ML20214G581

From kanterella
Jump to navigation Jump to search
Revised Emergency Plan Implementing Procedures,Including Rev 5 to EP-106, Written Summary Notification & Rev 7 to EP-110, Personnel Assembly & Accountability. Related Correspondence
ML20214G581
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/18/1986
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
CON-#486-1626 OL, PROC-861118, NUDOCS 8611260140
Download: ML20214G581 (122)


Text

-

Page 1 ef l **"i'i "

- 3 E *D~ i 7 6 80 10/28/86 LIMERICE GENER.\ TING STATION

, EMERGENCY PLAN PROCEDURE INDEX

==============================================================

DATE OF LAST PROCEDURE REV. DATE SIGNED PERIODIC NUMBER NO. TITLE BY SUPER. REVIEW

-.============================================================

EP-101 4 Classification of Emergencies 03/25/6E 20/23/86 _

EP-102 11 Unusual Event Response 07/28/86 07/28/86 l EP-102 1 Unusual Event Notification Forms 10/27/86 07/28/86 (Appendix 1)

EP-103 14 Aler't Response 07/28/86 07/28/86 l EP-103 1 Alert Notification Forms 10/27/86 07/28/86 (Appendix 1)

EP-104 13 Site Emergency Response 07/28/86 01/28/86 l EP-104 1 Site Emergency Notification Forms 10/27/86 07/28/86 (Appendix 1)

PP-105 13 General Emergency Response 07/28/86 07/28/86

'-105 1 General Emergency Notification 10/27/86 07/28/86 ppendix 1) Forms EP-106 5 Written Summary Notification 10/27/86 10/23/86 EP-110 7 Personnel Assembly and 10/27/86 10/23/86 Accountability l EP-120 4 Site Emergency Coordinator 10/27/86 10/23/86 EP-201 5 Technical Support Center (TSC) 02/10/86 10/23/86 Activation EP-202 5 Operations Support Center (OSC) 04/01/86 04/01/86 Activation EP-203 6 Emergency Operations Facility 05/27/86( 04/01/85 (EOF) Activation , '\ \, \ 4s EP-208 6 Security Team -S M \09 2 8' 09/23/86 g' s , N . , ;; '

EP-210 i 05/12/86 10/26/84 5 Dose Assessment Team ,

EP-212 2 Field Survey Group \' 1~  % . 03/25'/85 10/23/86

\ .1 ' b',;)

.' d.ei'\ D EP-220 CANCELLED . > '

.q a -

EP-221 CANCELLED .t

..i '

s' V

,-" 9-222 CANCELLED *1e.i\\

. \"

(  !-230 5 Chemistry Sampling and Analysis 03/14/85 10/23/86

> _T_eam 8611260140 861118 2

.- p DR ADOCK 0570 7 l

e Page 2 of 4 l Revision 65 10/28/86 p

I i

't./ LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX

==============================================================

DATE OF LAST PROCEDURE REV. . DATE SIGNED PERIODIC NUMBER NO. TITLE BY SUPER. REVIEW

==============================================================

EP-231 12 Operation of Post-Accident 06/24/86 10/23/86 Sampling Systems (PASS)

EP-232 CANCELLED EP-233 7 Retrieving and Changing Sample 04/01/86 10/23/86 Filters and Cartridges from the Containment Leak Detector during Emergencies EP-234. 7 Obtaining Containment Gas Samples 04/01/86 10/23/86 from the Containment Leak Detector during Emergencies EP-235 6 Obtaining Reactor Water Samples 04/01/86 10/23/86 from Sample Sinks following Accident Conditions ,

EP-236 5 Obtaining Cooling Tower Blowdown 03/14/85 10/23/86 i Line Water Samples following

[_sT Radioactive Licuid Release after

\m / Accident Condit' ions EP-237 8 Obtaining the Iodine / Particulate 04/01/86 10/23/86 and/or Gas Samples from the North Vent Wide Range Gas Monitor (WRGM) -

EP-238 5 Obtaining Liquid Radwaste Samples 04/01/86 10/23/86 from Radwaste Sample Sink following Accident Conditions >

EP-240 CANCELLED EP-241 10 Sample Preparation and Handling 06/24/86 10/23/86 of Highly Radioactive Liquid Samples EP-242 5 Sample Preparation and Handling 03/28/85 10/23/86 of Highly Radioactive Particulate Filters and Iodine Cartridges EP-243 7 Sample Preparation and Handling 06/24/86 10/23/86 of Highly Radioactive Gas Samples EP-244 3 Offsite Analysis of High Activity 03/12/85 10/23/86 Samples EP-250 2 Personnel Safety Team 12/12/84 10/26/84 EP-251 3 Plant Survey Group 04/01/86 04/01/86

,MP-252 8 Search and Rescue /First Aid Group 09/02/86 07/31/86 0 Personnel Dosimetry, Bioassay, 12/12/84 12/12/84

(//-253 N- and Respiratory Protection Group

=

Page 3 of 4 l Revision 65 10/28/86 7

LIMERICK GENERATING STATION EMERGENCY PLAS PROCEDURE INDEX

==============================================================

DATE OF LAST PROCEDURE REV. DATE SIGNED PERIODIC NUMBER NO. TITLE BY SUPER. REVIEW

==================================================================mu

EP-254 3 Vehicle and Evacuee Control Group 02/04/85 10/23/86 EP-255 2 Vehicle Decontamination 12/12/84 10/23/86 EP-260 2 Fire and Damage Control Team 12/12/84 10/23/86 EP-261 2 Damage Repair Group 12/12/84 10/23/86 EP-272 CANCELLED ,

EP-273 CANCELLED EP-275 CANCELLED g'"P-276, 7 Fire and Damage Team Phone List 02/10/86 10/23/86

' wP-277 10 Personnel Safety Team Pnone List 10/27/86 10/23/86 EP-278 8 Security Team Phone List 10/06/86 10/23/86 EP-279 8 Emergency Operations Facility 05/12/86 10/26/84 (EOF) Group Phone List EP-280 9 Technical Support Center (TSC) 05/12/86 10/23/86 Phone List l EP-282 7 Government and Emergency 10/27/86 10/23/86 ,

Management Agencies Phone List i EP-284 7 Company Consultants and 10/27/86 10/23/86 Contractors Phone List l EP-287 4 Nearby Public and Industrial 10/27/86 10/23/86 Users of Downstream Water l EP-291 9 Staffing Augmentation 10/27/86 10/23/86 EP-292 9 Chemistry Sampling and Analysis 12/18/85 10/23/86 Team Phone List EP-294 9 Dose Assessment Team Phone List 05/27/86 10/23/86 l EP-301 2 Operating the Evacuation Alarm 10/27/86 10/27/86 and River Warning System EP-303 3 Local Evacuation 12/12/84 10/23/86

/'~?-304 4 Partial Plant Evacuation 10/27/86 10/23/86 N I

'EP-305 6 Site Evacuation 10/27/86 10/23/86

Page 4 of 4 l-. , Revision 65 10/28/86 O LIMERICK GENERATING STATION

. EMERGENCY PLAN PROCEDURE INDEX

==============================================================

DATE OF LAST PROCEDURE REV. DATE SIGNED PERIODIC UUMBER NO. TITLE BY SUPER. REVIEW

========================================================r=====

~l EP-306 4 Evacuation of the Information 10/27/86 10/23/86 Center

-l EP-307 3 Reception and Orientation of 10/27/86 10/23/86 Support Personnel EP-312 5 Radioactive Liculd Release 01/09/86 01/09/86 EP-313 2 Distribution of Thyroid Blocking 12/12/84 10/26/84 Tablets EP-314 1 Energency Radiation Exposure 03/29/85 12/06/84 Guidelines and Controls EP-315 8 Calculation of Offsite Doses 09/02/86 01/09/86 during a Radiological Emergency using RMMS in the Manual Mode EP-316 4 Cumulative Population and Near 02/10/86 02/10/86 Real-Time Emergency Dose

~

Calculations for Airborne

? Releases Ma'nual Method y'dP-317 5 Determination of Protective 09/02/86 10/23/86 Action Recommendations EP-318 2 Liquid Release Dose Calculations 04/01/85

~

04/01/85 Method for Drinking Water EP-319 2 Fish Ingestion Pathway Dose 03/29/85 03/29/85 Calculation EP-325 3 Use of Containment Dose Rates to 02/27/85 10/26/64 Estimate Release Source Term l EP-330 5 Emergency Response Facility 10/27/86 10/23/E6 Habitability EP-333 1 Adjustn.ent of Wide Range Gas 05/08/85 05/08/05 Monitor Conversion Factors EP-401 3 Entry for Emergency Repair and 04/01/86 04/01/86 Operations EP-410 3 Recovery Pnase Implementation 03/29/85 10/23/86 EP-500 2 Review and Revision of Emergency 12/12/84 10/23/86 Plan i

T -

1 L

I e

- ., . EF-102, Appendix 1 l

! 3865126290 Rev. 1-

- Page 1 of-6 s . MJR:rgs i

).t.

l APPENDIX EP-102-l' '

i / g 6'$

UNUSUAL EVENT NOTIFICATION FORMS I i FORM 1: UNUSUAL EVENT NOTIFICATION MESSAGE l

i. MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a drill. This is (name) _

, telephone number at the i

1 Limerick Generating Station calling to report an Unusual Event at.

Unit No. . Time and date of Unusual Event classification are i

(24 Hr Clock Time) (Date)

The basic problem is .

' O -

V There (HAS/HAS NOT) been an (AIRBORNE) (LIQUID) radioactive release

~

from the plant. The plant conditions are j.

t

] . (STABLE / IMPROVING / DEGRADING). There is no protective action i

recommended. This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

1 9

,i g

,. T \\

.s

.s :ss

(; 3'l g

\, ss \ a - .\ >.1

,-g}T.\k

'. Emerge

cy Director i .-
,\;).,\',g.

xn . ., ., 1a

.. .. s . ,

\ ' ' * . ,s y

.e \\ a ;h

,e* . 5 ' *

"l

._ ..s...y

,' t' ; N. I 9.: s s * ",}

k, g ,',\\ ,! /

-.. . - --~..-- . . - _- . . - - . -

t , ,

'i EP-102, Appendix 1

'l Rev. 1

Pace 2 of 6

~ MJR:rgs

.,=

1 APPENDIX EP-102-1 l

FORM 2: UNUSUAL-EVENT DE-ESCALATION MESSAGE

}(

i

! MESSAGE: This-(IS/IS NOT) a drill. This (IS/IS NOT) a drill. This is (name) _ at Limerick Generating Station

} calling to de-escalate an Unusual Event. Please connect me with the 1

appropriate authority. This is Limerick Generating Station calling 1

{j -. to report the termination of an Unusual Event. Time and date are . . This (IS/IS NOT) a drill. This (IS/IS i

J -

i l

)NOT) a drill.

d I

4 t

k Emergency Director

?

3 a

l i

t 4

l i

4

< L 4

l 4

..,~w.,m,,-7,.%,__,...,..-,_.,.m_,.m.,.,--...----mm.....---..._ . _ ~.. ,,- .-,--- - - - -, - - n - , -, . _ --

EP-102, Appendix 1 I Rev. 1 Page 3 of 6 I MJR:rgs !

