ML20214K242
| ML20214K242 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/22/1986 |
| From: | Foster D GEORGIA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-1083, NUDOCS 8612020238 | |
| Download: ML20214K242 (1) | |
Text
Georgia Fower Company Fbst Office Box 282 Waynesboro, Georgia 30830 Telephone 404 554 9961, Ext. 3360 404 724 8114. Ext. 3360 h
hB h $g3\\
Georgia Power a o. rost.,
fV ePres ent me sapern electrc systern September 22, 1986 7
,/
United States Nuclear Regulatory Commission Region II File:
X7BG03-M125 Suite 2900 Log:
GN-1083 101 Marietta Street, Northwest Atlanta, Georgia 30323
Reference:
Vogtle Electric Generating Plant-Units 1 and 2; 50-424, 50-425; Powerstrut Conduit Clamps Attention:
Mr. J. Nelson Grace On August 27, 1986, Mr.
R.
E.
Folker, Vogtle Project Quality Assurance Engineer, informed Mr.
E.
F.
Christnot of the USNRC Region II of a potentially reportable condition concerning the installation of some oversized Powerstrut conduit clamps.
Quality Control inspections identified some conduit support installations that did not firmly secure the conduit.
Georgia Power Company is currently evaluating this condition and expects to inform the NRC of the evaluation results by November 25, 1986.
This response contains no proprietary information and may be placed in the NRC Document Room.
Yours truly,,
/
A
. O. Fos [er REF/00F/tdm xc:
U. S. Nuclear Regulatory Commission rgi ne Document Control Desk NE@
Washington, D. C.
20555 to o@
J. H. Miller R. A. Thomas L. T. Gucwa mo J. P. O'Reilly D. R. Altman C. W. Hayes m2 G. F. Head P. R. Bemis G. A. McCarley 08 R. E. Conway J. A. Bailey R. W. McManus J. T. Beckham
- 0. Batum D. S. Read o
R. H. Pinson G. Bockhold Sr. Resident (NRC)
"e P. D. Rice C. E. Belflower C. C. Garrett (OPC) g2-7
$q B. M. Guthrie J. F. D'Amico J. E. Joiner (TSLA)
D. E. Dutton E. D. Groover D. Feig (GANE) s/0 MM
_