ML20214G744

From kanterella
Jump to navigation Jump to search
Requests Appropriate Action Be Taken to Obtain CP Fee for Facility.Cp Will Be Issued During Mar 1973
ML20214G744
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/18/1973
From: Gearin H
US ATOMIC ENERGY COMMISSION (AEC)
To: Miller W
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0080, CON-WNP-80 NUDOCS 8605220469
Download: ML20214G744 (1)


Text

-

I i

I l

Distribution:

Docket File i

i GCR Reading H. Gearin (2) l Decket No. 50-397 JAN 1 6 T3 I

l Willian 8. R111er. Besiness Manegament treach l

Office of Adriefstration - Regulaties C4RSTRUCTION PERMIT FEE please take the appropriate action regelred to obtain a construction permit fee for the Washington Pubile Power $mpply System's Haeford No. 2 Nuclear Power plant. It is anticipated that a construction permit will be issued during March,1973.

The following information is provided for your use:

1.

Applicant:

Washington Public Power Sepply system ATTN: Mr. J. J. Stein Managing Director 301 Fifth Avenue P. O. Box 968 Richland. Washington g9352 2.

Facility:

Hanford No. 2 Muclear Power Plant 3.

Docket No.:

50-397 4

Construction Permit No.:

CypR-93 l

5.

Contact:

Mr. Duane Reeberger Washington Public Pomar Supply Systen l

Telephone No. 509/946-9681 l

l 6.

Power Level:

3323 megawatts thermal i

This applicaties ins met part of a concurrent review. Please wetify

{

se when the appropriate fee has been paid.

i N/ & bi n Malen 8eerin. Liceesing Assistent j

for ens cooled haectors tranch i

tirectorate of Licensing I

cc:

R. A. Clark

5. Miner omcr > LIGCR st. mar,

h

.n:nb.

,_ uc.,i. [a/

~

TR,.2,t=l=2.,,,n...at,

~~

~

ou.

B605220469 73Ojts DR ADOCK 05000397 PDR

..