ML20214G737
| ML20214G737 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/05/1973 |
| From: | Miller W US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Wagner J US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| CON-WNP-0078, CON-WNP-78 NUDOCS 8605220459 | |
| Download: ML20214G737 (1) | |
Text
_-
i i
&*b$)
February 5. 1973 l
James F. Wegmar Chief General Ascounts Branch, OC l
COINTaBCTim FKatIT FF.E F91 TEL ELETORD 2 POWER FIANT l
The Directorate of Licameing less anotified as that a constructism Foruit fee is scheduled to be issued during March 1973 for the subject facility, i
i Flease issue sa invoice as follows:
I l
Washington Public Fower Copply System Fower I.evel: 3323 Mw(t)
)
ATDI: Mr. J. J. S tein Managing Director Fee Due: $300,000 j
301 Fifth Avenue P.O. Box %8 j
i Richland. Washington 99352 pee is based on the maximum power level of 3000 Mw(t) @ $60,300 plus
$80/Mw (t').
l l
I Original Sigant by W m. O..T!'Uce I
William O. Miller l
Business Managtment Branch Of fice of Administration -
l Regulatien cc: Helen Gearin, L I
I t
I i
i
_,f,
-f DRA:BMB DRA:EMB omcs >
.A M 'sc WOMiller[
...j... @ -
sunuur >
2/5/73 2/7 /73 04rt >
Forse AIC-Sle iRev. 9-$3; AICM 0240 e o s c.ove awe st ea %r4% o m e 1972 466 983 86052204S9 730?O5 PDa ADOCK 00000397 PDR 4
_ _j