ML20214L062

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leakage Rate Test for Braidwood Unit 1,Preoperational Test on 850521-29
ML20214L062
Person / Time
Site: Braidwood 
Issue date: 08/19/1986
From: Johnson I
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20214L065 List:
References
2001K, NUDOCS 8608250072
Download: ML20214L062 (2)


Text

_ _ _ _ _ _,

A }:

Commonwealth Edison

/

One First National Plaza, Chica00, Cnois Address Reply to: Post Omce Box 767 Chicago, lilinois 60690 - 0767 August 19, 1986 Mr. Harold R. Denton U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC. 20555

Subject:

Braidwood Station Units 1 & 2 Integrated Leakage Rate Test Results NRC Docket Nos. 50-456 and 50-457

References:

(a)

April 19, 1983 letter from F.G. Lentine to H.R. Denton (b)

July 7, 1983 letter from F.G.

Lentine to H.R. Denton

Dear Mr. Denton:

Enclosed is the technical report summary of the Braidwood Unit 1 preoperational reactor containment building integrated leakage rate test as provided in Attachment 1.

This is being submitted pursuant to the requirements of 10CFR 50, Appendix J,Section V.

The enclosed report describes the initial type A containment leakage rate test conducted in accordance with the requirements of Appendix J except as noted in references (a) and (b).

This test was witnessed by Mr. F. Maura, NRC Region III.

The results of this test have been reviewed in accordance with Commonwealth Edison Company procedures and have been accepted by our Project Engineering Department.

The maximum allowable test leakage rate, LT, can be calculated from Attachment 1 to be approximately 0.0707.

This number should be inserted in the Braidwood Proof and Review Tech Spec, Section 3.6.1.2 (Containment Leakage) page 3/4 6-2.

DOCkhkhhD S6 POR g

g

]

_- Please direct any questions you may have regarding this matter to this office.

One signed original and attachment is being transmitted for your use along with fifteen (15) copies.

Very truly yours,

,y fM I. M. Johnson Nuclear Licensing Administrator

/klj :

Reactor Containment Building Integrated Leakage Rate Test for Braidwood Unit 1 cc:

J.

Stevens 200lK

,