Motion for 2-day Extension of Time to File Brief in Response to Georgians Against Nuclear Energy Appeal Brief & Proposed Findings Re ASLB Decisions.Granted on 861125.Certificate of Svc Encl
ML20214G811
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/21/1986
From: Bordenick B
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To:
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
References
CON-#486-1647 OL, NUDOCS 8611260193
Download: ML20214G811 (3)


Text

.

(M1

,e UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 00gED BEFORETHEATOMICSAFETYANDLICENSINGAPPEALBgg 5 R210 GFFtLE.

t In the Matter of

)

00CKET w.

)

GEORGIA POWER COMPANY et al.

s.

-4 40 v."*

N T N M eaf 903r6 (Vogtle Electric Generating

)

Plant, Units 1 and 2)

)

O_. b -3 N u

b

~~ fparv to the Appeal Bo TWO DAY NRC STAFF'S MOTION EXTENSION OF TIME WITHIN WHICH TO FILE ITS BRIEF The NRC Staff requests a two day extension of time, until Novem-ber 26, 1986, to file its brief in response to Georgians Against Nuclear Energy's (GANE's) " Appeal Brief and Proposed Findings Concern-ing Licensing Board Decisions."

The Staff's response is due to be filed on November 24, 1906.

The Staff's brief was in the final stages of preparation on the morning of November 21, 1986, when the Staff's word processing unit failed.

This failure caused all material which was being worked on in the system to be destroyed.

The entire draft version of the Staff's brief (about 50 pages) must now be completely retyped.

The Staff originally thought that the werd processing unit could be repaired within a few hours and naterial in the system was not destroyed.

However, it now has become apparent that the unit will be out of service throughout November 21, 1986 and that all material being worked on in the system was destroyed.

The Staff has communicated this request for an extension of time to the Applicants and they have no objection to this request.

Staff 8611260193 861121 PDR ADOCK 05000424 G

PDR Q

?

Counsel was unsuccessful in his attempt to contact a representative of GANE.

However, Staff Counsel believes that under the circumstances GANE will not be prejudiced by the requested two day extension of time within which to file the Staff's brief.

Respectfully submitted, hf M Bernard M. Bord 4 nick Counsel for NRC Staff Dated at Bethesda, Maryland This 21st day of November, 1986 t

i I

r-a 00thfiEP UWC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

'86 NOV 25 Pl2 :10 ATOMIC SAFETY AND LICENSING APPEAL BOAg g.,

j,

00Chtiith & ' 2iMJ

)

Bh A M:"

In the Matter of

)

)

GEORGIA POWER COMPANY, ET AL. )

Docket Nos. 50-424 OL

)

50-425 OL (Vogtle Electric Generating

)

Plant, Units 1 and 2)

)

)

CERTIFICATE OF SERVICE I hereby certify that, on this 24th day of November, 1986, I mailed a copy of the Appeal Board's grant by stamp endorsement of "NRC Staff's Motion for a Two Day Extension of Time Within Which to File Its Brief," dated November 21, 1986, to each of the following:

Bruce W. Churchill, Esq.

Bernard M. Bordenick, Esq.

Shaw, Pittman, Potts &

Office of the General Counsel /

Trowbridge Bethesda 2300 N Street, N.W.

U.S. Nuclear Regulatory Washington, D.C.

20037 Commission Washington, D.C. 20555 Carol Stangler 425 Euclid Terrace Docketing & Service Branch Atlanta, GA 30307 Office of the Secretary U.S. Nuclear Regulatory Commission Washington, D.C. 20555

/.

Q O _ __\\ N _ _-

A C. Je(t)ary to the Appeal Shoemaker Secre Board

--