Responds to NRC Ltr Re Violations Noted in Insp Repts 50-327/87-08 & 50-328/87-08.Corrective Actions:Concurs W/ Listed Inferred Licensee Commitments,Including Paragraph 4, Unresolved Items
ML20214J390
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/15/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8705280035
Download: ML20214J390 (2)


Text

-

.+.

~ '

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ol '

SN 157B Lookout. Place MAY 151987 4-

-U.S. Nuclear Regulatory Comission ATTN: Document-Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

).

50-328 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 - INSPECTION REPORT NOS. 50-327,

-328/87 INFERRED COMMITMENT ACKNOWLEDGEMENT TVA has received NRC Inspection Report Nos. 50-327/87-08 and'50-328/87-08 dated April 10, 1987, and provides the following with respect to inferred -

I licensee comitments cited therein:

o Paragraph 4, " Unresolved Items," URI 327, 328/87-02-03, states, j

"The-licensee has stated that permanent control building roof repairs will be made prior to escalation into mode 4."

TVA herewith provides its concurrence with this commitment.

l o

Paragraph 7. " Monthly Surveillance Observations," subparagraph "TS 5.5.1," provides that a technical specification change request will be submitted to NRC before restart of unit 2'to correct the discrepancy.wherein the meteorological tower is not shown on figure 5.5-1 as specified by technical specification 5.5.1.

TVA herewith provides its' concurrence with this j

commitment.

i o

Paragraph 13. " Inspector Followup Items," states (with respect to closure of IFI's 327,'328/85-46-08 and 327, 328/86-20-01),

"The licensee determined that four. outstanding temporary I

alterations required review and/or correction prior to the l

startup of Unit 2."

This' statement is incorrect in that two of the four cited temporary alterations are related to unit 1 only and, therefore, are not required to be complete until restart'of that unit. Accordingly, the statement should be,'"The licensee j

determined that four outstanding temporary alterations required review and/or correction before restart of the respective '

affected unit." TVA herewith provides its concurrence with the conunitment as revised above.

l

{$'"$005 050Shj7 f/

i 4

An Equal Opportunity Employer

..~

9

,. U.S. Nuclear Regulatory Commission n4ALY 151987 If you have any questions, please call G. B. Kirk at (615) 870-6549.

Very truly yours, TENNESSEE VALLEY AUTHORITY ik R. Gridley, Di ector Nuclear Safety and Licensing ec:

Mr. G. G. Zech, Assistant Director for Inspection Programs Office of Special-Projects U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

.