APPENDIX EP-lC2-1 l FORM 3: UNUSUAL EVENT PHONE LIST l Time Initiated IPERSONNEL/ AGENCY TO BE NOTIFED l PHONE NUMBER l l l

[WITHIN APPROXIMATELY 15 MINUTES l (F RCM NUMBER USED) l TIME l PERSON RESPONDING l la. "lant Manager lilome l l l l IOffice Ext. ort l l l l l Brown n Ext. l l l

[ l pager, I l l 1 1 I l l 1 I I ce l l l 1 1 I I I 11 1i M IIIome IOffice Ext.

i l

I I l 1 l1 !Pager i l l 1 1 I I I

1 lHome l l I I IOffice xt. I I l I I

!c. Montgomery County Office Blue phone, 'x t . l i of Emer. Preparedness and l'f Blue nhone is no availablel l I l Medical Services l l l Id. Pennsylvania Emergency llLlue phone, Ext. l l Management Agency _

.I l l le. Pennsylvania Bureau of IWhite ) hone, Ext. , l l l Radiation Protection  ! , I l l

!  !!arrisburg, PA l or, l l l I

I _ (PEMA a g l l l f . filiC' perations Center .I l l I Bethesda, MD l Red Phone l l l ,

1 I I I I l (Person contacting NRC must l l l t be Licensed Operator) l l l l l lmummmmme l l l' l

I e

'l-muumans _

l l

l l

l, 1

I -1 I I -

l W

t f

EP-102, Appendix 1 ,

l Rev. 1 Page 4 of 6 l FORM-3 i UNUSUAL EVENT PIfONE LIST (CONT'D)

Tirae Initiated wm... l l l FHONE FfUMBER l l l <

I PEYSONNEL/ACENCY TO BE NOTIFIED l (CIRCfE NUMBER USED). l TIME l PERSON RESPONDING l lSecondary notifications to be 4 Icompleted after the above , l

- +

l I s .onnel/ agencies have been notifed l I I - l

. 1 I l 19 te nc ~- - Public Information Illome  ! l l l IOffic I I l l IPager i I I i 1(after tone, tal phone l I l l 1 number which you are using) i l l 1 1 I I i 1I (Alternate) liiome l l 1

l IOffic I I I I IPager I I I l 1 1(after tone, dia pEone i l l 1

61 umber whigh you are using) l l ,

l 1

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> askforhuill*c

into representative on call l l  ! .

l l I th. Site - Emergency IHome l l l

l 1 Planning Coordinator ico o l l l IOf(dr l Pag i I I

i i I i i l l Alternate- Director of lilome l l l 1 Emergency Prep. R. Kankus lPager i l l I or Ipffice i I I

I 6 IIlome IPager 1 I I

I i I I i loffic I I Ii. Berks County Emergency lW"' n h o mL Ext. W l l I

l 1-ta n a g e m e n t Agency I l- l l 19 Chester County Emergency IBlue phone, Ext. M i l l r i Services I 1h. % eraLions SecuriLy IM l Ext. -

l l

^

l l l l

EP-102, Appendix 1 l Rev, 1 Page 5 of 6 MJR:rgs FORM-3 UNUSUAL EVENT PiiONE LIST (CONT'D) l l Pl!ONE NUMBER l l l l PERSONNEL / AGENCY TO BE NOTIFIED l (CIRCLE NUMBER USED) l TIME I PERSON RESPONDING

~

I

11. Construction Management i l I l

! I i I I I I

6 IIIome IOffice l I I i I I I 6 Ilfome i l i l IOffice l I I I EggggEEEEEt Iliome i I l l IOffice i I I I I I

JEElllllIII Iltome loffice i

i l

I i

I 1 loffice i l l Con.pleted By: Time /Date verified By:

EMERGENCY DIRECTOI4 O O 9 >

EP-102, Appendix 1 l

Rev. 1 Page 6 of 6 MJR:rgs FORM 4: On-Site Notifications Escalation De-Escalation Operations Engineer ext. M Technical Engineer ext. g Shift Supervisor ext. g STA ext. M Shift H.P. Sr. Tech. ext. g l Shift Chemistry Tech. ext. 3 Shift I&C Tech. ext. g i

Shift Maint. Asst. Foreman ext. g l

l I

n - _ , . - - - , - __ -- -

a. -

, EP-103, Arcendix 1 F 08651a,6300 ~~

Rev. 1 Page 1 cf 8 1

MCR/rgs

-d7')

APPENDIX EP-103-1 /

ALERT NOTIFICATION FORMS [O [

FORM 1: ALERT NOTIFICATION MESSAGE MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a drill. This is (name) , telephone number at Limerick Generating Station calling to report an Alert at Unit No. __.

Time and date of Alert classification are , .

(24 hr. clock time) (date)

The basic problem is . There (HAS/HAS NOT) een an (AIRBORNE) (LIQUID) radioactive release from the plant. The plant conditions are (STABLE / IMPROVING / DEGRADING). There is no protective action recommended. This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

\\\ 2\\

S [}

, ,, JEmer Director s, s . \ :,s ,gencyg ,

.;.s -

-[h ,\ \ ,\ s '. -

- ~

\\, ,3 , l+,

4 \ *

-l's:

.>~ 3 i

.-' '. . / '

<,s t,',' l '1

$d .g, ,[\

ea i ( * . '-

h **

\'ts.

. .\ . ' )

l

i t-EP-103, . Appendir 1 3  :-l_- Rev. l' Page 2 cf-8 a,( .MJR/rgs FORM 2: ALERT DE-ESCALATION NOTIFICATION MESSAGE f MESSAGE: This (IS/IS NOT)'a drill. This (IS/IS NOT)'a drill. This is i.

1 1 -

J (name) at Limerick Generating, Station calling to report

[ . a change in emergency classification. The Alert has been (DE-ESCALATED i .

j.

TO AN/ UNUSUAL EVENT / TERMINATED).

! Time and date are , .

I (24 Hr Clock Time) - (Date) i The plant status is (STABLE / IMPROVING). This (IS/IS NOT) a drill. This i

l (IS/IS NOT) a drill. ,

1 -

i f

I i ,

i i

j Emergency Director-1 j

i 1

1 1

1


w--- ,,r. m ir m ey,. w ww. ,w _ _. _ _ _ _ w. _. -v---, em -cy, - w.w w - ,,,w w w _ _ m,wwynw mv y-w

EP-103, Appendix 1 l Rev. 1 i Page 3 of 8 MJR/rgs FORM 3 ALERT PIiONE LIST Time Initiated (INITIAL NOTIFICATION) 1 PERSONNEL / AGENCY TO BE i10TIFIED l PiiONE NUMBER l l l lWITi!IN APPROXIMATELY 15 MINUTES l (CTRPLE NUMBER USED) i TIME l PERSON RESPONDING l '

la. Plant ttanacer liiome l l l l l l Office Ext. or i l l 1 ha I i l I I I I lilome l l l i lOffice Ext. l l l 1 1 I l l l1 liiome l l l 11 IOffice Ext. l l l 1l l Pager l l l 1

I I

W 1 IIIome lOffice Ext.

1 I

l I

i l

I l

l 1 1 I I l lb. Load Dispatcher l Office l l l 1 1 I I l 1 Blue phone Ic. Montgomery County Office of P. x t . l l l 1 Emergency Preparedness l l

. . l_ _ _ . . . . _ - - . __ _ _ _ . _. .. . l Id. Pennsylvania Emergency l Blue Phone, Ext. l I i l Management Agency I __

l l l le. Pennsylvania Bureau of l White phone, Ext. or _ l l l l I (BAM-4nt ) l l [

l Radiation Protection I (8am-4pm) ~l I i

l Ilarrisburg, PA l (8am-4pm) l l 1 1 I I l 1 l MA a ter pm) l l l

11. NRC Operations Center: l Red Phone WNS) l l l l Bethesda, MD l lMake this call last and remain i l l l lon Telephone until NRC l l l i l

Idisconnects  ! I l l (P u contacting NRC must be l lLic1 d Operator) l l l l

l EP-103, Appendix 1 i Rev. 1 Page 4 of 8, MJR/rgs' FORM 3 ALERT Pl!ONE LIST Time Initiated (INITIAL NOTIFICATION)

I l P110NE NUMBER l l l l PERSONNEL AGENCY TO BE NOTIFIED l (CIRCLE NUMBER USED) l TIME l PERSON RESP _ONDING l1 ISecondary notifications to be lI l completed after the above  ; ll l personnel / agencies have been notifed Il 1 1 I l l!

19 Manarmr " " ' ' -

Information liiome l 1 1' I loffice l l ll 1 IPager l l li i l(after tone, tal phone numberl l l>

1 IWhich y n o ""in ) l l l l6 l';7;ce J

lPager l

l l

! 1(after tone, dial phone numberl l l, I lwhich you are using) l l l l 24 IIours l M l l l!

1 ._

l(ask for Public Info l l l

) l IRepresentative on call) l l ll 1 1 I I l lh. Site Emergency IIlome i l l i

l l

amissisie r" l!!!:"

I

~

l l l' '

i I l l 1 Alternates  ! I I Ii j i uirector - Emergency lilome l l l I r>r,ma oa loffice r

1 l

6"o"e IPager l

l l

1 l

l l

l l

l l lIlome l I l

!  ! Office 1 I ll l

lPager l l l'

.I I I

i. llerks Count.y Emergency IBlue Phone, Ext. l l I'

l i l- 1 I I l Management Agency l

l l ll l l 1 1' Ij ms r County Emergency I

@ l l

I 1

EP-103, Appendix 3 i Rev. 1-Page 5 of 8:

MJR/rgs:

FORM 3 ALERT PHONE LIST Time Initiated (INITIAL NOTIFICATION) l l PHONE NUMBER I l l; IPERSONNEL/AG2NCY TO BE NOTIFIED i (CIRCLE NUMBER USED) l TIME I PERSON RESPONDING l 1 1 I I l lk. Operations Security iExt. l l l

~

l l  ! l l,

11. Construction Management l l l l 1 I I I 1 i  !% l";itce  !  !  !

lN  !";;;ce  !  ! F i i $$ce I I ! IHome l l l l loffice i i 1, I loffice 1 I ll Completed By: Time /Date Verified By:

EMERGENCY DIRECTOR h

O O O

i l I i l

EP-103, Appendix l!

l Rev. 1l Page 6 of 8; MJR/rgsl FOMi 4 ALERT PHONE LIST Time Initiated (ESCALATION OR DE-ESCALATION)

I l PHONE NUMBER I l l I l PERSONNEL / AGENCY TO BE NOTIFIED l ( C T y r .' NUMBER USED)

, l TIME l PERSON RESPONDING 1:

l la. Plant Manarn r lHome l l ll I

I l lOffice Ext. or l l ll l l Brown ho a

. l l l l l Pager l l l!

I I I I It

!!I I M

!" E ce E i

litome l

l l

l l

l 1

l 1- lOffice Ext l l l

! 1 1 I 1:

lb. Load Dispatcher loffice I l 1-.

1 I . I i l lc. Pennsylvania Bureau of l White Phone l l l l Radiation Protection lExt. or (Bam-4pm only) l , l 1, 1 11a rrisburg (8am-4pm only)l l ll l m-4pm only)] l 1:

I lor I I i, 1 I (PEMA after 4pm) l l l.

Id. NRC Operations Center: ID"" D'v I l l l l Bethesda, MD I l l 1 I I I I 'l I l' I i 1 Is

! I I I I!

lMake this call last and remain l l l l lon Telephone until NRC l l l l Idisconnects l 1

i l I. i c.

n contacting NRC must be I

l l

I l

l l

l g l i

l m< l O ne_r a_t o.r_) _.__ l.__ _ _

i

_l _ _ _ _ _ _ _ ________

l

EP-103, Appendix 1 i Rev. 1 Page 7 of 8 l

MJR/rgs>

FORM 4 ALERT PIlONE LIST Time Initiated (ESCALATION OR DE-ESCALATION)

[ l PiiONE NUMBER I l lt IPMRSONNEL/ AGENCY TO BE NOTIFIED I (CIRCLE NUMBER USED) l TIME I PERSON RESPONDING l l Secondary notifications to be l icompleted after the above personnel / l lacer.cies have been notified l'

! e! ' ~a n a < pi r - Public Information !!!ome

~

l l l l lOffice l l l

[ IPager l l l, I l(after ne, dial phone I i l l number which ' m e using) l l ll '

I i lilome l l l; l

I l Office i l l l lPager l l li i l after tone, dial phonel l l 1 I number which you are l l l l l usino) l l l l 24 Ilours l l l l' l l (as or Public Info l l l' l l Representative on call)l l l 1

lf. Site Emergency I

lilome I

l I l[

l l l Plaanino Coordi" tor l Office l i l l lPager l l l'

! l l l l l Alternates l l l l l

1 Director - Emergency Pr ,

lilome

[ Office l l ll l l l' l W.redne:.*  !""~ l l l l lilome l l l I lOffice l l l, 1 leager __ __

l l l O O O

t l

l EP-103, Appendix 1

, l Rev. 1, J Page 8 of 8 MJR/rgs l

FORM 4 i ALERT PHONE LIST l Time Initiated (ESCALATION OR DE-ESCALATION) l l l PHONE NUMBER l l l1 i

l PERSONNEL / AGENCY TO BE NOTIFIED l (CIRCLE NUMBER USED) l TIME l PERSON RESPONDING l 19 Montqcmory County Office Inluo nb w Ext. I l';

! l of Emergency Preparedness l l l C

1 1 I I I

! Ih. Berks County Emergency lDlne nhono, Ext. M l l l l 1 Managment Agency i l l l 1 I~ l l Ii li. Chester-County Emergency I Services Inlun Phone Ext. M 1 l l l l l 1 lj . Operat ions Security i

l Ext. M l l lI t l I I 1, i

ik. Construction Management l l l l' I I I l l l lIlome l l l 1 I I I I I IOffice i I

%~

I l l"7;;ce  !  !  !

l l l

!Ilom7 l 1 1Ofiice 1 i I, l

lh 1

l";;;ce IOffice l

I l

Completed By: Time /Date, j

  • Verified By:

, EMERGENCY DIRECTOR J e - -- -

e #

. . . .. =

.....d.':s..L

. . , , , .' . . . .. .. - .. , m.. . ... : .... - .....: - -..*. ...- ...~.. - -. --.u.i. u  :...... ...; ,........

