ML20214G665
| ML20214G665 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/11/1974 |
| From: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Hendrie J US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| CON-WNP-0073, CON-WNP-73 NUDOCS 8605220377 | |
| Download: ML20214G665 (2) | |
Text
......
i APfi 1 1 1974 LWR 1-2:74-8 Docket No. 50-397 ?
g Joseph Hendrie, Deputy Director for Technical Review, L TECiNICAL ASSISTANCE REQUEST PIANT:
WPPSS Nuclear Project No. 2 (formerly Eanford-2)
STA'[US :
Post-CP Review BRANCE:
LUR l-2 PROJECT MANAGER: John Orndoff TR ERANCHES INVOLVED: Mechanical Engineering, Structural Engineering, Containment Systems DATE REQUIRED:
May 15, 1974 REF:
Letter from J. J. Stein, Washington Public Power Supply System, to A. Giatiusso dated March 21, 1974, with attached technical report (WPPSS 74-2-R2), Sacrificial Shield Wall.
Description of Request: Technical Assistance is requested to evaluate the submittal by WPPSS on the sacrificial shield design. This is a post-CP item identified in the SER. The pertinent section of the SER is reproduced below for reference.
10.3.5 Sacrificial Shield In Amendment 2 the applicant stated the sacrificial shield structure and all its components will be designed to sustain the maxiones difforential pressure buildup in the annulus. The differential pressure, however, was not calculated.
In Amendment 12 the applicant has agreed to submit information on the maxiunam differential buildup as well as the design details for our review prior to shield construction. The appliesnt has also stated that the design of the sacrificial shield plugs around pipe penetrations will prevent the plugs from becoming potential missiles for prinary ruptures-within the pressure vessel annuius, we v111 rollos tais item c. iring plant construction.
omcE >
..Va. find. that..tha..mbove..consnitments..are..acce, tabla.far eho purpnse..
oftf..econstruction permit review.
SURNAME >
bI DATE>
,... m.,i. s_. s u,0i om
.....,-,.-.,...m.
8605220377 740411 PDR ADOCK 05000397 E
Joseph M. Hendrie /,PR 11 $/4 A determination by the staff of the adequacy of WPPSS's sacrificial shield structural design is required.
R. C. DeYoung, Assistant Director for Light Water Reactors, Group 1 Directorate of Licensing cc:
W. Mcdonald R. W. Klecker E. R. Maccary J. P. I' night L. C. Shao
?.. L. Tedesco C. C. Lainar J. Orndoff S. Varga D. Eison' tut DISTRIBUTION:
Docket File LWR l-2 File R. C. DeYoung W. R. Butler
'L: LWR 1-2 L: LWR 1-2 L:AD/ LWR 1 omer>
g',
,,ff
~
summaut > JQrndoff:ea.....WRButler(/4..
aYAung..
4/10,[?,$j..,l 4,[.l6./,?,@
.,4/// /74 carr,
Form AEC-518 (Rev. 9-53) AECM 02E0
- T*s-le-aiens-a 44H,
-.