ML20214G823

From kanterella
Jump to navigation Jump to search
Notification of 731017-18 Meetings W/Util,B&R & GE in Bethesda,Md to Discuss Status of Outstanding Items Included in Util Schedule for Resolution.Meeting Agenda Encl
ML20214G823
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/03/1973
From: Elliott D
US ATOMIC ENERGY COMMISSION (AEC)
To: Butler W
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0092, CON-WNP-92 NUDOCS 8605220540
Download: ML20214G823 (2)


Text

E

.&Al Vib g"')', +,,

UNITED ST A TES

)

f D.)},%

ATOMIC ENERGY COMMISSIG.'1 hhv * !

1

% r Q) f

%n s'

& f,(47$

Docket l'o. 50-397 Walter R. Butler, Chief, Boiling Water Reactors Branch 1, L FORTHCOMING MEETING WITil WASHINGTON PUBLIC POWER SUPNLY SYSTEM - HANFORD NO. 2 TTME:

9:00 A. M.

DATE:

October 17, 1973 October 18, 1973 LOCATION:

Room 100 - Woodmont (Oct. 17)

Room P-130A (Oct. 18)

PURPOSE:

Post-CP Meeting Determination of thq, status of outstanding iteis including the schedule of their resolution.

(Agenda attached)

PARTICIPANTS:

AEC - D. Elliott, W. Butler, S. Miner, G. Lainas, J. Richardson, C. Long, D. Tondi, A. Cluckman, T. Novak WPPSS - C. Fies, et al Burns and Roe General Electric D. Elliott Project Manager Boiling Water Reactors Branch 1 Directorate of Licensing

[

DISTRIBUTION:

Docket File (s)

RP Assistant Directors AEC PDR TR Assistant Directors Local PDR RP Branch Chiefs BWR-1 File TR Branch Chiefs L Reading Project Manager RP Reading EP Project Manager EGCase Licensing Assistant AGiambusso Receptionist RSBoyd VAXoore Proposed Principal Attendecs:

!i. Miner, C. Lainas, J. Richardson, C. Long, Jllendrie D. Tondi, A. Gluckman, T. Novak RFFraley, ACRS R. Loose l

l Regulatory Op_.v.arions (3) 8605220540 731003 PDR ADOCK 05000397 PDR L

i AGENDA MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM October 17-18, 1G73

'A.

Introdoction B.

Presentation by WPPSS of:

(Requested TR Participation) 1.

Recirculating Pump Control Valve Design D. Tondi, T. Novak 2.

Drywell Vacuum Breaker Design G. Lainas 3.

Drywell Floor to Containment Vessel Seal Design G. Lainas 4.

Drywell Floor Seal G. Lainas 5.

Post LOCA H Control G. Lainas 2

6.

Design Criteria for Inactive Pumps and Valves J. Richardson 7.

Pipe Whip Inside Containment J. Richardson 8.

High Energy Pipe Brc.sk Outside Containment J. Richardson, C. Long 9.

M.S.I. Valve Seal System C. Long 10.

Ultimate Heat Sink-Tornado C. Long C.

Summary and Conclusion