""- 4' APPe i i 3865136310 ,?

Page 1 of 12 MJR:hfz'

APPENDIX EP-104-1 SITE EMERGENCY NOTIFICATION FORMS FORM 1: SITE EMERGENCY NOTIFICATION MESSAGE v

MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

This is (name), Limerick Generating Station calling to report a Site Emergency at Unit No. . Time and date of 4.

Site Emergency classification are: a a / / .

(24 Hr. Clock Time) (Date)

N The basic problem is . .

's There (HAS/HAS NOT) been an (AIRBORNE / LIQUID) radioactive release from the plant. The plant conditions are (STABLE / IMPROVING / DEGRADING).

f There is no protective action recommended.

l l

This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

i l

l CO@ik7' o

l e %m "g G 1

gg w

, ...~. .........a.......u....m.s.:...:.....u......._.:...........u.... . ..;......

EP-104, Appendix 1 Ol Rev. 1 Page 2 of 12 MJR:hfz APPENDIX EP-104-1 SITE EMERGENCY NOTIFICATION FORMS FORM 2: SITE EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

This is (name), Limerick Generating Station calling to report a change in emergency action level. The Site Emergency has beca (DE-ESCALATED TO/AN UNUSUAL EVENT / ALERT / TERMINATED).

t=2 Time and date are:

O 3

A.

(24 Hr. Clock Time)

, * /

(Date)

/ .

The Plant conditions are (STABLE / IMPROVING).

This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

Emergency Director O

,..--,-_,,,,,-y,.__m._.,----.m______-.--,,y- - -- -

. ,, -.w..,.-,,. ,

) .1 EP-104, Appendix 1

! l Rev. 1 Page 3 of 12

MJR:hfz l

i APPENDIX EP-104-1 ,

1 i l SITE EMERGENCY' NOTIFICATION FORMS FORM 3: SITE EMERGENCY PHONE LIST I

(INITIAL NOTIFICATION) l Time Initiated:

1 1 i l l I I I

! i l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME I PERSON I i

l (Within approx. 15 Minutes) l (Circle Phone Number Used) l l RESPONDING l l l l l l I Plan Mana er l l l l

I a. l Home
l l l I l Office o l l l l l Brown P . l l l

, I l Pager: l l l I I I I I l l O!$$e .

!1 Ii l l M l Ho:ne:

l Office Ex l

l I l l l

, I I l Pager: l l l l l l l 1 I .

l l Home: l l l l l Office Ext: 1 I l l , I I I

~

. I b. Load Dispatcher l Office: l l l l i I l l,

) , I c. Montgomery County Office l! Blue Phone: Ext. @ l l l j i of Emergency Preparedness -

1 I ll

) -

1 I I l ll

1 1 d. Pennsylvania Emergency l Blue Phone * (8 AM - 4PM) l l lI

,i l Management Agency l Ext. $(After 4 PM) l l l!

l i

i O Os O

+

! i i , EP-104, Appendix 1

,i l

Rev. 1 l .; -

Page 4 of 12 MJR:hfz j APPENDIX EP-104-1 ,

i SITE EMERGENCY NOTIFICATION FORMS

.i

  • FORM 3: SITE EMERGENCY PHONE LIST

.' (INITIAL NOTIFICATION) l _] Time Initiated:

I  : 1 I I I l l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON l i

l (Within approx. 15 Minutes) l (Circle Phone Number Used) l l RESPONDING l l

l l l l l i i l e. Pennsylvania Bureau of l Whita Phone, Ext: l l l i l Radiation Protection, l (8SAMor- l l l l i i Harrisburg, PA l (8 AM - 4 PM) l l l l l (PEMA) (After 4 PM)l l l t i I I i i

! f l f. NRC Operations Center l Red Phone: l l l 1

l Bethesda, MD l l l l

_. l I l l 1

'! l Make this call last and l l l l'

-? I remain on telephone until l l l l

'; l NRC disconnects l .

l l l I l 1 l 1 l (Person contacting NRC l l l l j l must be Licensed Operator) l l l l l

I i

i l

i l

) -

k EP-104, Appendix 1 i 1 Rev. 1 1

Page 5 of 12 MJR:hfz

APPENDIX EP-104-1 ,

SITE EMERGENCY NOTIFICATION FORMS

.. FORM 3: SITE EMERGENCY PHONE LIST j (INITIAL NOTIFICATION)

-j

[.' Time Initiated:

-i l I I l l 4

l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME I PERSON l

, 1 I (Circle Phone Number Used) l l RESPONDING l 1 I I I I i l Jecondary notifications to be l l l l l l completed after the above l l l l

! I personnel / agencies have been I l l l

~

I notified: l l l l

. l i I I I i i g. Manager - Public Informationl Home:' l l l 3

I .

I Office I l 1

- l l Pager: l I l

l l (After tone, di phone l l l

~1 l l number which you are using) l I i 1 I I w

I I

! l"f=ne:  !  !  !

l l Pager: l l l

,i l I (After tone, d al phone l l l

.l l 1 number which you are using) l l l I I I I I I

l 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> lO I Gs for public info l

l l

l l

l l l representative on call) l l l

. .)

~

! s '

f i

.** EP-104, Appendix 1 i

l g Rev. 1 i -

Page 6 of 12
.. s-s,.,,e...,.3.., MJR
hfz APPENDIX EP-104-1 .

j SITE EMERGENCY NOTIFICATION FORMS l FORM 3: SITE EMERGENCY PHONE LIST l (INITIAL NOTIFICATION) i

^

  • ' ^ "

! Time Initiated:

i j -

1 I I I l l l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON l l l (Circle Phone Number Used) l l RESPONDING l l . I I I I I

, l h. Site Emergency Planning l Home
l l l

! l Coordi l Office Ext: r l l l

,' l l Pagar: l l l l l l l l l 1 l Alternates l l l l

, I Director - Emergency I Home:- l l l I i Preparedness l l Office Ext l l l

. l tm4pmes l

""S":

l l l 4

'i

I l

h l I Home:

Office Ext: or l

l l

l l

l I I Pager: l l 1

! l (After tone, ' phone l l l l l number you wish called, I l l l l then dial "#" symbol) l l l l l l l 1 l i. Berks County Emergency ll Blue Phone: Ext. $ l l l l l Management Agency l l l 1

I I- 1 l l g

,' l j. Chester County Emergency l Blue Phone
Ext. l l l

, l Services l l l l

) I I - 1 I I l _k. Operations Security l Office Ext: l l l 1

EP-104, Appendix 1 l Rev. 1 Page 7 of 12

'l MJR:hfz

3 APPENDIX EP-104-1 ,

i

'! SITE EMERGENCY NOTIFICATION FORMS 1

FORM 3: SITE EMERGENCY PHONE LIST i .

(INITIAL NOTIFICATION)

'i Time Initiated:

1 i l I I I l

! l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON l

! l l (Circle Phone Number Used) l l RESPONDING l

{ ", l l l l l

I l Office Ext
Home l l l l l l  !

1 I

I Completed By: Time /Date:

.3 Verified By:

j j Emergency Director j .;

I 4

l .-

l

'l h h.)

l i

EP-104, Appendix 1 i

l Rev. 1 Page 8 of 12 MJR:hfz APPENDIX EP-104-1 ,

); SITE EMERGENCY NOTIFICATION FORMS FORM 4: SITE EMERGENCY PHONE LIST i

(ESCALATION OR DE-ESCALATION)

Time Initiated:

i 1

I I I I l l l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON l

'i I (Within approx. 15 Minutes) l (Circle Phone Number Used) l l RESPONDING l

!! I I I I l 1  !

l Plant Manager l l l l I a.

l 6 l Home:

l OfIice Ext:

l l

l l

l l

l l NN WMvs;,:**-

l Bro Phone: Ext '

  • l l l i I l l l l

WM I Pag # ' ' '% I "

l l l l l l' -

i l 1

N l " 1N" I

l l

l l

l I

I I l l M i Home:

l Office Ext:

l l

l l

l l

ll I

l l l

l l Pager:

1 l Home:

l l

l l

l l

l l

l l l Office Ext: l l l l' I I -

I I I

' Load Dispatcher

l l Office
l l l l_b.

l l l 1

-l l c. Pennsylvania Bureau of l White Phone, Ext: l l l l Radiation Protection, Harrisburg, PA l

l S

8 AMor- @4 PM) 8 AM - 4 PM) l l

l l l l l

} .;

I l (PEMA)(After hours)l l l 4

i ',

\

O es .

O

I i

t EP-104, Appendix 1 1 Rev. 1 Page 9 of 12 MJB:hfz APPENDIX EP-104-1 ,

SITE EMERGENCY NOTIFICATION FORMS FORM 4: SITE EMERGENCY PHONE LIST

. (ESCALATION OR DE-ESCALATION) i Time Initiated:

! I I I I l I PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME I PERSON l (Circle Phone Number Used) l l l l l RESPONDING l l~ l i I I

, I d. NRC Operations Center I hone: l l l l Bethesda, MD I l l l l l l l l l l M3ke this call last and l l l l i i remain on telephone until l l l l l NRC disconnects l l l l ,

i -

I l 1 1 I I l ,

I (Person conta6 ting NRC l l l l I must be Licensed Operator) l l l l e

t j

I -

1 i  :

d

)

1 -

EP-104, Appendix 1 1 Rev. 1 Page 10 of 12

, MJR:hfz APPENDIX EP-104-1 ,

SITE EMERGENCY NOTIFICATION FORMS FORM 4: SITE EMERGENCY PHONE LIST (ESCALATION OR DE-ESCALATION)

Time Initiated:

i ' l I I I l 1l l PERSONNEL / AGENCY TO BE NOTIFIED I PHONE NUMBER l TIME I PERSON I i

l l (Circle Phone Number Used) l l RESPONDING I

! I I I i l

! l Agencies to be contacted after l l l l

! l the above personnel / agencies l l l l l: I have been notified: l l l l

! I I I I i j, I e. Manager - Public Informationl Home: l l l l l Office 1 I I i l Pager: I I I l l (After' tone, phone l l l

l l number which you are using) l l l l

' l I I I I i ll l Home: I I l l l Office: 1 I I I I Pager: 1 l l

. . l l (After one, 1 phone l l l l l number which you are using) l l l I i l l I

'I l 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l l l l l l l s r public info l l l

l l representative on call) l l l 4 i 4

i f

O O

l. Os i

e iE EP-104, Appendix 1

! l Rev. 1 l

Page 11 of 12 MJR:hfz

, APPENDIX EP-104-1 .

SITE EMERGENCY NOTIFICATION FORMS

. FORM 4: SITE EMERGENCY PHONE LIST i i (ESCALATION OR DE-ESCALATION)

! Time Initiated:

I I I I l

!. I PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON l l l (Circle Phone Number Used) l l RESPONDING l I I I I l l f. Site Emergency Planning l Home: l l l l C i l Office or M l l l l, l I

l Pager:

l l

1 l

I 1

, l 1- l Alternates l l l l l' l Director - Emergency

  • l Home: l l l I l Pr aredaess i Office l l l
'; I l Pager
l l l l l l l 1 l l Home: l l l l! l l Office E r I l l i
I l Pager
l l l l! l l (After tone, dia phone l l l

,; I l number you wish called, I l l

,: l l then dial "#" symbol) l l l

'l l l l l 'l l1 l g. Montgomery County Office of Emergency Preparedness l_ Blue Phone: Ext. g l l l 1 l l l l I h. Berks County Emergency I ntue enone: Ext. l l l l l Management Agency l l l l

. I I- 1 I I l i. Chester County Emergency ll Blue Phone: Ext. % l l l ll l Services l 1 l l

h- h_) h

i EP-104, Appendix 1 ,

I l Rev. 1 l , Page 12 of 12 i KJR:hfz l

APPENDIX EP-104-1 .

l l SITE EMERGENCY NOTIFICATION FORMS I FORM 4: SITE EMERGENCY PHONE LIST (ESCALATION OR DE-ESCALATION)

Time Initiated:

I il l I I I l l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER I TIME I PERSON l i l l (Circle Phone Number Used) l l RESPONDING l 1

1 I I I I l l J. Operations Security I

l Ext: %

I l

I l

I l

I i

l l Office Ext: me l l l Completed By: Time /Date: _

, Verified By:

'- Emergency Director j

i 1

l I

1 i -

~

.. k .)

h

.g. . . . . .. m . . . _ - . . ' se

. . . . . _ . . _ . . . . . . . . . _ . . . ;_....__............;.s.

