Monthly Operating Rept for Jul 1986
ML20214K486
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/31/1986
From: Woodard J
ALABAMA POWER CO.
To:
Shared Package
ML20214K484 List:
References
NUDOCS 8608210123
Download: ML20214K486 (7)


Text

,.

e

..e JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE SIMfARY OF OPERATIONS July, 1986

,.During.the month of July, there was one unit shutdown which occurred on July 2,.1986.

A reactor. trip' occurred.as a result of a dropped control rod. A short occurred.in an electrical-penetration module between the two-conductors' supplying power to the stationary gripper coil.

The following major-safety-related maintenance was' performed in the month of July:

1.

Miscellaneous corrective and preventive maintenance was performed on diesel generators.

2.

Rerouted rod control electrical cables due to a short which occurred in a. containment electrical penetration on 7-2-86.

Also, electrical cables were rerouted to two other control rods when low resistance was found between the conductors.

3.

Performed yearly scheduled maintenance on the IB diesel generator.'

4.

The lA charging pump was taken out of service (elective) to replace the rotating assembly.

5.

Corrective maintenance was performed on the motor driven fire pump.

h820123860814 R

DOCK 05000348 PDR

r-OPERATING DATA REPORT DOCKET NO. 50-348 DATE August 5, 1986 COMPf.ETED SY J. D. Woodard

~

TEl.EPHONE onsiR99-5156 s

OPERATING STATUS Joseph M. Farley - Unit 1 tytes

l. Unit Name:

July, 1986

1) Cumulative data since
2. Reporting Period:

2

3. IJceasedThermalPower(MWt):

12-1-77, date of commercial

4. Namepiste Rating (Gross MWe):

operation 829

5. Demen Electrical Rasms(Net MWe):

873.4

6. Maxianuma C:, " ": Capacity (Gross MWe):

827.5

7. Maximana C,7 ": Capacity (Net MWe):
8. If Changp in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Resencted.If Any/A(Net MWe):

N/A N

10. Reasons For Restrictions. If Any:

O This Month Yr..to.Date Cumulative i

744 5,087 75,959

11. Hours in Reportug Period
  1. 2U*D
12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
13. Reactor Reserve Shutdown Hours 711.6 4,w3.3 33,4uu.9
14. Hours Generator On.Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 1,846,629 12,892,512 135,764,054
16. Gross Thermal Energy Generated (MWH) 597,758 4,248,844 43,552,224
17. Gross Electncal Energy Generated (MWH) 565,850 4,030,184 41,027,902
18. Net Electrical Energy Generated (MWH) 95.6 98.2 70.3
19. Unit Service Factor 95.6 98.2 70.3
20. Unit Avadabdity Factor 91.9 95.7 67.4
21. Unit Capacity Factor (Using MDC Net) 91.7 95.6 65.2
22. Unit Capacity Factor (Using DER Net) 4.3 1.8 10.8
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Esch):

Refueline/ Maintenance Outane. 10/4/86, approximately for~tve fdur days N/A

25. If Shut Down At End Of Report Pericd. Estimated Date of Startup:
26. Units in Test Status iPrior to Commercial Operation):

Forecast Achieved 08/06/77 08/09/77 INITIAL CRITICALITY INITIAL ELECTRICITY 12/01/77 12/01/77 COMMERCIAL OPERATION l

l l

(4/771 ii___.-___. -_ _ _. _. _ _ _. _. _. _ _ _ -. _ _. _ _ _ _, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

~

DOC)2TNO.

50-348 I

UNIT DATE August 5, 1986 COMPLETED BY J. D. Woodard

, TELEPHONE (205) 899-5156 M0NTl!

3"1Y

/

DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL

@lWe Net)

OlWe-Net) 808 808 g,

g7 2

523 13 805

--~"---O-y

[9--

804 805 4'

485 20 806 806 g

3 6

808 22 809 809 809 7

3 4

810 811 g

24

. O9 8o8 25-8o7-810 10 807 26 810 gg 805 27 807 12 73 go7 807 808 y

33 809 14 30 802 15 811 31 806 16 809 1

ELTTRUCUONS On this formar. list the aversge daily unit power levelin MWe Net for each d:y in the reporting month. Compute to

, the neare:t whole rnesswatt.

(9(77)

O

V N

~

5D-348 UNIT Silu1 DOWNS AND POWER REDUCI10NS DOCKETNO. _

UNIT NAME J. M. Farley-Unit 1 DATE August 6, 1986 HEPOllTAf0 Nill July COMPLETED BY J. D. Woodard TEELPilONE (205) 899-S Q6 5

)j h r;

.3 u, =

"i:

c r.

g%

C'"'* & C'"'i""

'g o k,

'8 5 L8' I

M c#D*

1 N

o s a:

Evcns a 3'r' q

Aciliui en I

N"-

-y

.x i

Ob N

C RcIunt u P#I'""I REC""'"'"

u 2

d

=

?

004 860702 F

32.4 A

3 86-008-00 AA PEN A reactor trip occurred as a result of a dropped control rod.

A short occur-red in the containment electrical j

penetration module between the two con-l ductors supplying power to the stationary gripper coil of the rod.

l The associated fuses for the conductors l

were also blown. The affected circuits were, rerouted through spare terminals 3

in the penetration. The blown fuses were replaced and all other control rod drive system cables were checked ji for grounds orshorts. No other

!j shorted or grounded conductors were l 1 found.

1 1

1 2

3 4

F: Fosced Meason:

Method:

Exhibit G - Insisuctions I

S: Stheiluted A Equipment Failuse(Explain) 1-Manual for Psepasaisim of Data j

ll Maintenance of Test 2 Manual Sesam.

Ensey Sheets (os 1icensee 1

0-Refueling 3 Automatic Scram.

Evens Repens (i.ER) file INUREG--

D-Regulasiuy Resisiccion 4.Oslics (Explain) 0161)

E-Opesaios Tsaining & l.icense Examination il F Adminisisasive 5

G Openaliimal Essus (Explain) j

('s/77) ll Othes (Explain)

Exhibit I + Same Simsee t

I i

3 y'

l.

j.

t JOSEPH M. FARLEY NUCLEAR PLANT ADDENDUM CONCERNING REVISION 2 TO THE OFFSITE DOSE CALCULATION MANUAL'-

Revision 2 to the Offsite Dose Calculation Manual' (ODCM) was approved by the PORC on July 11, 1986.'

It was determined by the PORC

. that these changes will not reduce the accuracy or reliability of dose calculations or setpoint determinations.

The ODCM was revised because Revision 1 of the ODCM did not clarify

. which of the radiological environmental _ monitoring stations. at Farley

' Nuclear Plant are required by Technic.al Specifications.

This revision distinguishes between those stations and the ones that are provided as additional precautions. ' Revision 2 also designated alternate forage locations to be used when the primary locations are not available. -The remainder of the changes were made to improve readability and to correct-typographical errors.

The ODCM applies to both Unit 1 and Unit 2 at Farley Nuclear-Plant.