Forwards Engineering Assurance Oversight Review Rept,Design Baseline & Verification Program. Rept Presents Results of Review on Phase I Activities.Open Action Items Prepared for Action
ML20214H442
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/15/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20214H443 List:
References
NUDOCS 8705270386
Download: ML20214H442 (2)


Text

Y I

' ~

t by- o 3

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA, TENNESSEE 37401 SN 157B Lookout Place MAY 151987 U.S. Nuclear Regulatory Connaissio

-ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) UNIT 2 - ENGINEERING ASSURANCE (EA) OVERSIGHT REVIEW REPORT FOR THE DESIGN BASELINE AND VERIFICATION PROGRAM (DBVP)

In accordance with a request from Eugene Imbro of your staff during an NRC

-inspection team exit meeting on March 13, 1987, enclosed for use in NRC's evaluation of SQN's DBVP is the following report:

Engineering Assurance Over31ght Review Report, Sequoyah Nuclear Plant -

Unit 2, Design Baseline and Verification Program, EA-OR-001, May 14, 1986 through March 31, 1987.

The enclosed report presents the results of reviews performed by the EA Oversight Review Team on the Phase I DBVP activities. The open action items remaining from the reviews have been evaluated and observations or condition Adverse to Quality Reports-(CAQRs) have been prepared, as appropriate, for action by responsible TVA organizations. Closing these items will complete the EA review of Phase I of the DBVP. Although the schedule for closure

depends upon other work underway.at SQN, these items will be the subject of a supplemental report to be issued by EA befort unit 2 restart.

i Additional copies of this report are available from the TVA Licensing Office i in Bethesda, Maryland. Please telephone T. A. Ippolito at (301) 492-5718 if

. you need more copies.

l If you have any questions concerning this issue, telephone call Beth L. Hall,

' of the SQN Site-. Licensing Staff, at (615) 870-7459.

Very truly yours, TENNESSEE VALLEY AUTHORITY l

/

R. Gridley, D ector Nuclear Safet and Licensing Enclosure cc: see page 2 ER51883I5's88h7 30 P

An Equal Opportunity Employer

g I o U.S. Nuclear Regulatory Commission ll/0f 151987 cc (Enclosure):

Mr. G. G. Zech, Assistant Director for Inspection Programs office of Special Projects U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

.