1 3865136320 EP-1 5, App 2g i,7 Page 1 of 12 MJR:hfz

'k' APPENDIX EP-105-1 GENERAL EME~RGENCY NOTIFICATION FORMS $0 El FORM 1: GENERAL EMERGENCY NOTIFICATION HESSAGP

. MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

This is (name), telephone number at Limerick Generating Station calling to report a General Emergency at Unit No. . Time and date.of General Emergency classification are:

, / / .

(24 Br. Clock Time) (Date)

The basic problem is: .

There (HAS/HAS NOT) bee'n an (AIRBORNE / LIQUID) radioactive release from the plant. The plant conditions are (STABLE / IMPROVING / DEGRADING).

The protective action recommended is:

The affected area is: .

THIS (IS/IS NOT) A DRILL. THIS (IS/IS NOT) A DRILL.

  • IF A GENERAL EMERGENCY HAS BEEN DECLARED WITHOUT PRIOR' EMERGENCY CLASSIFICATION, PROVIDE THE RECOMMENDATION TO SHE I 2 MILE RADIUS AND 5 MILES DOWNWIND OF TH Tg&

ARE NOT AVAILABLE, MAKE THE RECOMMENDATI @,44 FULL CIRCLE (360 DEGREES) DIRECTLY TO TH k,ERWISYMSf RECOMMENDATION AS DETERMINED BY EP-317.

$f

.. n l

( h tig.b)i a O I

. ..,,,n, nre (ftlff

' 'Imergency Director iN

l

...... . ..x::a :. .... ..a..,. . .. . .a . ...... ........ . . . . . . . . . . . . . . . ._ .

~ ~ ' '

EP-105, Appendix 1

'. l Rev. 1 )

Page 2 of 12 -

MJR:hfz v

((- APPENDIX EP-105-1 l

CENERAL EMERGENCY NOTIFICATION FORMS I FORM 2: GENERAL EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE ,

i; MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a drill. .

This is (name), Limerick Generating Station calling to report a change in emergency action level. The General Emergency has been (DE-ESCALATED TO/AN UNUSUAL EVENT / ALERT / TERMINATED).

Time and date are:

, , -/ / .

f -

(24 Br. Clock Time) (Date)

'(

j The Plant conditions are (STABLE / IMPROVING).

This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

Emergency Director L

l '

l

!(O l

, EP-105, Appendix 1 I I Rev. 1 Page 3 of 12 .,

MJR:hfz i:

APPENDIX EP-105-1 Oc GENERAL EMERGENCY NOTIFICATION FORMS  ?

i U

FORM 3: GENERAL EMERGENCY PHONE LIST D:

(INITIAL NOTIFICATION) ic

, s.,

p Time Initiated: g L;

1 I I l l C.

l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON l I:

l l (Within approx. 15 Minutes) l (Circle Phone Number Used) l l RESPONDING l $

l l Plant Manager l l l 1 y l l l l l [:

i. 1O .or I I L i l l

l "::::liinidis**

i l

I l

I l

I fio l l Home: l l l- , .;

l l l Office Ext: l l l  ;

I I l l l b

ll l Home: l l l hj

{:

i l l l Office l l l r, z

II I Pager
l l l y L

1 il g l ll neme=ammam Of fice L t:

l l

l I

l l

E

!* ~

[f:

1 1 --

_ l l l  %,

!'S' l b. Load Dispatcher -

l Office: l l l If l l I l l [E l'

I c. Montgomery County Office of Emergency Preparedness l Blue Phone: Ext. g l l l @

l l l l C' l l l l :i I d. Pennsylvania Emergency l Blue Phone: Ext. (8 AM - 4 PM) l l l 9 i l Manacement Agency I fter 4 PM) l l l I9

,l l

y

. ea e4 e

[E g

i EP-105, Appendix 1 I Rev. 1 j . Page 4 of 12 i , . MJRahfz j APPENDIX EP-105-1 1

j ,I GENERAL EMERGENCY NOTIFICATION FORMS b

FORM 3: GENERAL EMERGENCY PHONE LIST

, (INITIAL NOTIFICATION) i 1

Time Initiated

1 I i i l 1 1 PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME I PERSON l (Within approx. 15 Minutes) (Circle Phone Number Used) i l l l l RESPONDING l

.! l I I I l i

! I e. Pennsylvania Bureau of I White Phone, Ext: (8 AM - 4 PM) l I l j l Radiation Protection, I ( - 4 PM) l l l 1 .

l Harrisburg, PA l (8 AM - 4 PM) l l l 1 .i l l (PEMA)(After hours)l l l

! I I . I~ l I

) . l f. NRC Operations Center i Red Phone: l I I

! . l Bethesda, MD I l l l

I l I I I I

! i l Make this call last and i l l l

) .

I remain on telephone until l l I l i 1 i NRC disconnects l '

l l l l l l 1 1 I

} .'

l (Person contacting NRC l l l l l I must be Licensed Operator) l l l I ll t l 'l l .

l  ;

5 i

$- $; w

i 1 ,

! j EP-105, Appendix 1 I Rev. 1 l

Page 5 of 12 3 MJR hfr APPENDIX EP-105-1

GENERAL EMERGENCY NOTIFICATION FORVS

,  ! FORM 3: GENERAL EMERGENCY PHONE LIST l l~ (INITIAL NOTIFICATION) 1 Time Initiated: _

l I I I l l  : l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON l 1

~'

l l (Circle Phone Number Used) l I RESPONDING l

) I i i i l i ?! l Secondary notifications to be l l l l i I completed after the above l l l l

! ]' l personnel / agencies have been l l l l l l notified: l l l l t  ! I I I I l

!  ! I g. Manager - P 'c Informationi Homes l l l I i l l Office l l l

) i i i Pagers l l l 1

3 l l (After one,. al phone l l l

l l number which you are using) l l l l Homes , l I l l Offices l l l l  ; I l Pager: l l l
. l l (After tone, al phone l l

~

l l l number which you are using) i i

!')

1 -

1 l l l l

l I

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> IM l Task for public info l

l l

l l

I

'j l l representative on call) l l l

, r 1 . .

I 1

i

~

Gy 9

1 5

, ]: 1 EP-105, Appendix 1 Rev. 1 i

, l Page 6 of 12 I MIRahfa l APPENDIX EP-105-1 GENERAL EMERGENCY NOTIFICATION FORMS FORM 3: GENERAL EMERGENCY PHONE LIST i (INITIAL NOTIFICATION) ,

Time Initiated: -

i l 1 I I l 1 l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON l i l l (Ci cle Phone Number Used) l I RESPONDING l

, I .. I I i I

~

I l l l l

. I h. Site Emergency Plann'ing l Homer l l l 1

i i l Coordinator l Office Ext l Pagers r@ l l

l l

l l

li l l l l l l Alternates l l l l

.! 1: Director - emergency l Home: l l l li r ness l Office l l l

i ,

11 ll or i Pagers l

l l

l l

l l

' ~

I l Homes l l l i

l l

l l

Office E Pager rg ,1 l l l

l l

i .. l l (After one, dial phone l l l

'.I l' l number you wish called, l l l I then dial "#" symbol) l l l 1 I i l l i. Berks County Emergency l Blue Phon _e: Ext. M l l l l Management Agency l l l l l l 1 I l j j. Chester County Emergency services ll Blue Phone _: Ext. h l l

l l

l l

i I~ l i l l l _'- ; Operations Security l Office Ext _ l l l t .

r )

o m_ .

i I

j j

EP-105, Appendix 1 1 l Rev. 1

Page 7 of 12 i MJR
hfz 8

APPENDIX EP-105-1 i i 1 l  ! GENERAL EMERGENCY NOTIFICATION FORMS i U i

i FORN 3: GENERAL EMERGENCY PHONE LIST j  : (INITIAL NOTIFICATION) l I

l .; -

Time Initiated:

\

j . l l l l l l

l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TI!S l PERSON l l . l (Circle Phone Number Used) l l RESPONDING l l l l 1 I I

! I I i 1. I 1 i l i Off' Ext: l l l i -j l 'i j Completed By: .

Time /Date 1

i

! . . Verified By:

I Emergency Director i

)

! i -

k

. I 2

i j

-J sw

a l j EP-105, Appendix 1 l .1 I Rev. 1 l l Page 8 of 12

' MJR his APPENDIX EP-105-1 i 1 j GENERAL EMERGENCY NOTIFICATION FORMS l

FORM 4: GENERAL D(ERGENCY PHONE LIST (ESCALATION OR DE-ESCALATION)

, Time Initiated:

.: 1 I I i l l PERSONNEL / AGENCY TO BE NOTIFIED l PHOME NUMBER l TIME I PERSON l l (Within approx. 15 Minutes) l (Circle Phone Number Used) l l RESPONDING l I I I l l l Plant Manager l l l l I a.

i 6 -

1 Home:

l Office or l

I l

I l

i

I l Brown Phone l l I C
l l l Pagers l l 1 1 I I I I

! l l 1 M l Homes l Office- .

l I

l I

l l

, I I I I i

.; II 6 I Homes l l 1j

.. l l l Office Ext  ! l l l '$ Il l Pager: 1 l l l' 1

i i 1 - -

1 I I' j i l I

M l Homes l Office Ext:

l l

l I

l Il l l -

1 I l '

I b. Load Dispatcher l Office: l l l

c. Pennsylvania Bureau of l White Pho l l
i l Radiation Protection, I (8$AM_or h)

- 4 PM l l l

! [ l Harrisburg, PA l (8 AM - 4 PM) l l l I

i i

l l (PEMA)(After 4 hrs.)I l l 1 ..

e ew e

~

i 4

i v

qJ v . _ _

)

EP-105, Appendix 1

] " I '

Rev. 1 i

Page 9 of 12

, NJR:hfz APPENDIX EP-105-1 j -

, GENERAL EMERGENCY NOTIFICATION FORMS j i FORM 4: GENERAL EMERGENCY PHONE LIST i (ESCALATION OR DE-ESCALATION) i ,, Time Initiated I I I I I I -I l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUNBER .1 TIME I PERSON l

, I (Within approx. 15 Minutes) l (Circle Phone Number Used) l I RESPONDING 1 I. I I I l

I d. NRC Operations Center i Red
l l l

) l Bethesda, MD l l l l 1 1 -

1 I I I Make this call last and i .j l l remain on telephone until l

l l

l l

l l

l

{

l NRC disconnects l '

l l l

'; I I I l l l

I (Person contacting NRC 1 l l l must be Licensed operator) l

: ) l l l ;

i 4 .

$ ..' I i

i .

4 1 i

j .-

i i .

!  ?

I .!

I  :

l! -

i 3, i

P .

~

w  %>

I 1

i i

! EP-105, Appendix 1 i Rev. 1 i .

, Page 10 of 12 i

.

  • KIRahfs i APPENDIX EP-105-1 GENERAL EMEKGENCY NOTIFICATION FORMS l
FORM 4: GENERAL EMERGENCY PHONE LIST

{ ', (ESCALATION OR DE-ESCALATION) l 5 Time Initiated: -

!'! l I I I l l l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON l 1 l l (Circle Phone Number Used) l l RESPONDING l I I I i l l l Agencies to be contacted after l l l l

I the above personnel / agencies l l l l<

i have been notified: l l l l 1 1 I I I I I l 1 e. Manager - Public Informationl Homes l l l l>

,.; i I

I g i Office:

l Pager:

l I

l I

l I

J ~ ~' j l , I (After phone l l l I I number which you are using) l l l

! i l l  ! I I I

-J a

l l

" 'amum l " r i n e g, l Pager l

1 l

I l

I l l l l (After tone, dial phone l l l,

! I I number which you are using) l l l l l 1 1 I I I

.: 1 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l I I I

-l l l or public info l l l l ',; j l - l representative on call) l l l l

l I ,

t, j

' .)

4

$4 $q. __ _ _ _ _ _ _

h v

J EP-105, Appendix 1 [0 l Rev. 1 Page 11 of 12 )

KIRahis 3 i

i .,

APPENDIX EP-105-1 l

! GENERAL EMERGENCY NOTIFICATION FORMS 4: GENERAL EMERGENCY PHONE LIST l

FORM,(ESCALATION OR DE-ESCALATION) f, i , Time Initisteds i l l 1 I l l l PERSONNEL / AGENCY TO BE NOTIFIED l PHONE NUNBER l TIME l PERSON l

}' l l (Circle Phone Number Used) l RESPONDING l l I ,

I l r I f. Site' Emergency Planning l Homes l l l i l Coordinator i Office rE l l l p l ensmemme l e--

l l l }

l l Alternates l l l l l l Director - Emergency l Homes l l l t

! l Emisible l %;1 l l. l 6

i i or I I I i

! l **umus'8 ll mue sue l l l-

I Pager
l l l l l l (After tone., phone l l l 1

l l number you wish called, I l l l l l'then dial "f" symbol) l l l l I I I l j, l g.

