Informs That Description of C-E 2,825 Mwt Sys 80 NSSS & Discussion of 2,825 Mwt Sys 80 NSSS,C-E/NRC Meeting 861024, Being Withheld from Public Disclosure Per 10CFR2.790
ML20214J425
Person / Time
Issue date: 11/19/1986
From: Knighton G
Office of Nuclear Reactor Regulation
To: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 8612010306
Download: ML20214J425 (3)


Text

I c,df "C%

I

[9 UNITED STATES e

g NUCLEAR REGULATORY COMMISSION E

-- [

WASHINGTON, D. C. 20555 o,,,

a

/

NOV 191986 Mr. A. E. Scherer, Director Nuclear Licensino Combustion Engineering, Inc.

Post Office Box 500 Windsor, Connecticut 06095-0500

Dear Mr. Scherer:

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By your letter and affidavit dated October 27, 1966, you submitted "A Description of the Combustion Engineerino 2825 PW(t) System 80 Nuclear Steam Supply System" and"Discussionof2825MW(t) System 80NuclearSteamSupplySteam,C-E/NRC Meeting, October 24, 1986" and requested that the letter and the documents be withheld from public disclosure pursuant to 10 CFR 2.790. Subsequently, a non-proprietary version of the transmittal letter was forwarded November 10, 1986.

You stated that the submitted information should be corsidered excmpt from mandatory public disclosure for the following reasons: The information is of d type Customarily held in confidence by Combustion Engineering (CE), is not available in public sources, its disclosure would likely cause substantial harm to the competitive position of CE and its development is the result of substantial effort dnd considerable sum of money.

We have reviewed your application and the material based on the requirements and criteri6 of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains trade secrets or prcprittary commercial information.

Therefore, the documents discussed above have been designated as proprietary and will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the dppropriate agreements for handling proprietary information.

TDM S.E.

8612010306 861119

{DR TOPRP ENVC-E PDR

9 9,

.1

. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, such as, if the scope of a Freedom of Information Act request includes your information.

In all review situations if the NRC makes a determination

. adverse to the above, you will be notified in advance of any public disclosure.

Sincerely,

/>

George W. Knighton, Director PWR Project Directorate No. 7 Division of PWR Licensing-B cc: See next page DISTRIBUTION vDocket File PDR LPDR PRC System PD7 Reading GDick EShomaker NRushbrook JLee

,f, i f

(

PW$1

_0E D

G7 h

lik MRtMhbrook EShomaker G

. ton 11/7/86 11/1T/86 11/[/86 1

/86 11//3/86 1

Conbustion Engineering, Inc.

Docket No. STN 50-470 (CESSAR) cc w/o enclosure:

Mr. G. Davis, Manager Standard Plant Licensing 1000 Prospect Hill Road Windsor, Connecticut 06095 Mr. C. B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Bethesda, Maryland 20014 Mr. E. E. Van Brunt, Jr.

Vice President - Construction Projects Arizona Public Service Company P. O. Box 21666 Phoenix, Arizona 85036 i'

Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Mr. Daniel F. Giessing Division of Nuclear Regulation and Safety Office of Converter Reactor Deployment, NE-12 Office of Nuclear Energy Washington, D.C.

20545 Fr. Douglas Coleman f.icensing Project Manager Washinoton Public Power Supply System P. O. Box 1223 Elma, Washington 98541

!