t Doc (et ~ie FEB 2 4 E72 i
Bocket No. 50-397 l
Reger 8.~ Boyd, Assistaat Mrester, DIR, Divielen of Roseter Licensing TWU:
Victar Stalle, Chief. 3E-4, Divistem of haaster Licensing i
l l
IERTIE WITE ELSEIMBION PWE.IC 70M SEFFLY SYSTEIf (WFSS) CON E4WORB ND. 2 EUCLEAR 70ER FLANT 30 CERT E0. 50-397 h
i l
Ga December 15 and 16 1971, moottage were held with the Meehingtoa Fublic Feuer Supply System at Esseewick, Washington.
The asia purpose of the meetings uma to discuss site geology, hydrelegy and the appli-
}
cable FFTF published information.
to the PS&R review unre diosassed. In addition, a few other topics related The Esaford No. I plant site, the.
FFTF plant site and a geological treash en Gable Mountain were visited.
l The ath-at the meetings is attaehed.
Discussion 1.0 h The questions prepared as geology for omheitest to WFSS is the initial questien list were discussed. From the diosuosien it uns apparent that i
some of the required inferenties samid be obtained from FFTF studies.
It was pointed est that utnere appliosble taferenties from FFFF studies l
l l
esuld be used to assuer the guestaans provided, the inferention is available in published desessate filed in the publie document roms.
If this information is used, a satisfactory response would be a refer-ence to the document with a short summary of the applicable Laformation.
An area of concern use the structwe of the embourface soils benesch t.he f site and it use indicated that emme trenehing any be required to establish the strustwo.
l The informatism that seald be obtained by trenching use discussed but as oesumitment to de the work uns unde.
WPSS will unit until they have the 4meetion List before making a decimies.
l The spolicaat indisated that within the most 4 4 weeks additions 1 borings will be made in the reestar building and emeling pond areas.
I
.I 8605220346 720224 PDR ADOCK 05000397 A
PDR l
f Roger S. Boyd
- FEB 2 4 tr2 i
(f) Containssent The problem of steam bypass through the vacuss breakers was discussed. The applicant had no position so this at the present time.
F i
Original signed by!
i Sydney Miner, Freject Leader l
Boiling Water Reacter Branch M Division of Beacter Licensing l
Enclosere:
Attendance List l
DISTRIB1TrION:
Docket File DRL Reading BWR-4 File S. H. Hanauer R. S. Boyd R. C. DeYoung BWR Branch Chiefs E. G. Case CO i
Sydney Miner Helen Gearin
)
i i
i I
l l
t i
omer > _DRL:BWR-4.....DRL;1WR. _4 S
h sunnAwe > _SMiner.:vv...
..VSI211.0 l'
l oArr >. 2/ 2p/ 72..
2/2W72 l
ro,. AEC-He tRev. 9-53) AECM 0240 e u s aostawe %e *=wra.a oerica n.w ci rse 1
4 l
ATTEEDANCE LIST Ek
- s. miner (1) (2) (3)
BA L. c. uniman (1) (2) i
- m. a. ucumllen (1) i WPPSS D. L. Reneberger (1) (2) (3) f R. A. Coombe (consultant) (1) l L. L. Bumphreys (1) (2) (3)
R. Chitwood (2)
O. Trapp (3)
J. E. W olsey (1) i I
sat i
M. J. koncich (1) (2)
W. Ritsch (2) (3)
.9.a_E.t
- s. Stowe (3)
I i
.llsfd F. N. Houser (1)
M. N. Woldron (1) l L. E Gard (1) l (1) Geology meeting (2) Rrdraulic Engineering meeting (3) Other Topics meeting i
i OFFICE >
i
$URNAhlt >
DATE >
Fort. AEC-518 (Rev. 9-53) AECM 0240 e u a sovr=wr%v pawtwo orect i.vo-e 7s.
.