I Nontgomery County office of Emergency Preparedness l R1 tia Phone l

Ext. O l l l l l l j~ I h. Berks County Emergency- l H l iin %-* Ext. '

l l l l l Management Agency l l l l 1 i. Chester County Emergency Blue Phongs Ext. l l l

1 Services I l l l i .

t l

$"& 1 d

$ J

[

t

, EP-105, Appendix 1 I Rev. 1 Page 12 of 12 KIRahfx APPENDIX EP-105-1  ;

GENERAL EMERGENCY NOTIFICATION FORMS FORM 4: GENERAL EMERGENCY PHONE LIST i (ESCALATION OR DE-ESCALATION)

. Time Initiated:

I I i i i

! PERSONNEL /AGCNCY TO BE NOTIFIED l PHONE NUMBER l TIME l PERSON I l l (Circle Phone Number Used) l l RESPONDING I I I I I I l l j . Operations Security l Ext. O l l l l l l l 1 1 I Office Ext: Home l l l

! l I

Completed By: Time / Dates c l Verified By:

Emergency Director O

I S

S b

W, U J

_ _ _ _ _ _ . _ _ _ _ _ _ M

l . _ . . . . . - . . . . . . . , . _ . . . . . . . . . . . . . . . _ _ . , _ . . .

3865136330 ""~*SN 5$i !

VAW/JLP/rgs ,

p PHILADELPHIA ELECTRIC COMPANY

{(-

d

, LIMERICK GENERATIN9 STATION- la 7 @(j EMERGENCY PLAN IMPLEMENTING PROCEDURE l EP-106 WRITTEN

SUMMARY

NOTIFICATION 1.0 PARTICIPANTS 1.1 Emergency Director shall direct the Chift Technical Advisor or other assigned Engineer to write a summary report following the closecut of an unusual event or the closecut or de-escalation of an Alert, Site Emergency or General Emergency.

1.2 Shift Technical Advisor or assigned engineer shall write a summary report.

2.0 ACTIONS - IMMEDIATE .

2.1 Emergen~cy Director shall: _

2.1.1 Direct the Shift Technical Advisor or assigned engineer to prepare the written summary in -

accordance with this procedure.

COMPLETE WITHIN 8 HOURS OF CLOSEOUT OR DE-ESCALATION OF AN ALERT, SITE EMERGENCY OR GENERAL EMERGENCY; COMPLETE WITHIN 24 HOURS OF CLOSEOUT OF AN UNUSUAL EVENT.

2.2 Shift Technical Advisor shall 2.2.1 Obtain the necessary information to complete Appendix EP-106-1 Emergency Class Closeout / Reduction Report.

2.2.2 Fill in the following informati t m:

a. Item 1 - Enter the r h.

units. I { gent i d at both unit op'.th t g,* f

b. Item 2 - Enter the docket n r. f e unit listed. 349 LGS UNIT 105000- (Mj0 \; ,\5k

/O LGS UNIT 2 C (gQ M n n au. x , M .s s_.aer: wan,. m .D...w e A GC% m s 2

  • w _*L* W M "*~*

2 .. .. .

           .l-                               -

EP-106, R2v. 5

                  .              .                                                                                                                                      Page 2 of 6 VAW/JLP/,rgs.
v. 3,
\. c. Item 3f-[Ehterthetotalnumberofpages,
d. Item 4 - Enter a concise description of '

the event.

e. Item 5 - Enter the date of the event.
f. Item 7 - Enter the date of the report. .
g. Item 8 - Enter name and docket number of Unit 2 if the event occurred at -

both units. LGS UNIT 2 05000- (353) l

h. Item 9 - Enter the operating mode. l
1. - Power Operation
2. - Startup
3. - Hot Shutdown  !
4. - Cold Shutdown
5. - Refueling
i. Item 1Q- Enter the percent of licensed  ;

( g, O. thermal power at which tha reactor was operating when the event l i

 \                                                                                           occurred.              -

l

j. Item 12 - Enter the.name of.the Shift Superintendent. .
k. Item 17 - Enter a brief description of i the circumstances and reasons behind theldoseout ef the Unusual Event or'the closeout or de-escalation of the Alert, Site ,

Emergency or General Emergency. ~ ~ ' . 2.2.3 Submit the report to the Emergency Director. 3.0 ACTIONS - FOLLOWUP ( j I 3.1 Emergency Director shall 3.1.1 Review the report for completeness and accuracy. l l l 3.1.2 Bave the Plant Manager or designet and the Operations Engineer or Technical Engineer review the report. This may require review over the telephone. 4

                                                                                                                                    . .7 Y

_....--~,.---_,______.._m_m.,_ _ _ _ . _ , _ , - - - . -. ,. m. ._..,._m., _,, _m ,.,_.__ .,.-_-.___._ - ,,,, .. __,,. _ ._____ , ,

1.

                                                                                          .                            I EP-106, Rev. 5          l l*    -

Page 3 of 6 , VAW/JLP/rgs l lt . 3.1.3 Have~the report telecopied within eight or twenty-

   \                                        four hours'as appropriate to the NRC Operations

. Center or Region I office via the following phone number: NRC Operations Center Region I Office 3.1. 4 ' Call and verify that the report was received: NRC Opt: ration Center Region I Office 3.1.5 If the report cannot be telecopied, have the report hand delivered within ei'ht g hours to the: !( 3.1.6 Forward a copy of the report to NRMS. 4.0 APPENDICES l l 4.1 EP-106-1 Emergency Class Closeout /De-escalation I Report . 5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide guidelines for the eight hour' written summary notification to the NRC following closeout or de- ) escalation of an Alert, Site Emergency or General l Energency Classification and for the twenty-four , hour written summary notification to the NRC l following closeout of an Unusual Event.

                                               -. .      -                 ;q
         .         ,                    -....                            *- o '
                                                                                                 ~

l* . EP-106, Rav. 5

                                                                   ,                                  Paga 4 of 6 VAW/JLP/rgs j                           52                 Criteria for\Use This procedure shall be implemented following a closeout of an Unusual Event or the closeout or de-escalation of an Alert, Site Emergency or General Emergene.y Classification per EP-101 Classification of Emergencies.

5.3 Special Equipment None 5.4 References

5. 4 .1 . NUREG 0654, Criteria for Preparation and Evaluation Rev. 1 '

of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants 544.2 EP-101 Classification of Emergency l t c jC)-x t 9 l l l I' i s s 3: s s ! /- D

                           'T'..                       g l                                                    \

l \ NR M5Ei m .> m h N e h mc7w.m 2 v.m-mm- m T-~ =

l i l* , EP-106, Rsv. 5

                       -                                                                                                                  Paga 5 of 6 VAW/JLP/rgs            ,'    {
                                                                                                                                                                        \

i

                                                                                                                                                                        \

< l (RIT / SE-ESCALATION EPORT mt 1 or 2 , FACILITT a m (I) SOCKET meter (t) PAG' 3

,                                     LInstIct caustATING STATION esIT                                        0l5g8 0,0l l g                I   SF    g              ,

TITLE (4) Evert ante (5) spent ente (7) evers FACILITits tunnvEn (s) NO DA TR MO DA TR FACILITT E M S SOCKET ABSER (5) ' I I I I I I I I I l I l 1 1 I I I I I WERATInt 11:15 EPORT IS SWIITIED putsuNrT TO TIE MOUIEDDrt W 10 tra er === =* *= w u =W(II) IU 20.40t(t) - 30.405 (c) , $0.73 (a)(2)(t v) ,,., 73.71 ())

                                                . N.405(e)(1)(t)         N.36(c)(1)                 50.73 (a)(2)(v)             73.71 (c) 8       8 '        N.405(a)(1)(ft)    . to.3s(c)(2)                50.73 (a)(2)(vit) 2. OTIER (Spectfr in )
                                                -   N.405(e)(1)(1ft)       go.73(e)(t)(1)        -    30.73 (e)(2)(W)(A)          teles ses to Test.

l 5 - N.405(a)(1)(tv) . 30.73(a)(2)(ft) - 50.73 (a)(2)(W )(S) 20.405falf11fv) EfL71f alf fif ttt) En 71 f aif str )

                         .                         LICEBSEE CSETAET BANE                                                                                        TELEPoget utsett                   .

SEEFT SUp5RINTEIBEIPr 2 ,1, 5 3,2 ,7 ,1, 2 ,0 ,0, l Y 1 SUPPLDENTAL EPORT EIPECTED (14) EWECfD

                                                                                                                                      'E      I"     

(if yes. caelete EXPECTED M5 SIN j 1 TES SUOMIS$10N DATE) y 30 SRTE (15) l l t

                ,             ABSTRACT (Lielt to 1400 spaces, t.e., approminately fifteen stagle-space typewritten Itses) (IS)

His report is to satisfy the 8 hour writtee aussary resquiremset for a closeest of as Alert. Site Bestgeoey or senere1 Energency, in accordance with EUREC 0654 Appendis 1. and the 24 hour written summaary requirement following closecut of an Onusual Event.

           ,                                    Item 17 of this report le a brief descriptise of the sleesset of the event. If applicable, a tat will follow to the reagstred time                                                            ,

frame. I I l l t I I m 2m-m -mwoh ,-r- _-

                                                                                                                                    .........w.....__-.m.a...._..--.                                                                i l..-                                                                                                                                                   EP-106, R2v. 5                               ,
                      .                ...-                                                                                                                                                  Page 6 of 6                            l a

VAW/JLP/rgs i k Pact 2 or 2 R C 55 CLOSEOUT / DE-ESCALATION MPORT '

                                                  ,                                                                                                                                                            ~

arrENDIX Pf06-1 TIIT cuerrisuATIon

                                         -r                                                                                DOCET apStn (2)                                                       m             y FN:fLITT aNE (1) 05:00,0,,i                                                          ,           y     9 TEXT

( . I i I VERIFICATI0H Or NRC REGIPT OF REPORT DATE: VERIFIED El:

  -__.____,,,_.-_.,-__,,__..-__.__m._.                             _ , . - , . _ _ , , _ _ . . . _ , , . , , , _ _ . ,               ~ . , , , . _ _ . _ . . . , , , ,..__..-v       _.-m,      ,,___,..-_,_,y     .,, ,..-_,,-_, _

i .

  ..l;   . : l,. L :..:... . > .!+  .. ...        .               , , . .-
          -l      .

EP-110, Rev. 7 3865136340 Page 1 of 8 VAW/JPL/mgd n i \

~ &)                                           uMILaDELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATICN EMERGENCY PLAN IMPLEMENTING PROCEDURE ggh
 \

FP-110 PERSONNEL ASSEMBLY AND ACCOUNTABILITY f 1.0 PARTICIPANTS 1.1 Site Personnel shall report to their Emergency h Assembly Areas or as otherwise directed. 1.2 Emergency Assembly Area Coordinator shall perform an accountability check of personnel at their assembly area. 1.3 Bechtel and Subcontractor Personnel shall assemble and account for their personnel in accordance with Bechtel procedures. 1.4 Security shall' assemble a list of unaccounted personnel for the Security Team Leader and ~ Emergency Director.

% 1.5 Emergency Director shall direct the Personnel Safety Team Leader to activat'e the Search and Rescue /First Aid Group in order to locate unaccounted for personnel.

2.0 ACTIONS - IMMEDIATE THESE ACTIONS WILL IMMEDIATELY FOLLOW THE ASSEMBLY ANNOUNCEMENT MADE IN ACCORDANCE WITH ANY OF THE FOLLOWING: EP-103 - Alert Response EP-104 - Site Emergency Response EP-105 - General Emergency Respons . put 7.k / b

                                                                           . c)% h;}lt,j ,k p, I,h   [r,e EP-305 - Site Evacuation 2.1            For emergency assembly WITHO              $                 ity check:

ac(h [ kn ,f 2.1.1 Designated Emergency Response person e.1,shsf , mbl ah (iq4e'.1-reporttotheirassignedap[yjj)y Appendix EP-110-1). ( ,It ~ [v , l 2.1.2 Other personnel shall remain at their normal positions until receiving further instructions.

