Forwards Hydrologic Engineering Section Questions for Transmittal to Applicant.Requested Analysis of Potential Upstream Dam Failures Consistent w/710716 Regulatory Ltr
ML20214G680
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/03/1971
From: Case E
US ATOMIC ENERGY COMMISSION (AEC)
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0145, CON-WNP-145 NUDOCS 8605220396
Download: ML20214G680 (3)


Text

_

e

. mm.: -

,g

}.

- q),

~;

i s

7_,

DEC 3 1971 g:

~wq

,, ~ug; a

~

r%j,w.

4 se o en e o ev:

a%.c 3 a 03ea o e e % *,M!b 1

n sWN m e w o e e to os c4 e e e&O;teum Nuce IDD 14 e o e e ec c o es nut $t Artete:

MMWh i

EpAsawgMaW ~

  1. f0

,,9

&@%w: m

~

.w.e. o e e e s a m da no u n e s.

. ; e-M Vis see m m.< steep a o o e c a> h -

E?W We w e s o tD e s w w s o v0 G wW. 6He.agab&

k wag 4e W, an w seehpessnessa 6 en h 6 peer trementaset es she appusens. en amanyese of speareen d e saansres se esmessenes each she'

% SWE, Better se

- - seshoes. numer. ashnese ens ansees essaeans ramos artneria." Us anoe asse that we home eessteneses ser essesses steh me ap pisees t se e s e mees w tani us e r, e n s a se se asese s a et available inadams by Sept for a esopesee&we study of en espebility of i

l meetweem dans as withmesed essehgmebers by ABB utch to Basene of "--* -

^

ehe eneass ent suever and the earpe of Ihesamese.

s i

orienst siend ei t.ecm Edson G. Gee,38seeeer savsesem et anseeer seamansde pse assaseures apesenesse ansia.ortes geesesse.

5 m w/emais a. c. a voues, naL

u. ammeen, sat
v. see ne, amt u.a.a-

., w.ra. S. Iddaar, M

~ p$*. 45 d "g.. pg sw:.~, ~. w ww. v.

' e') OfS G4Rh Y

NOWGtDOtQwa: P aam u o m s m o rea:aw 1,: e x&

a.

m% 4uyys p 7y g e 4 g,

y7

4. ;q y *
  • Agfg h ? W M D G e G & V:Qhh & M

?lbl$ Mi e 3.:eX e SY W EC f hp 4 % b %fHR

~

&:'M *\\

l$p "tt PF M G r4.y M S ' s lIR MM

+W,.

,[$? 23Q, ]p g) g,i

$yggrgyc:~/ElCT01"[ff$@33Qgrfin MW j'-%'O '"Fl.rf WGEii 4 ;/-g

~ " ? 7;>tu O C (S Q M g +

h4 W

~

.,4

.t.

7 m;

,x p...qw.7:4yeun g ?g

. pg,k.n

.im m.

3 s

3

,,, g, n.

3, s'

. m p;,

l sSF5 BBS WB

- Mss-gg 7

i emes.

~

glge summum >

12/2/71 12/II[71 12/L/71 83/Y/Il t

BATY >

l Foeus ABC-lle (Rev.9-53) ABCM 0240 e u a aovtsemerwt renseres. orries asio.aor res 860522O396 711203 PDR ADOCK 05000397 A

PDR

e

)

4

[-

HYDROLOGIC ENGINEERING QUESTIONS HANFORD NO. 2 NUCLEAR POWER PLANT PSAR DOCKET NO. 50-397 1.

Provide the bases for the estimate of the unregulated probable maximum flood (PMF) at the site. If this estimate was supplied by What is the Corps of Engineers, note the appropriate references.

the estimated peak flow rate and corresponding water level at the intake structure for the reservoir-controlled PMF, and its basis?

Provide the estimated controlled PMF hydrograph at the site and the referenced (page 2.4-4) Corps of Engineer Water Surface Profiles RM 323 to RM 395. In addition, provide appropriate docu-mentation (for example, from the Corps of Engineers) that the fed-erally authorized Ben Franklin Dam will have only a negligible effect 4

on extreme flood levels.

2.

It is our understanding that you have undertaken an extensive review of the flood potential from upstream dam failures for a nearby site.

Conclusions and documentation from that study appropriate to the Hanford No. 2 site are required to assure that the information sum-marized in the PSAR provides a suf ficiently censervative design basis. In addition, provide the following supplemental data to j

Table 2.4-1 and Figure 2.4-2, and an appropriate discussion, to sup-port your conclusions that the failure of the dam you have considered l

is the most severe case:

Show the location of all major upstream dams in the Columbia a.

River Basin and tabulate their approxinate river mile; b.

Indicate the type of structure in classes such as (1) earth or rockfill, (2) concrete gravity, (3) concrete arch, and (4) composite concrete-fill; Tabulate the maximum height above streambed and the maximum i

c.

usabic storage available in each structure.

3.

Since the intake structure will house safety-related equipment, it i

must be capable of passing both a PMF and, separately, any flood which could be caused by an upstream dam failure. In addition, assurance should be provided that suf ficient suction will exist on safety-related pumps for the lowest river flow considered reasonably possibic. Provide a cross section through the proposed structure which shows pertinent elevations of the sump, operating floors and l

l 1

e

)

z.

, all exterior accesses. Discuss the capability of safety-related pumps to operate throughout the range of expected exterior water Icvels.

- 4.

Figure 2.4-5 is noted (para. 2.4.1.1.5) as showing ' the location of Hanford Reservation wells as of about January 1969. Which, if any, of these wells (or others) within four miles of the site are used as a source of potable water supply? Provide estimates of the horizontal and vertical in situ permeabilities of foundation material down to and including the upper portion of the aquifer under the site.

f 1

1 4

4 g

5 k

i i

!