ML20214G797

From kanterella
Jump to navigation Jump to search
Reassigns Review Responsibility for Facility
ML20214G797
Person / Time
Site: Columbia 
Issue date: 07/02/1975
From: Deyoung R
Office of Nuclear Reactor Regulation
To: Butler W, Parr O
Office of Nuclear Reactor Regulation
References
CON-WNP-0033, CON-WNP-33 NUDOCS 8605220517
Download: ML20214G797 (1)


Text

Distribution Docket File RL BC's RWKlecker LWR 1-3 File TR BC's CMiles EGCase OELD (3)

IVi11alva ML 0 2 M AGiambusso OMIPC VHWilson Y

Docket No. 50-397 FSchroeder DLanham (3)

RFraley (1)

RL AD's CStevens, Secy TR AD's SKari Walter Butler, Chief. Light Water Ranctors Project Branch 1-2, DRL Olan D. Parr, Chief Light Water Reactors Project Branch 1-3, DRL REASSIGh7fCIT OF REVIEW RESPONSIBILITY FOR Tile WPPSS NUCLEAR PROJECT NO. 2 (FOUICRLY HANFORD NO. 2)

Effective inmediately, DRL responsibility for licensing safety review of the WPPSS liuclear Project No. 2 has baen transferred as follows:

From LWR 1-2 To LWR 1-3 Branch Chief Walter Butlor Olan Parr (x-7931)

Licensing Project Manager John Orndoff Ignacio V111alva (x-7243)

Licensing Assistant Madelyn Rushbrook Valeria Wilson (x-7896)

By copy of this memo, DTR, IE, OMIPC, OELD, Ragulatory Files, Public Affairs, and the Docketing and Service Section ere being notified of the changes.

Oridnr.1 signr.l tw It. C. DeYoiin#

R. C. DeYoung, Assistant Director for Light Water Reactors Group 1 Division of Beactor Licensing RL(LJi 14 RL: LWR 1-3 AD:L p

  • l

'P 'I ' DParr 4 VilW14 M..ilnk0 1 RC ung e....

(p/$l/75 7 / t/7s

_f7/w/75 Ivem AEC-)IS (Rev. 9-))) AICM 0240 1*r u. e. eovan=ess=v ene= vine orrisse se,s.eae.ies 8605220517 7S0702 PDR ADOCK OD000397 A

PDR