ML20214H890
| ML20214H890 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/30/1986 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NT-86-0513, NT-86-513, NUDOCS 8612010079 | |
| Download: ML20214H890 (3) | |
Text
_._. _... _ _ _ _ _ _ _
Farley h-1==r Plant AL 0024619 P=retit Analytical Cause of To it Period of Noncompliares Diacanarque Point Paraantar Limit Value Noncompliance Corrective Moemmes g3 Seeen Ended III Seemse P3mt Pocal Califorat 300 org/100 ml 3355 org/10 ml The ch3crine apply A prowentive meinta-7/11/86 7/10/86 7/13/M (009) line brales ultican nonce gnogen was m11,==4 the rata===
estah14=had to re-of votar with an in-place tening annually.
aufficiant ct:3crine r==fA=1 Sammen P3mt TSS 45 mg/l 77 ag/l This resultad front A work regaaet wee 8/15/86 Indstar=innata Sample (009) a bedsf3 car of wotar modo to zeroute this front 8/19/86 through 009's dis-diar +=rge to prevent revealed a TSS value dierge line into bedsf3 car frcot cocturing of 6 ag/l the final affluent and should be initiated citester.
the 4th gaertar of 1986.
Transformer 011 20 mg/l 24 mg/l Indstar=irtete A study of 021 is in 7/29/86 Indetersunate Aree Oil progrees to d=*ar=ina Soperator Ckeese that action is (021) necnesory to actaisve compliance.
II Somega P3 ant pH 9.0 sou.
10.09 s.u.
A valve failad titic21 Procedtral change 9/30 /86 9/26/06 9/30/86 (014) alle==d Swat to ladt were i=Tita===*=d to by and be Islaased am p3a 328 in the fram the water wrps pesar ta tr==*==at plant may if an SW38 ta k is te (WIPS) semita a McGi be placed on recircu-tank won being re-1 eines, circulated.
(1)
Y=dirme== data afflamat =hr=ild hoe retaned within permit 11mLta.
(2)
Y=dtr=**= data mii-could heue hopm.
8612010079 mf60130 PDR ADOCK 05000348 R
PDR e\\u
- h 11 8
hk,$
$!1 8
e1a I
18 g
11 s
il n n i.
~~'*"-*-v,--
NT 86-0513 Alabama Power Company I
600 North 18th Street Post office Box 2641 l
Birmingham, Alabama 35291-0400 Telephone 205 250-1835 g
i AlabamaPower enio V ce r sident November 4, 1986 i
Dr. J. N. Grace U. S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street l
Atlanta, Georgia 30323 1
Subject:
J. M. Farley Nuclear Plant NPDES Noncompliance Report l
l
Dear Dr. Grace:
l In accordance with the J. M. Farley Nuclear Plant Technical l
Specifications Appendix B, Section 3.2, please find attached a sunnary of NPDES noncompliances for the third quarter of 1986.
Should you have further questions, please advise.
l Yours very t GT9, CNh '
t> '
R. P. Mcdonald l
RPM / MAT emb l
Attachment xc Mr. W. H. Bradford (w/ attachment) l 1
. r,
-