ML20214G850

From kanterella
Jump to navigation Jump to search
Notification of ACRS Subcommittee 720930 Meeting in Richland,Wa on Facility
ML20214G850
Person / Time
Site: Columbia 
Issue date: 09/28/1972
From: Miner S
US ATOMIC ENERGY COMMISSION (AEC)
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0096, CON-WNP-96 NUDOCS 8605220559
Download: ML20214G850 (1)


Text

-

Docket No. 50-397 A. Giambusso, Deputy Director for Reactor Projects, L TEEUs R. A. Clark, Chief, Sas cooled monotors Branch, L FORTNCONDIG ACRS SUBC00MITTEE MEETING ON R& WORD NO. 2 Time and Dates 8:00 a.m.

September 30, 1972 Location:

Richland, Washington Purposes Subcommittee review

Participants:

AEC - S. Miner, R. A. Clark ACRS - W. J. Kaufman, W. R. Stratton, S. E. Bush Origip;) signed by Syduty I,'anu Sydney Miner, Project Manager Gas Cooled Reactors Bransh Directorate of Licensing cc:

R. S. Boyd

{

D. Skovholt D. Muller M. Minogue R. Maccary E. Knuth R. Tedesco H. Denton R. P. Fraley BWR Branch Chiefs l

W. Mas sa m0 (4 )'

DISTRIBUTION:

DOCKET RP Reading EKE GCR Reading L:GCo L:GCR

.....p.... M..

fg..

l omer >

SMinnr;jkm RClark

]

r-ucii.m. _9p.3 2.2..

-9/ 2 /7L

==,m.

l unv

/

.is, ucu.

.o,m.....~.-~

......n3.....

8605220559 720928 PDR ADOCK 05000397 D

PDR

Distributier:

Docket SC-37 4 % c..

PP Riading SEP 2 21972 GOP3 Reading S. Miner f{

Docket No.50-37T t

R. L. Carrou, Staff Accountant, Accounting Procedures Brench, OC FINANCIAL INFORMATION - WASHING' ION PUBLIC POWER SUPPLY SYSTEM, HANFORD NUMBER 2 - AMENDENT NO.13 Financial informaticn for your information and review is included in the enclosed Anendment No.13, dated september 14, 1972, for the Washington Public Power Supply System's Hanford Nunber 2 Please let te know if further information is required.

ORIGINAL SIGNED BY DARREll.G ElsENilUT Bobert A. Clark, Chief Oas Cooled Besctors Brench Directorate of Licensing

Enclosure:

/mendment Nc. 13 omc >

..ldhF3.......

MCCPE.*...

.,2,,,,,

h@%

'k summaut>.. 1(9f.

...h. o.....

~

.......................l 9 M / 72 9/_1/7

_D43 >

y Poem AIC.lle iRev. 9-Sh AECM 0200

r. s. counanar encumo op nr ino o. eos-w nt OI d7'"

i 1

v i

i I

SEP 12197g Docket No, 50-397 F.syneed L. Carroll Accounting Pttmedurea treach Office of the Centro 11er MiSRINWr0tt PUBLIC POWER SUFFLT CTSTTM - EABFORD NDH1ER TWO NUCLEAR PLutT tinder saprete cover, we have forwarded to you Amendsnmt 1:o.10, dated Aegust 21, 1972, to the applicatists filed by the Washington Public Fewer Surply Sy. stem for authorisation to construct the Hanford thenbar Two Nucisar Flaat et the AEC Hanford Rosarvation eita in Benton County, Washingtou. The proposed tenctor is of the boilian unter type and is designed for initial operation at 3323 ther.ual metauetca.

The annendment states that the cost for the plaat in estimated to be 4406,768,000, ese.luefva of tramanission and fuel costs. Assun-ing an initial capacity of 1100 MWe, the unir cost for the reactor is $370/kw. The construction tests are ressor.able,for a plant of this design and power level.

a=aa h t No. 11 to the same application, dated August 29, 1971, has also been tramanitted to you. This emes &sent toosiota of fiasacial s.:stamants.for sach el tbt peticipatin,t utilitise that are required to support the VFPSS finar.cial qualitiestion.

We would apprecia'.e receiving pur f.estinaeay en t. Sis information as soon as possible.

0.'! !ns! !;..cd by Rchert A. Clark l

Bebert A. Clark, Chief Cao Coo?.ed Lepetard Brmach Ditsetorate of Licensing Enclosu. ras (under Distribution:

    • Parata cover)

$)---. Mocker File W. Mrs.9ar. OGC 1.

Aswediment No.10 kP Readirlh H. Gearfn (2) l 2.

Amealment ho. 11 cca Readirig

3. Miner onkt>.L:Byh.

.. $,:GCK 14

.Of' suaNaut, l.HGea r innb RAClark t

9// M.72 I 9/IS-/ 72

..........l_

ourn f orm 4 6 C-913 g N es

4. H : M..M o,o e*w ee r 6* -she e ear-.

I

- 84d997wz@7--Jy; 1

.