ML20214G940

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Table 3-1,Section A-1 Concerning Personnel & Section C Re QA Program of Fire Protection Evaluation
ML20214G940
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/19/1978
From: Haass W
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
CON-WNP-0223, CON-WNP-223 NUDOCS 8605230064
Download: ML20214G940 (3)


Text

.

ION:

O dk b ~3 ~

QAB Projec.3 _ ,

~JConway, PM:QAB

. FAllenspach, QAB AGarland, PM:QAB k WPHaass, PM:QAB -

DJSkovholt, PM:ADQA0

/ JUN 191978 RCDeYoung, PM:DD L

Docket flo. 50-397 MEliORANDUM FOR: S. Varga Chief, LWR Branch #4, DPH FROM: W. P. Haass, Chief, Quality Assurance Branch, DP!1

SUBJECT:

FIRE PROTECTION REVIEW - WPPSS flUCLEAR PROJECT NO. 2 -

QUALITY ASSURANCE BRANCH Applicant: Washington Public Power Supply System (WPPSS)

Licensing Stage: Fire Protection Review Responsible Branch: LWR #4 Project Manager: D. Lynch Review Status: Q-l's Complete The Quality Assurance Branch has evaluated Table 3-1 Sections A-1 (Personnel) and C (Quality Assurance Program) of the WPPSS " Fire Pro-tection Evaluation" for the WPPSS Nuclear Project No. 2, submitted with the Renberger/Varga letter dated ?!ovember 3,1977.

A request'for additional infomation relative to these sections is enclosed.

Originalsigned by Walter P. Haass W. P. Haass, Chief Quality /ssurance Brahch Division of Project Management

Enclosure:

Request for Additional Information -

WPPSS Nuclear Project No. 2 y\\ c W C i ,'

cc w/ enclosure:

D. Lynch, LWR #4 - - - - - -

P. flatthews , DSS '

P. Hearn, DSS 773390272 8605230064 780619 PDR ADOCK 05000397 p PDR m o rrie s

  • EMLOAB PM:QAB ,_,,,,,

PM: QAVjh PM:QA%

evnaanes

  • nway:J1.1 EAllenspAcif 2... r.] an [ _ W&taass -

Davs

  • 78 6/ /)./28._ .. . 61b2h .3//[/78 ~

Forum ABC.318 (Rev. M3) itEOE 0240 W u. s. oovsaamsar raente=e orrics e s,4.sae.soe l

REQUEST FOR ADDITI0ilAL IrlFORMATION WPPSS NUCLEAR PROJECT N0. 2 421.1 The Quality Assurance (QA) program for fire protection should be under the management control of the QA organization. This control consists of (1) formulating or verifying that a fire pro'ection t

QA program incorporates suitable requirements and is acceptable to management responsible for fire protection; and (2) verifying the effectiveness of the QA program for fire protection through review, surveillance, and audit. Revise your submittal contained in your " Fire Protection Evaluation" for WPPSS No. 2 to clarify that the QA program for fire protection is under the management control of QA, or provide an alternative position for the staff's evaluation.

421.2 Mr. Vassallo's letter of August 29, 1977 on fire protection provides supplemental guidance on QA. Modify your submittal contained in your

" Fire Protection Evaluation" for WPPSS No. 2 to be responsive to this latest supplemental guidance on QA for fire protection or provide an alternative for the staff's evaluation. We note that if the fire protection QA program criteria are met as part of the-QA program (Chapter 17 of FSAR) which meets Appendix 0 to 10 CFR 50, it is not necessary to submit a detailed description for f!RC review.

REQUEST FOR ADDITIONAL INFORMATION WPPSS NUCLEAR PROJECT NO. 2 422.1 You state that the Plant Superintendent is responsible for fire protection activities at the plant level. Describe any further delegation of these responsibilities for the fire protection program such as maintenance of fire protection systems, testing of fire protection equipment, fire safety inspections, fire fighting procedures, and fire drills.

422.2 ~ Describe the proposed composition of your plant fire brigade.

e 4

. .