Requests Technical Assistance in Evaluation of Adequacy of Util safety-related P&Ids Required Per SER Paragraph 4.2
ML20214G736
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/21/1974
From: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
To: Hendrie J
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0077, CON-WNP-77 NUDOCS 8605220457
Download: ML20214G736 (5)


Text

,

s 1

FEB 21 1974 LWR l-2:74-4 Docket No. 50-397 N-

.C Joseph M. Hendrie, Deputy Director for Technical Review, L TECHNICAL ASSISTANCE REQUEST PLANT:

WPPSS Nuclear Project No. 2 (formerly Hanford -2)

STATUS:

Post-CP Review BRANCH:

LWR 1-2 PROJECT MANAGER:

John Orndoff TR BRANCUES INVOLVED: Reactor Systems Branch WPPSS has submitted its safety related piping and instrumentation diagrams for WPPSS Nuclear Project, Number 2, as required by the SER.

The SER requirement, Paragraph 4.2 on Page 44, states:

"...the applicant will be required to provide piping and instrumentation diagrams identifying the boundary limits of each classification group during the construction stage, and preferably prior to procurement of components."

A determination by the staff of the adequacy of WPPSS's submission is required. Other relevant information is contai.ted in the enclosed Program Control Information sheet.

R.C. DeYoung, Assistant Director for Light Water Reactors Group 1 Directorate of Licensing

Enclosure:

Yrogram control Information Sheet Distribution:

i Docket File RWKlecker T. Novak J. Orndoff D. Eisenhut LWR 1-2 File VStello R. Kirkwood SVarga M. Maigret K.s unald l

....cR GD eYoung

. LWR 1-2.,W-LWR 1-2

.AD/ LWR-1 NM ! '

J0rndoffivvy WRButler.

_RCDeYoung l

2/21/74 2/./74

. 2/. /74 ihn. a rca n m,.. m. 4ecs o..a

..c..

i.............

8605220457 740221 PDR ADOCK 05000397 PDR E

f

\\

O i'

TECHN! CAL ASSIST /J:CZ REGUZST/TO?ICAL REPORT RZVIEh' PROGRAM CONTROL INFORMATION DATE 2-20-74 TECHNICAL ASSISTANC2 REQUEST - DESCRIPTION - INCLUDING THOSE TAR'S MiICE AR2 ESTA2LISHED FOR TOPICAL REPORTS WPPSS post CP submission of piping, and instrumentation dianrams in response to a recuirement in the SER.

R2QUIRZD COX?LETION DATC 6-20-74 DEPARTM2NT OR BRANCil ASSIGNED TO ?ERFORM TECHNICAL REVIEh' Reactor Systems Branch DATE 0? ASSIGNKENT 2-20-74 CURRENT PROMISE DATE FOR COMPLETION 6-20-74 REACTOR LICENSING PROJECT DOCRET NUX3ER 50-397 FACILITY NAM; WPPSS Nuclear Project No. 2 7:CHNICAL REVID: 1.%'57 3E COMPLETED PRICR TO MILZSTONZ N'J:GZR TYPE Or LICZNSING ACTION (CP OR OL)

Post CP CO>'MENTS The applicant is required to provide piping and instrumentatico dianrams identifying the boundary of each classification group durine the construction stage, and preferably prior to procurement of connonents.

RANC5 C.CZ7 - 22QUESy!NG DZ?ARTXZ
;T Walter R. Butler, LWR 1-2

?ROJ2CT LEADZR - R$QU2 STING DZ?ARTMENT John Orndoff, LWR 1-2

Mr. A. Giarbusso page 2 April 17, 1973 This rneans that the rad aste collection system consisting of the radioactive equipment and floor drain piping, the radioactiv? equipment and floor drain sumps, the su p purps associated with these surps, and the sump pura distnarge piping would be classified as Code Group D.

A portion of this piping, narely that crbedded in the concrete near the bottom of the reactor Jilding is scheduled to be covered by concrete in about two weeks.

In tne absence of any directi C-CCL we plan on proceeding with design and construction of the rat ection system to reet the requirerents of Code Group D.

2) Extent of Gaseous Rad:aste System PSAR Figure C.5-3 erroneously indicates the Stean Jet Air Ejectors are Code Grcu-C.

" dun-. to U:

Oc'o n er M Air E9ttcrs Yf$lbhh2I

.h?

E' The effgas systcm starts at the diccharg2 of the last stage air ejector as shc.:n in PSla Fic,ures 9.3-1 and C.5 l.

This is the firs:

point in the systen wnere there is a positive pretsure.

/J 1 p re ce::2-ing points in the systen operate under vacuum conditions with no resultant leakage to the environment.

3) Overall Classificttion of Radc:aste Systen Safety Guide f o. 26 indicates in item C.2-d that corponents in the radt aste systen whose failure would not result in calcalated expos-ures in excess of 0.17 rem whole body at the site boundary ray be classified as Grcup D.

On thr.t basis, and based on our tvaluations presented in the response to FSAR text section 9.4.6.1.11, answer to PSAR question 9.25, and the GE report f:ED0-10734, "A Gener al Justifica-tion for Classif

  • cation of Ef fluent Treatrent System Equiprent as Group D", February 1973, it appears that the entire liquid and gaseo;5 radwaste syster,s should be revised to Code Grcup D ( AEC Quality Group D).

_Does the AEC-Directorate of Licensing acree that a revisien to Grcun D for the entire liauid and casecus racwaste systens is acceptacie?

k

/

Mr. A. Giarbusso page 3 April 17, 1973 We have discussed this matter by telephone with S. Miner and R. Kirkwood of your staff.

Ycur initial concurrence in the direction we are preceedir.a on item 1 would be appreciated by phone as soon as possible, follovied by e letter. We would appreciate a response to items two and three by May 15, if possible.

Very truly yours,

,hau-y'<,0 L. L. HU': Hr YS Deputy ::anagir; Eir:ct:"

LLH:DLR:CLF:rda

,9 k

- t:f,s s v.

.' ~..,h','.

s

,. i. s

~ f

.q

. % -li/ a s ? l,:..,

,d

' ' ' ~

~'

. 'i : -

\\..

a..,, M air

~ * - -

s,.

t.,3

?,..

~.:

c, ;...

,C)

STATE OF WASHIf;GT0:1

)

)

COUtiTY OF BENT 0:1

)

4

.,~~ -

On this day personally appeared before me L. L. HUl9HREYS to me known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that he signed the sace as his free and voluntary act and deed, for the uses and purposes therein mentioned.

Given under ry hand und official seal this 17th day of /.pril,1973.

,r'

,/

Cf

~ ?.d,

[flotary Public i.. f c the State of !!ashir gtcr.,

County of Benton

/

.-