I 1
, Docket Fi e sw DEC1g j
l L. R Bogers, Director, Bivision of hAiological and havironmental Protection TEWIICAL ASSI5fABCE EB3BMT 30. WR k-2, WAMIEGTW NBLIC PWER SUFFLY SYSTW, MAEFOS 30. 2 EBCIEAR 70WER FLANT, 30 SET NO. 50-397 The Washington Public Power supply system submitted an application for a construction permit. The application dated August 10, 1971 was received on August 19,1971. The review plan has been prepared and is attached.
TWchnical review and evaluation is requested from the Division of Radiological and Environr. ental Protection in the area delineated in Item 23 of the revie4 plan. The proposed major milestones for j
the environeontal review and a proposed review sehedule is inelated in the n yiew plan. If your schedule can not be made consistent l
with our proposed safety review schedule, please let me know as soon as possible. As you know, we will be looking for ways to i
l shorten this schedule substantially,in the near futun. My in-l structions to ML personnel on this matter are outlined in the i
cover memo of the attached review plan.
i ORIGINAL SIGNED BY Peter A. Morris l
Ester A. Morris, Director l
Mvision of Remeter 1.ieensing DISTRIBUTION :
Docket File l
DR Reading l
DRL Reading IMR-4 File F. Schroeder DRL Asst. Dir G. Blanc, REP S Miner, DRL l
SEE FREVIOUS CONCURRENCE Mp22 ggt;ggggg, l
A
I f
N'vf
~~.N L.'R., Rogers, Director, Division of Badiological and Environmental
.'- Protection TEO.NICAL ASSISTAllCE RE3 JEST NO. BIR 4-2, VMmTmT05 PUBLIC POWER SUPPLY SYSTDd.,' BAIEFORD NO. 2 RPCIZAR POWEft PIANT, DOCKET NO. 50-397 Tne Washington Pub'lic Power Supply System submitted an application for a construction permit. The application dated August 10, 1971 was received on August 19, 1971. The review plan has been prepared and is attached.
N Technical review and evaluation is requested from the Division of s
Radiological and Envirorunental Protection in the area delineated in Item 23 of the review plan. Tne as,)or milestones for the en-vironmental review and the overall review schedule is included in the review plan. Please prepare and submit an environmental review schedule which is constant with these.
's
's Peter A. Morris, Director Division of Beactor Licensing x
\\
DISTRIEUTION:
s Docket File DR Reading x
DRL Reading B'a'R-4 File F. Schroeder DRL Asst. Directors G. Blanc, REP S. Miner, DRL
.. l... g......
DRL:WF !.
E.o DRL:DLr B.'R * : 9L omer >
SMiner:pf VSTello RS >
P/#.brris g
.. A.
sunaut >
...............l11// i/71...............11/ p.../ 1............
11/.7/71 7
..........g....11D 71 oan >
Form AFC-lis t Res. 9-33) AECM 0240 t s. a n n e nwa nt PsicNighu er rec t ; into o. e's->e.
.