 '.. ;   .. i. .~.: .. i .:. ..;; ..: -. ' ;1
                                                  .c;.    .. r    . . . . . .. . . , . . . . -                                       , . _ . _, .. u . . .a ,; -
       . 1 *-
  • EP-110, Rev. 7 Page 2 of 8 VAW/JPL/mgd 2.2 For emergency assembly WITH accountability check:

2.2.1 Unit 1 personnel shall report to their designated Emergency Assembly Area (see Appendix EP-110-1). If not assigned to an Emergency

  • Assembly Area, exit the Protected Area, and report to the Personnel Processing Center.

2.2.2 Personnel escorting visitors shall: A. Escort visitors to Administration Building Guard Station B. Report to their Emergency Assembly Area (see Appendix EP-110-1) or, if not assigned to an Emergency Assembly Area, exit the Protected Area, and report to the Personnel Processing Center. 2.3 Emergency Assembly Area Coordinators shall: 2.3.1 For Assembly without an accountability check:

   /\                                          A. Maintain a log of names and badge numbers of

' {.kj s all personnel leaving and returning to assembly areas. 2.3.2 For Assembly with an accountability check: l A. Record names and security badge numbers of all individuals reporting to the assembly

area.

Conduct a roll call (if necessary) to verify an accurate listing of personnel. B. Report names of accounted for personnel to Security when contacted. C. Maintain a log of names and badge numbers of all personnel leaving and returning to assembly areas. D. If the entire group of assembled personnel are to move to a new location, perform steps

  • A through C to ensure that accountability is maintained.

2.4 Security Personnel shall:

          )                  2.4.1               For Assembly with Accountability:

A. Report to the appropriate personnel exit areas.

                                                                    ,   . _ , ,           s
                    ,s..
                             ,j / ., ,a , 3 , ,. c_ . . , , . , .
   ,.      ......a. ;..
                        ....7..: n . L. n . =. t .                  ..a      . . .. , .c 1 x .a : , . ....-.L...:............
                 'l ' ' '
             .                                                                                              iEP-110, Rav. 7 Page 3 of 8 VAW/JPL/mgd cff B. Ensure that personnel exiting'the Protected Area follow the normal " Card-Out" procedure and utilize the portal monitors while exiting.

C. If the COMPUTER is NOT operating: '

l. Obtain a copy of the Master Badge List.
2. - Collect the badges of all existing i personnal. Using the Master Badge List, check OFF the numbers of all the collected badges and those not in use at the time of the evacuation.
3. Give the completed Master Badge List to
 ,                                                                       the Accountability Group Leader as         -

quickly as possible. 2.4.2 For Site Evacuation: A. Report to tihe appropriate personnel exit areas and' set out buckets or other - containers to collect security badges. .

         .                                                 B. Have exiting personnel deposit their security badges and dosimetry in the appropriate containers, and utilize the portal monitors.

IF PORTAL MONITORS ALARM, PERSONNEL SHOULD BE INSTRUCTED TO REPORT TO THE VEHICLE AND EVACUEE CONTROL GROUP LEADER AT OFFSITE l ASSEMBLY AREAS. Emergency workers may be required to retain l dosimetry. Prior arrangements should be l made through Security Team Leader. C. If the Security Computer System M operable, l badges will be carded out by security using the exit lane card readers. , D. If the Security Computer System is NOT operable, perform the steps detaile H n 2.4.1 of this procedure. ) 2.5 Accountability Group shall: 2.5.1 For Assembly with Accountabilit': y A. Report to the Administration Guard Station. l B. Contact the Emergency Assembly Area ' Coordinators for accountability reports l - . _ - - .

ll'.

   ='                    '

s, . 4 .g s y, . .

  . . .    :.         e .k .*.u2..s :<: - . u . r ;,VL . . ..u.: . . + .                                 :  ::-..:... . : .. . . - ..: .  . c .- .: .: - *   . . . .

l EP-110, Rev. 7 . Page 4 of 8 VAW/JPL/mgd 4 ("O - utilizing Appendix EP-110-1, Emergency Assembly Areas. C. Compile a list of personnel in the Protected Area using information received from the Emergency Assembly Area Coordinators and the , Security Computer System.

,                                                                                           IF THE SECURITY COMPUTER IS NOT OPERABLE, PLANT SECURITY WILL PROVIDE A MASTER BADGE LIST WITH ALL BADGES TURNED IN AND BADGES NOT IN USE CHECKED OFF.

D. Compare the list of personnel remaining in 1 the Protected Area with the Emergency . Assembly Area Coordinators accountability reports to compile a list of unaccounted for personnel. E. Within 30 minutes from the time of the evacuation'and assembly announcement, report the accountability STATUS and the names of . the unaccounted for personnel to the Security Team Leader. -

        .O.                                                                      .       F. Contact the Bechtel Command Posts at the North Parking Lot to determine if any

, Bechtel or subcontractor personnel are unaccounted for and inform the Security Team Leader.

G. As unaccounted for personnel are located,
,                                                                                           immediately provide an update of the

! accountability STATUS to the Security Team i Leader. 2.5.2 For Site Evacuation: j A. Report to the Administration Guard Station. ! B. If the Security Computer is NOT operating, obtain the Master Badge List. !' C. Complete steps 2.1.5.1 B through G of this procedure. 2.6 Security Team Leader shall: 2.1.6.1 Report the names of unaccounted for personnel to the Emergency Director. , a l\ ' 2.6.2 Forward a list of unaccounted for personnel to l the Personnel Safety Team Leader at the l following locations:

.1;.;

               ^
                         'of..' - ll .,: . i, \. ., )0
                                                                                                                                                    ~I" j        .

I.' . ... : . .q' . n' 2 s ;, * . . . *:. .* t'. . * ! %'s:. . .. . :L . r:..N n .u.

                                                                                     f
                                                                                                                                    ' ~ - a: s                 .-. *. a.             L. L a .
                  ,l                                                                                                                  EP-110, Rev. 7                                                           .

Page 5 of 8 VAW/JPL/mgd A. Operations Support Center (If Technical Support Center is not activated). B. Technical Support Center (If Technical Support Center is activated). . o 2.1.6.3 As unaccounted for personnel are located, immediately provide an update of the accountability status to the Emergency Director and Personnel Safety Team Leader, j 3.0 ACTIONS - FOLLOW-UP

3. 1 Emergency Director shall:
                                                      .3.1.1          Contact the Personnel Safety Team Leader to

, activate the Search and Rescue Group /First Aid if required to. locate unaccounted for personnel. 3.1.2 Contact the Personnel Safety Team Leader for status updates. , L 4.0 APPENDICES 4.1 EP-110-1, Emergency Assembly Areas I 5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide the steps necessary for personnel assembly and accountability. 5.2 Criteria for Use 5.2.1 This procedure should be implemented wher.ever an i Alert, Site Emergency, General Emergency, or Site Evacuation is declared. 5.2.2 This procedure may also be implemented when an

Unusual Event is declared at the discretion of l the Emergency Director.

() 5.2.3 This procedure does not apply to Unit 2 Bechtel and subcontractor personnel since they will be assembled and accounted for per Bechtel f Evacuation Procedures. i P

      ..-,~~.;---------,,.---,-.-._.____.----ma.-,--,                                           - - . . ,-- - , - - - ._-                _nn,,vn,,-,,.--- ,- _ _.-                                n     _m-,,-
                      ..               ..       _         - . . .    . .              -- . . ._  .- .                     -          . ..- . .. ._           .      .       ~          -.
                                                                             ~
         . . , ,                          .-           . .:                                                    .            .      .        .              ~
                                                                                                                                                  '*'az.~'

l ;,. . , :.a,..7 '.' t: :. ? ' : ~.. . .h - - ' - - - - -

                                                                                                                                                               .,:,. : . . . a .L: .
                 .l EP-110, Rev. 7 Page 6 of 8 VAW/JPL/mgd

(. - 5.3 Special Equipment l 1 None 5.4 References 4 5.4.1 Limerick Generating Station Emergency Plan , i e I i 9 e n I i J ( l 1 t r i

   - . ~ . . . - - . _ _ . _ _ ~ . . ~                                           .-             . . . . - . _ . . _ . .                       _. - ..                   . _ - , _ _       ..-

4 l EP-110 Rev. 7 j Page 7 of 8

      ,-f                                                                                                                                                        VAW/JPL/mgd i      '.

j l APPENDIX EP-110-1 ! EMERGENCY ASSEMBLY AREAS k  : I I PRIMARY ASSEMBLY AREAS ALTERNATI: ASSEMBLY AREAS I ,1 GROUP AND TELEPHONE NUMBERS AND TELEPHONE NUMBERS ASSEMBLY AREA COORDINATOR (S) l ') l Technical Support Technical Support Note 3 Personnel Safety Team I i Center Staff: Center Control

  • Room Leader l .._

l Display Area _ Ext. Beige Phone - Ext. Maint2 o, l or Station Ext. Ext._ v HP Technicians (4) Operations Senior HP TA/

        )                                                                                     See Note r Support Center                                     MRF Room, Ext.                        Technician n,              Station Phone -                                  M _Maint. Shop,
         ,      .                          Ext                       or                       Ext.

W nt Operators (4) Operhtschs Support See Note'l Senior Ranking

aurf.11ary Plant Center MRF Room, Ext @ P.O., A.P.O., or A.O.

! :pe cors Station Phone - h Maint. Shop, l i Ext. - Ext. ! i &::trity Guards Admin Guard Station (CAS) TSC Guard Station - Senior Ranking B n Phone - Ext. g Security Person Notes: [

      ,'           (1) If the OSC becomes or.is uninhabitable, the OSC Coordinator, Plant' Survey Group Leader and up to l                        5 HP Technicians and 5 Operators report to the MRF Room in the Control Room.                                               All others report                i j , ., .

to the Maintenance Shop. j . l (2) If accountability is required they will leave the Protected Area. Otherwise, they will receive j further instructions and directions.

     .E    -

(3) If the TSC becomes or is uninhabitable, the Emergency Director, Personnel Safet:r Team Leader, j f. Technical Support Group Leader and up to 5 others designated by the Emergency D;, rector report to i j , the Control Room. All others report to the Maintenance Shop. ! s .

'h. (4) The auxiliary OSC on Elevation 239' may be used to hold excess personnel; however, the OSC on mbly area.

] Wievation 269' is the as .)

l EP-110 Rev. 7 Page 8 of 8 {  ; , VAW/JPL/agd 1 .

   ~ .'

r ,' i PRIMARY ASSEMBLY AREAS ALTERNATE ASSEMBLY AREAS

    ~

4 GROUP AND TELEPHONE NUMBERS AND TELEPHONE NUMBERS ASSEMBLY AREA COORDINATOR (S) Control Operators Control Room Safe Shutdown Panels Shift Superintendent Asst. Control Stati one - For Un and 2 Alt Shift Supervisot-I l Operators Ext. Ext. ! j, Shift Supervision (Only 1 trol Room i STA uninhabitable) l Cheuistry Chemistry Pield Office Chemistry Admin Office Chemist l Technicians Stati e- Stat' ne , Ext. Ext. 8 Instrument & Control Maintenance Shop Personnel Processing Senior Person Present l Technicians & Brown Phone Center _ j i PECO Pield Engineers Ext. Ext. 4 . Escorted Plant See Note 2 - G Visitors Administrative See Note 2 Staff and Unescorted ) 'l

      .                 Visitors Bechtel or              See Note 2

{

  • Supervisors

, Subcontractors

    ',                  in Restricted i                 Area l Maintenance Personnel Maintenance Shop                Personnel Pr         ing  Senior Person Present Brown Phone -              Center, Ext                                             "

Ext. [., i - Notes: ) . j , (2) If accountability is required they will leave the Protected Area and assemble at the Personnel 1 Processing Center. Otherwise, they will receive further instructions and directions. ,i 'l l 2- . ! g- - ! q' . .

  .
  • h Q  %
                                        ~

l ',- 3865136350 EP-120 Rev. 4 Page 1 of 4

   ,- l                                                                                                 MJM/mc

{ [\J PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE gl  ; EP-120 SITE EMERGENCY COORDINATOR 1.0 PARTICIPANTS 1.1 Site Emergency Coordinator shall supervise the

                                                                       ~

activation and manage the activities of the Emergency Operations Facility. 2.0 ACTIONS-IMMEDIATE 2.1 Site Emergency Coordinator shall direct the Load Dispatcher to activate the Site Emergency Coordinator's call list. 2.2 Site Emergency Coordinator for Site and General emergencies shall:

   '                    2.2.1       Proceed to the Emergency Operations Facility.

