Requests Review of Encl Util Partial Response to Outstanding NRC Questions Re Sacrificial Shield Wall Base Design
ML20214G775
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/16/1975
From: Parr O
Office of Nuclear Reactor Regulation
To: Heineman R
Office of Nuclear Reactor Regulation
References
CON-WNP-0031, CON-WNP-31 NUDOCS 8605220490
Download: ML20214G775 (2)


Text

.

9 e

h 0 0 Re h Fi e, JUL 1 6 1975 Docket No. 50-397 Robert E. Heinemn, Director, Division of Technical Review, NRR CONTINUATION OF TAR 908 (EVALUATION OF THE WPPSS-2 SACRIFICIAL SHIELD DESIGN)

Your continued technical assistance per existing TAR-908 is requested as follows:

PLANT HAME:

WPPSS Nucleat Project No. 2 (Formerly Hanford 2)

DOCKET NU N ER:

50-397 RESPONSIBLE BRANCH:

LWl3 CONTACT:

1. Villaiva (Ext. 7896)

TECHNICAL REVIEW BPANCHES:

ContainmentSystemsBranch(prime responsibility) with support, as needed, from Structural Engineering and Mechanical Engineering Branches.

TARGET DATE FOR COMPLETION:

August 7, 1975, as discussed on July 9,1975 by Messrs. Lainas and Cudlin of CSB and I. Villaiva of LW13.

DESCRIPTION OF REQUEST:

Review the enclosed applicant's partial response to outstanding NRC questions relative to the sacrificial shield wall's base design. (Note: We expect the appTTeant to provide analyses of the sacrificial shield wall above the base on or about August 15, 1975).

t 8603220490 750716 PDR ADOCK 05000397 A

PDR

4 0

?.

Robert E. Heineman 2-JUL 1 0 1975 BACKGROUND:

On' March 21, 1974, the applicant submitted a report entitled " Sacrificial Shield Wall" in response to comitments made in the PSAR and to a post CP item in the SER. On April ll, 1974, we requested technical assistance (TAR-908) from E B, SEB and CSB in evaluating this report. As a consequence, we transmitted questions from SEB and CSB to the applicant on July 8, 1974. The applicant responded to these questions on February ll,1975 in a report entitled " Sacrificial Shield Wall Design Supplemental Infomation". CSB reviewed this supplemental information and identified deficiencies in the analysis and provided guidance with respect to an acceptable method for computing pressure response within the shield annulus upon a recirculation pipe break. This infomation was transmitted to the applicant as a request for additional information on Mcy 15,1975. The applicant has submitted a partial response to this request for information (i.e., that portion which the applicant claims is the bounding condition for designing the base structure). It is this partial response to our request for additional infonnation for which we request continued technical assistance. We need an evaluation of the information in order to determine whether the Post CP " Hold", regarding the top of its reactor pedestal, shculd be released.

Orhinal Signed by Obn P.irr Olan D. Parr, Chief Light Water Reactors Project Branch 1-3 l

Division of Reactor Licensing I

cc:

W. Mcdonald R. S. Boyd R. W. r(lecker Olan D. Parr I. V111alva R. Tedesco R. Maccary R. C. DeYoung T. Abell 1

J. Panzarella G. Lainas L. Shao J. Knight RL:LWRl-g RL:LWRg-3_

o,,,c.

IVillal a':mk ODharr e....

7//& 75 7//g/75 Foran AEC 31s (Rev. 9-$3) AECM 0240 W u. e. sovannaasni paintino orricas ser4.sas.see l

-