Requests Listed Info to Complete Review of Conduct of Operations Section of PSAR
ML20214G656
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/06/1972
From: Guinn W
US ATOMIC ENERGY COMMISSION (AEC)
To: Miner S
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0140, CON-WNP-140 NUDOCS 8605220368
Download: ML20214G656 (2)


Text

4 l

k JM E 1972 S. Miner.

  1. 4, Division of Reactor Licensing THRU:

ley Thompson, Chief, Operational Safety Branch, DEL INITIAL QUESTIONS RECARDINC HANFORD NO. 2, WASHINCIW PUBLIC POWEF SUPPLY SYSTE" - DOCKET No. 50-397 We are in the process of reviewing the " Conduct of Operations" section of the PSAR for Hanford No. 2.

In order to complete our review, the following information is requested:

1.

An expanded discusrion of corporate functions, responsibilities and authoritics with respect to nuclear plant design, construction, l

resting and other activities as applicable.

2.

Delineation of working interrelationships and organizational interfaces between the applicant, NSSS vendor, AE and other suppliers and contractors.

6 I

A five man shif t is acceptable if one of the five shif t personnel e

3.

{

has been trained as a health physics technician. Does WFPSS plan on having one operator p2r shift meet the qualifications of a j

health physics technician?

4.

Figure 13.2-2 Discuss why the plant instrument technicians report to the a.

electrical foreman and not the instrument and control engineer, b.

Discuss why the technicians (lab & monitor) report to the technical supervisor and not the radiation protection and radiochemistry engineer.

5.

Discuss why observation training at an operating reactor cones after Basic Nuclear Course and not after BWR Technology and Simulator training.

6.

Description of practical (on-the-job) reactor plant operation to he included as a part of the nuclear training program for reactor operator and senior reactor operator candidates.

7.

Description of any previous nuclear training allowable to reactor operator and senior reactor operator candidates such as U.S. Navy Uuclear Power Training Program or other experience that may establish eligibility for reactor operator or senior reactor operator licenae examination.

- > =,

Sunesanot >

,_. oc.... '" *,-,u a oso w.. m _. _,,;7 ;;.;,;-

8605220368 720106 PDR ADOCK 05000397 A

PDR

t

.k E F372 S. Minor 8.

Description of training programs to be provided for personnel not requiring licenses (managers, supervisors, professionals, operators, each=icians and repairmes).

9.

Posities title of individual reopeneible for eenduct and m eerstiam of the m imer power plant training program.

10.

Esserike the features of the facility to be provided for onsite emergsesy first aid sad d - -4==** =.

11. She at the eerparate lesel will have the responsibility of formulating the fadmotrial soeurity program for Esaford #27
12. A description of peroommel==1=etiam policies, employee performance and evaluation procedures, and the ladustrial security training program to insure that reliable and emotionally stable personnel are selected, maintained, and assigned to the plant staff.
13. Enference 13.2.1.4 Persommel qualifications - Does WPPS mean ANSI - N18.17 M.LGrian Operational Safety Branch Division of Beactor Licensing ec:

D. J. Skovholt, DEL V. Stello, DRL Rh-- -

- E3 CRESS 1h: 1/6/]

g

~

D icapson (MG#219271,219217 1/6 /72 1/6/72 is;

~~ ~

oan,

roe = AEC-HS (Ret 9-HT E O

  • u s me se aae 1-sa

f I

l

. acket File I

DEC 21 1971 i

+

3 i

s. mu,

_ua.,roo.dar.s

, ofme of.

Omat m ilar j

- mue >== =m.1 :== -=== m. 2, mam m. mm l

I as fbrwading the " General Infbreaties" portion oi* an application filed by Washington Public pisuer Supply System fbr anthorisation to Construct and operate a nuclear mestor at the.E hafbd reservat ton site, located in Benton Comaty, Washington. The proposed reactor is of the boiling water type and is designed for initial operation at 3323 thermal engawatte. Also enclosed is a supplemental construction l

cost breakdown furnished by the applienat.

I This project is scheduled for safety evaluation in September,1972.

Please advise us prior to that time what additional information you will need to cesplete your review to deteratine whether the applicant is financially qualified.

l I

i 06 inal signed by 2

i Vieter Stello, Jr., Chief Boiling Water Beactor Branch No. 4 Division of Beactor Lioensing Baclosure:

l.

License Application, Part A 2.

WFPS ltr. dtd. September 27, 1971 DISTRIBUTION:

Docket File DRL Reading NR-4 File SMiner MHGearin OGC Files i

DRL:W R DRL.:

R-4 Jg)

Omuk su= =,

m ea.rin3pf... s..

12/ /Tl 12g/71 un, Foren AEC-Ste (Rev. 9-53) AECM 0240

  • v s oovement enewtada once sewan iss

'