2.2.2 Become cognizant of the situation directly from the2 Emergency Director. 2.2.3 Announce to EOF personnel that he is assuming the role of Site Emergency Coordinator and inform the Emergency Director that he is assuming control of the emergency response organization. 2.2.4 Supervise the activation of the EOF. 2.3 Site Emergency Coordinator shall as appropriate request the collection of environmenta n samples per EP-C-315, if there I,e radioactive material rele g, c,

                                                                    ,e      %.. s - ,np ,

2.4 Through the Dose Iss sh 'pe'imm Leaderg direct all radiation surveys co t In off,sitie. areas. When field data becom availpbTd relationship of field data toicalcu,"didebss thew latAl data Dose Assessment Team Leader andlilealth Ph sic $.,Mh d ChemistryCoordinatorinordertoresolk&{ gyp.k discrepancies. tt}, (3'} yn-'{ %-l 0 - O lW*

        .. ' . .           . .,;.....:                      - .. . . . .           .      . . .            .       . . . . /. .a #  . ..n       a..; ' . .. ..   .

l

  • EP-120 Rev. 4 Page 2 of 4
    'l                                                                                                                                           MJM/mc
    /
      ~'                        2.5               Request activation of corporate support functions through dialogue with the Emergency Support Officer.

2.6 Obtain protective action recommendations from the Dose Assessment Team Leader or consider recommendations based on plant status as indicated by Appendix EP-317-4. 2.6.1 Discuss recommendations with the Emergency Director and Emergency Su,7 port Officer to assure that all parties are informed of the recommendations before they are made to government authorities. 2.6.2 Meet with the Commonwealth of Pennsylvania representatives in the Emergency Operations Facility to ensure that questions on protective actions to be applied are answered prior to formal recommendation. 2.6.3 Provide protective action recommendations to Pennsylvania Bureau of Radiation Protection in accordance with EP-317, Determination of Protective Action Recommendations. 2.6.4 Update these recommendations as new data become available or conditions change. 2.7 Upon completion of EP-318, Liquid Release Dose Calculations for Drinking Water, implement EP-287, if necessary. 3.0 ACTIONS - FOLLOW-UP 3.1 Site Emergency Coordinator i; responsible for the following: 3.1.1 Maintaining awareness of plant status and being alert to potential off-site consequences of the emergency. 3.1.2 Conducting periodic briefings for Emergency Operations Facility personnel. O y_. .a _3.-,.~+...co+.... .. re ..w..a..., - e%,.- . - .e. o.u. . e . ..o4 - . . . . , , - . . -.o r..r. . . . . ,-.s .

                                                                                                                                         .                . s
      .J. ..?
 . .                                 .  .w. .M r , a . .         ........a.~....~-.~                   ...---     u- - a ..k. - i.' ; ~ = ~ a . . . .* -       . . . .
     '1                       ,                                                                                                 EP-120 Rev. 4 Page 3 of 4                        -

MJM/mc (O l 3.1.3 Coordinating between the on-site emergency personnel and the off-site emergency personnel, when activated, to obtain necessary additional facilities, equipment, supplies, personnel, or technical services. , 3.1.4 Coordinating with the Emergency Support Officer concerning personnel, equipment, and materials expected to arrive at the plant site. 3.1.5 Ensuring preparations are made for check-in of

                                                                 . incoming personnel, especially with regard to site area access control, indoctrination of visiting personnel, maintenance of proper security, issuing dosimeters and preparing exposure records, and distribution of protective clothing and equipment.

3.1.6 Providing management direction for the establishment and functioning of the Emergency t Support Center. 3 . l' . 7 Continuing to. supervise the operation of the Emergency Operations Facility. , 3.1.8 Reviewing with the Emergency Director the current (O status of inforniation prcvided to governmental agencies and relieving the Emergency Director of this responsibility. The Site Emergency i Coordinator will then serve as the primary contact for Federal, State, and local emergency response agencies which dispatch personnel to the plant vicinity, and will provide status and assessment i information to governmental agencies. 3.1.9 Provide direction for Philadelphia Electric emergency response personnel who are dispatched to the plant site and for support personnel activated by Philadelphia Electric Company. 3.1.10 Keeping the Emergency Support Officer and the ! Emergency Director apprised of actions taken and of l consequences off-site. 3.1.11 Coordinating with the Emergency Director and the Emergency Support Officer to determine when to terminate the initial phase and enter the raccvery phase, informing various agencies and organizations when the modification is to be implemented. O f ( i l 1 l _ _ _ _ _ _ _ _ _ _ _ _ , _ . - _ , _ _ _ . . . _ _ . _ . . . _ , _ . _ . ._ _ . _ . _ _ _ . . _ _._._.___._,.J

                   ..}L ;,E d ,A !.. a .
                                                      /        , ..                     .. ..
..b,,...cj.

1

                   .l EF-120 Rsv. 4 Page 4 of 4 I

l MJM/mc 4.0 APPENDICES None i 5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide guidelines to delineate the responsibilities and actions of the Site Emergency Coordinator. 5.2 Criteria For Use The position of Site Emergency Coordinator is normally activated at a Site or General Emergency or at the discretion of the Emergency Director. 5.3 Special Eculpment None . 5.4 References -

               .                                $.4.1                   EP-203, Emergency Operations Facility (EOF)

Activation 5.4.2 EP-307, Reception and Orientation of Support Personnel 5.4.3 EP-317, Determination of Protective Action Recommendations 5.4.4 EP-287, Nearby Public and Industrial Users of Downstream Water , 5.4.5 EP-C-218, Health Physics and Chemistry Coordinator 5.4.6 EP-C-315, Recovery of Emergency Radiological Environmental Monitoring Samples from Peach Bottom Units 2 and 3 and Limerick Units 1 and 2

l. ,5.4.7 EP-210, Dose Assessment Team i

( l l .

                                                                                           . . , . . . . . . .. a. . . . ; . :. ~ . . . . c
       .t.'> w .n w....            -   .1. .   ..   .              - . . .   . . . . .   .       ..                                          .
                         ~
  "*l,            '.                                         ,,.,
                                                                . j j jf336()                    EP-277, Rev. 10                                     !

Page 1 of 5 ' MJR/jek

                                                                                                                    ., f l

i(iO PHILADELPHIA ELECTRIC COMPANY q ,- LIMERICI GENERATING STATION ONW EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-277 PERSONNEL SAFETY TEAM PHONE LIST 1.0 PARTICIPANTS l.1 Personnel Safety Team Leader calls in Group i Leaders. 1.2 Plant Survey Group Leader calls the Health Physics (HP) Unit Technical Assistant and the HP senior Technicians. 1.3 Health Physics (HP? Senior Technicians calls the HP technicians assj,gned to their shift. NOTE: THE AREA CODE IS g UNLESS OTHERWISE SPECIFIED. b 2.0 ACTIONS-IMMEDIATE 2.1 Personnel Safety Team Leader: 1 Name Home Work e) 1 ternate).

2. l~.1 Personnel Safety Team Leader shall call people from the following list until appropriate group leader positions are filled.

l 2.1.2 Plant Survey Group Leader i { , Name . .. 5# l 9-n a ernate) alternate) g' i' '.'"t-l f'* 3

                                                                                                                .q -g Qf,)1 \,NM
=             ___                        -                _                -               _ _ _

c _

n . d. ii g . ' . = . . . ' , . . -

                                                                                                                                                             .~.. . . -
   .         . .                   .                   <.        . , . . . . . - . . .      . . . . .        .c . . :i. .:. ..u ..; - : . .:. .. : . t . '
 ~~

l-EP-277, Rev. 10 ' Page 2 of 5 . ~' MJR/jek

                                                                                                                                                                            . E _. . .'

((' 2.1.3 Personnel Dosimetry, Bioassay, and Respiratory Protection Group Leader Name Home Work' I 2.1.4 Vehicle and Evacuee Control Group Leader  ; ! Name Home Work

                                                                         )

2.2 Plant Survey Group Leader shall call the Health l Physics Unit Technical Assistant and the Health . Physics Sr. Technicians: l l Name Home Work '(w 'i

                                                                      )

mu*

r. Tech) ammans ,

l I O shpunk M ano M

                                                                                                                                           ===

2.3 Health Physics Sr. Technicians shall call the individuals on their shift and instruct them to report to the OSC (unless an alternate area is designated by The Personnel Safety Team Leader)as follows: e.O

            , .. . . u:: w .. . .. :. . -.:....
                                                                                                    . .: . . :n .aw.
                                                                                                                            " e. :.<-
                                                                 . . . . . a:   . . . . ~ . . < ..                                     a . : i e.       ._..a . . < . .

, **l' . . EP-277, Rev. 10 Page 3 of 5 4 MJR/jek .'(! NOTE THE FOLLOWING SHIFTS ARE THOSE IN EFFECT ON 11/14/85. AS CHANGES OCCUR, THE SR. TECHNICIANS SHOULD CALL THOSE PERSONNEL ASSIGNED TO THEIR SHIFT AT THAT TIKE. i 2.3.1 Name Home Work I i l l

l I

1 l l

                                                                           .                                                                                                 1

(( 2.3.2 Name Home Work i l l l l I l l 1 I l l l l l i s. i I l

                                                                                                                             * ^
' .: isj.t :. .. .. . .
                                                             . . . . . . . . .. .  -. . . , .    .....'...  .. . . . . . . .        . . . :: . . ..,.; w : ;, _. _ . _ .

l* . '.' EP-277, Rev. 10 ! Page 4 of S j MJR/jek ( 2.3.3 Name Home Work I. N 3.0 ACTIONS-FOLLOW-UP 3.1 None required

'c0
                                                                                              =

l 4.0 APPENDICES l None l 5.0 SUPPORTING INFORMATION l 5.1 Purpose i The purpose of this procedure is to provide guidelines and information to call in Fersonnel Safety Team Members. 5.2 Criteria for Use This procedure can be used when the Personnel , i Safety Team is activated or when additional l people are needed. - - 1

        <p
  -n,m-e-,
            ..                      _ . - -       .- ..._ - _.-. . - - .                -- .- _ . ~...                          .._ . . _._..- _ .... - . . _ _ _ - _ .- - --- . _ _ _ _ - _ _ _ - _ _ _ -
             ,.p.          *    . *                           .   ;          *.   , *                            *                        .                             '           '
                                                                                                                                                                                                   ' *            *,               .. .s
s. .. . . A_ , ._ ;
      . . . .., .r. e. l.;.c., ,:...                     .              ... .    .=   .........:                        .   . . .                -.-..,.. . ..- -.                                   . .                          s. ..:. .. ,.
               *l* . .       .                                                                                                                                                                      EP-277, Rev. 10 Page 5 of 5                              ,

d . MJR/jek i l(( 5.3 Special Equipment None 5.4 References None 4 e i h i 1 J l. l f 4 e

  • P e

(~  : i l 1 i d 4 I l 1 i i 4 4 e

\

f J 1 1 l I 4 rw m - -e .-e,w.w,-re-y.- , _.-=rw--p. - ~y-_ _w -w-

i.-d . . . . . . . . . . ' . ' *

  ; s <.:                           '
                                                    ...a.           . .: . .....-.......;                              . . . . . :.L. .. .. n?..:;.:- * *L. . , . . .     .    ,.

l, EP-282 Rev. 7

                            "                                                                                                                         "'S*

3865136370 MR* %gl 4

   .O                                                   PHILADELPHIA ELECTRIC COMPANY
( LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-282 GOVERNMENT AND EMERGENCY MANAGEMENT AGENCIES PHONE LIST 1.0 PARTICIPANTS

, 1.1 Emergency Director or the Site Emergency Coordinator shall be responsible for the decision to implemeiit this procedure.

.                                 1.2               Communicator notifies the required agencies.

2.0 ACTIONS - IMMEDIATE l 2.1 Communicator shall be directed to contact l appropriate agencies by the Emergency Director or Site Emergency Coordinator using the following

;                                                   list..  ,

Address Phone ( 2.1.1 U. S. Nuclear l

;                                                   Regulatory                                                                                                                          l Commission                                                                                                     quar ers Region I                                                                                                                '

J Office of

Inspection  ;

and Enforcement i 1 cle r eactor i egulation 1 l 2.1.3 Dept. of Energy I S \

                .                 2.1.4             Environmental                                                                                                                      l Protection                                                                                                                         !

Agency gr after ,

                                                                                                                                                     -{k g 0 % \!                                                           ,

4 i i I ) l

   ; /s. .' ..,. ...          . . . . . . . .   . . .
                                                                                                                                                     ... ;.b ;., .: . : .' .'. ,. a 1. . ..    ._

! l** EP-282 Rev. 7 Page 2 of 4 MJR/rgs ~ i (O Address Phone '5-I l 2.1.5 Department of Transportation (Coas uar 3rd U.S. Coast Operations Div. j Guard District (24 hrs.) f)

Boating Safety l Div.

