessee 37203 Mr. Bob Faas j

Westinghouse Electric Corp.

County Judge P.O. Box 355 Hamilton County Courthouse Pittsburgh, Pennsylvania 15230 Chattanooga, Tennessee 37402 Mr. R. L. Gridley Mr. Richard King i

Tennessee Valley Authority c/o U.S. GA0 SN 1578 Lookout Place 1111 North Shore Drive Chattanooga, Tennessee 37402-2801 Suite 225, Box 194 j

Knoxville.. Tennessee 37919 Mr. M. R. Harding 1

Tennessee Valley Authority Mr. S. A. White Sequoyah Nuclear Plant Manager of Nuclear Power P.O. Box 2000 Tennessee Valley Authority Soddy Daisy, Tennessee 37379 6N~38A Lookout Place 1101 Market Street Resident. Inspector /Sequoyah NP Chattanooga, Tennessee 37402-2801 c/o U.S. Nuclear Regulatory Comission 2600 Igou Ferry Road' Soddy Daisy, Tennessee 37379 t

Mr. H.L. Abercrombie Tennessee Valley Authority Sequoyah Nuclear Plant P.O. Box 2000 Soddy Daisy, Tennessee 37379 i

i u.--.

,,___..._...,_m...,_,___..___,_

DISTRIBUTION FOR MEETING

SUMMARY

DATED: May la, 1987 Facility: Sequoyah Nuclear Plant, Units 1 and 2*

VDecket"Midt NRC Participants NRC PDR

~

J. Donohew Local PDR J. Keppler J. Axelrad S. Ebneter S. R. Connel.ly, OIA S. Richardson C. Jamerson, w/o encl.

J. Zwolinski F. Miraglia B. D. Liaw ACRS (10)

G. Zech, RII OGC-BETH M. Branch E. Jordan J. Partlow Dr. Henry Myers SON F.ile Projects Rdg TVA-Bethesda

~

  • Copy sent to persons on facility service list hs,

sh

TVA-NRC ElCL00Ur.I 1 MEETING AGENDA TENNESSEE RIVER ROOH APRIL 20, 1987 1 P.M. - 4 P.M.

I.

Introduction S. A. White /J. Kepoler Scope / Objectives

Introductions

II. Olscussion of Volume 1 SER NRC Staff III. Otscussion of Open Volume 2 Issues Design and Configuration Control J. A. Kirkebo DBVP s

Design Calculations Environmental Qualification J. A. Xtrkebo Restart Test Program C. H. Fox, Jr.

Heat Code Traceability C. H. Fox, Jr.

H. L. Abercromble Maintenance Surveillance Instructions H. L. Abercrombie H. L. Abercromble Post Modification Functional Testing N. C. Kazanas Quality Assurance CAQR Process QA-EA-ONE Interface Employee Concerns Intimidation and Harassment /

7. 8. Jenkins Wrongdoing Issues Employee Concern Special Program Status (Including Allegations)

M. S. Hartin New Employee Concern Progam Status (Including Allegations)

E. K. 511ger S. A. White /J. Keppler IV. Concluding Remarks

.