ML20214J961

From kanterella
Jump to navigation Jump to search
Requests Ack of Receipt of Procedure GO-EIP-112,Temporary Change Notice 6A,by Completion of Encl Transmittal.W/O Encl
ML20214J961
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/17/1986
From: Mccracken K
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8612020092
Download: ML20214J961 (1)


Text

_ _,

o 9-North 18 S re t Post Office Box 2641

Birmingham A!abama 35291 Telephone 205 250-1000 86 UOV 21 a9: 2g Al bamaPbwer the southem electrc system November 17, 1986 So-312 So" 94 U. S. Nuclear Regulatory Comission Region II Suite 3100 101 Marietta Street N.W.

Atlanta, Ga 30303

Dear Sir:

We are reviewing our current procedure files. Our records show that we have transmitted the procedure (s) G0-EIP-112 TCN6A, but we have no verification of acknowledgment of receipt. This is a first request.

If you are holding this procedure, please complete the attached transmittal so that we may verify your receipt of this document in accordance with our document control procedures. After completing the transmittal, return it to the address below.

Alabama Power Company P. O. Box 2641 Birmingham, AL 35291-0432 Attn: Malinda Fells If you are missing the procedure or if you have any questions, please contact Malinda Fells at (205) 250-1875.

\\{.0 W K. W. McCracken KWMc:maf Attachment SLMJ it DRV diuisiet.

D/2 ggK05000348 ~

2 861117 R

P PDR i0 IES

..