1

2.1.6 Department of Dept of i Agriculture Agriculture Chief, Division Bureau of Food 2.1.7 Pennsylvania Room B-151 l l Emergency . Transportation hours) I

! Management . 4 i I r l ~ , l (g Duty Officer i ) l 2.1.8 Department of l Environmental l Resources ater y Management l i 2.1.8.1 Office of Business Info.) Public , l Information t 1 i' i l Deputy Secretary i 2.1.8.2 Regional Office h O  !

i 0,7 :cs/f '.Jf,' ,,,p , I', [? .'I],', } [

                                                                                            ,, , ' . ,,.,[, ,
       .l..,

EP-282 Rev. 7 Page 3 of 4 6-MJR/rtjs '!'((' Address Phone J l 2.1.9 Bureau of j Radiation i Protection, After 4 m ) Dept. of - l Env. Resources van a l , Emergency Management Agency l 2.1.9.1 Personnel & i Home Phones ( j 2.1.10 Pennsylvania State Health ' i Center l . . I 2.1.11 State Police - ! Barracks (Limerick) ) {l% 2.1.12 Emergency Emer. in 4 l Planning Agency i ' l 2.1.13 New Jersey Office of , l Emergency Management Ext. or j Agency { Ext. i l 2.1.14 Maryland Emergency i Management and Civil Defense Agency l 2.1.15 Montgomery County Office of E=crgency Preparedness - o Dept. of Emergency Services ((O l

o . .:',: <: j. ,;.:.

         .                   . . .     . . O. . .     . . . .        ..        . . - . . .
                                                                                              . + . .    :. m .: ?.:.. .      ? .. , u. *.. a, .. -
      .     ,  l, *, , ,, .                                                                                               EP-282 Rev. 7 Page 4 of 4            ,

MJR/rgs . ( Address Phone

 . (;

2.1.17 Berks County Communications Dept. of De . Emergency i Services 1 Defense ne 3.0 ACTIONS - FOLLOW-UP None - 4.0 A'PENDICES P None l 5.0 SUPPORTING INFORMATION 5.1 Purpos'e

s. The purpose of this procedure is to supply pertinent information to government and emergency management agencies.

5.2 Criteria for Use This procedure may be uced when a government or l emergency management agency must be contacted. 5.3 Special Equipment None 5.4 References l .None l l { l (O l l l ..-.- .--- -,,,. _ , _ , . _ _ _, , _ _ , . - - _ - - ,

  ...   :e :.. n ..
             .         . ..... . .=    :. .       . ..: .   ... .  . . . .    .     . . . ,.. . : : x... .:. =: .

1

 .*,. I 3865136380              EP-284 Rev. 7 Page 1 of 3             ,

MJR/mc f( PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION O 27 EMERGENCY PLAN IMPLEllENTING PROCEDURE EP-284 COMPANY CONSULTANTS AND CONTRACTORS PHONE LIST 1.0 PARTICIPANTS 1.1 Communicator shall be responsible to contact contractor or consultants as their services are needed until Headquarters Emergency Support Center is activated and can assume this responsibility. 2.0 ACTIONS-IMMEDIATE 2.1 Communicator shall contact the needed contractor or consultant by using.the following list until the Headquarters Emergency Support Center assumes responsibilities. Address Phone 2.2 General Electric Working Hours: Company, Manager of Operations Emergency Engineering Support Program Off Hours: Answering Service for immediate call back from GE Address Phone 2.3 Radiation . Management Consultants

                                                                  )

v', c

                                                                            .     ,: 1 49 o                                                                   esfg#

l .. EP-284 Rev. 7

             -     l
  • Page 2 of 3 l MJR/mc 1

(( 2.4 , I On Site i Services) also: i e.e-- On Site . 2.5 Institute of Nuclear Power Operations M)(24 hrs. Eme nc (INPO) ( ness 2.6 Babcock and Emer(ency  ; Wilcox . Control Lynchburg 24506-1165' Of icer I Research Ctr.. . Work I s l l ernate  ! i Work aussa 2.7 Bechtel Power Corporation , r I ! 3.0 ACTIONS-FOLLOWUP ' ! 3.1 None required.

                     .0          APPENDICES l          '

None. l l 'l l

 .~.m.
         ..    . .t     .          .             . . . . . . . . ..       .            . ... , .            a..          . , .    .....e          . .          .. .

l

                  ..                                                                                                 EP-284 Rev. 7
                                                                                                                    ' Page 3 of 3 MJR/mc
             )
 '( (.      5.0               SUPPORTING INFORMATION 5.1   Purpose The purpose of this procedure is to provide information to contact PECO consultants and                                                                                                .

contractors. . 5.2 Criteria for Use . This proccdure may be used when it is necessary to contact a company consultant or contractor.  : Requests for consultants or contractors shall be approved by the Site Emergency Coordinator or Emergency Director. 5.3 Special Equipment None. 5.4 References - None. ,

(. '%

l t ,1 1 a e

                                                                                                   .O                                       b l-
                                                                                                     +                             ,

I /a e' i i I

   . . s' .y. Jo & '. < . . .      ..~..".    .     .         ....:.. ....:..                 ..--.e.       .. % .u ~. >.'...... * .-Y . l. . " . * .    .
             $'-                                                                3865136390                                    "' = P;; ;                        .

VAW/ MPG /rgs s Ip lI PHILADELPHIA ELECTRIC, COMPANY LIMERICK GENERATING STATION hOC7 EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-287 N_EARBY PUBLIC AND INDUSTRIAL USERS OF DOWNSTREAM MATER CAUTION

           .                             Ensure that the Pennsylvania Department of Environmental Resources has concurred with notification of downstream water users by PECO.

1.0 PARTICIPANTS 1.1 Pennsylvania Department of Environmental Resources shall be responsible for the notification of the . downstream domestic water users, unless specifically delegated'to PECO. 1.2 Emergency Director ot* Site Emergency Coordinator shall direct the implementation of this procedure. 1.3 Communicator, when directed by the Emergency Director or Site Emergency Coordinator, shall be responsible to contact the downstream users. 2.0 ACTIONS IMMEDIATE 2.1 Communicator shall contact the downstr sing the list in section 2.2 and infor information listed below: l 2.1.1 There has been a radioac 'l t[3 into the river. 6" . ,y}i j 2.1.2 Estimated Transit Time to eir in 'af .# Ior k l companies only). ti M 2.1.3 Suggest that they close their intake (if t J further notice. g '. \,

  • ESTIMATED TRANSIT TIME FOR WAT MPANIES CAN BE OBTAINED FROM EP-312, RADIOACTIVE LIQUID RELEASE.
                 /                                    - _ _ _                   - _ _ _ _ _ - _ . _ ._. .                                                         _
     - . .               ...           ..w       ..                -.    .- . ..       . . . . , . . . . . .   . . , . . .                 . .    ..
                       ~                                                                                             .
   ,                .l , ' . ; ' , .                                                                                        EP-287, Rev. 4
        .                                                                                                                                  Page 2 of 4 VAW/ MPG /rgs               <

.(( O 2.2 Downdtream Users

                                    ~2.2.1  Citizens Utility Home Water Co.

2.2.2 Philadelphia Electric Co. ' Cromb nerating Station 2.2.3 Phila el hia suburban Water Co. , 2.2.4 Phoenixville Water Authority  ! 1 l 2.2.5 Lukens Stecl;Co. 2.2.6 Phoenix Steel Corp. 2.2.7 S nthane.- a lor Corp. A O 2.2.8 Nicolet Industries, Inc. 2.2.9 Co., (Norristown District) 2.2.10 Cit of Philadelphia Queen I.ane Plant l or Ext. M 2.2.11 City of Phil 1ph elmont Plant l or Ext. M 2.2.12 Container Corp. of America Philadelphia Plant, Mill Dr. 2.2.13 Connelly Container, Inc. lant cO l

           .._ ., ,                                                                                                    _ - , , - - - - - _               .-,.---r--- -

__ _ __ __ _ _ .. .__= __

                                                ~~-
        ,l , , ,. , .                                                                                                      EP-287, Rav. 4 Page 3 of 4             .

VAW/ MPG /rgs .

(,( 3.0 ACTIONS-FOLLOWUP 3.1 Communicator shall
  • 3.1.1 When the Emergency Director or Site Emergency .

Coordinator and Pennsylvania Department of Environmental Resources have determined that the concentration of radioactive material in the river is at or below acceptable levels, contact the downstream users and inform them of this information. 4.0 APPENDICES None 5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide information to contact downstream users of the Schuylkill River, i% 5.2 Criteria For Use 5.2.1 . Verify that EP-312, Radioactive Liquid Release has been completed. 5.2.2 Verify that Pennsylvania Department of Environmental Resources has concurred with the notification of the downstream domestic water users by PECO. 5.2.3 This procedure can be used when there has been a release to the Schuylkill River. i l l l O l l t

                         - m _. m                                    z_. .                                                        - - - -. m . m e m         -
     . . [' ', ', !;.
...,. . ....:.. . . . .- :. .,s  :~ .:. .J.r ...  :'j. ~. nl. . . . . . .

l..- EP-287,.Rev. 4 Page 4 of 4 ,- VAW/ MPG /rgs (1 5.3 Special Equipment None

5.4 REFERENCES

5.4.1 EP-312 Radioactive Liquid Release 4

   \

4

 -      w_,  --.. .- , _ . , - - . , , . . , , , . , - . , . ,          , . - . _ _ , . - . . . , .                 _n,,,___----.           .. , , _ . , . , . - . . _ _ . . . - - . - _ , , - . _ - - -                      - - _ , . _ . . . . . , - - , , .~_ , -

I i .- 3865136400 re; g P;; ; 1 MJR/mc PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING' STATION g l EMI.'RGENCY PLAN IMPLEMENTING PROCEDURE

                                                                     ,                            j EP-291        STATFING AUGMENTATION 1.0       PARTICIPANTS 1.1         Shift Clerk or other assigned person shall perform the following procedure.

2.0 ACTIONS - IMMEDIATE 2.l Shift Clerk or other assigned person shall: 2.1.1 Ask the Emergency Director what groups are to be activated for transaission to Team Leaders. Event Classification Groups to be activated - Personnel Safety Team Plant Survey 1st Aid / Search and rescue Vehicle and Evacuee Control Ddiai=thry; nie caci :. i Respiratory Protection Dose Assessment Team Dose Assessment group Field Survey Technical Support Team _ W8I% Security 'Thq , Access Control 4 } Kt% y_o Wr

                                                                           ..=>

Personnel Accoun bility%$,$t-8e7c y

       .l
  • EP-291 Rev. 9 Page 2 of 7 ItJR/mc Fire and Damage ,

Fire Fighting Damage Repair Chemistry Sampling and Analysis 2.1.2 Contact in sequence the personnel listed in Section 2.2. 2.1.3 Inform each person contacted of the event

                     ~

classification, that they are to respond to their assigned location and what groups under them are to be activated. If the person is unable to respond, go to the next person on the list. 2.1.4 Attempt to contact personnel who have pagers, by that method if they are known to be "on the page", or the phone is busy or'.there is no answer. 2.1.5 Inform Emergency Director of results including discrepancies. (.[y) 2.2 Personnel to be contacted are:

  ..           2.2.1       SHIFT I&C TECHNICIAN Communicator shall request that the TSC be activated.

(Shift I&C Technician ext. M or W I&C Technician Time By l l I l I l l l O

l I ' EP-291 Rev. 9 Page 3 of 7 MJR/mc . 2.2.2 EMERGENCY DIRECTOR l(I Disposition-Busy, . Time Called No Ans.-Contacted Called By l Supt.-Services i l 6 or tions , alWBB" 6  ; 2.2.3 OPERATIONS ENGINEER'.

                                               .             Disposition-Busy, Time Called No Ans.-Contacted                                           Called By erations Eng.

i l 2.2.4 MAINTENANCE SHIFT ASSISTANT FOREMAN i Extension or page. Communicator shall request the  ! l Maintenance Shift Assistant Foreman to call three 3 maintenance mechanics, preferably, one electrician and *

                                                                                                                                              )

l two machinists or fitters. I 1 Sub-foreman Time By , i 1

 ,O t

l l ,

            *
  • EP-291 Rev. 9 Page 4 of 7 MJR/mc 2.2.5 COMMUNICATORS (ONE per facility) l Communicator shall request TSC Communicator to implement l EP280 and EOF Communicator to implement EP279. Inform TSC Communicator if Emergency Director has been notified.

l Disposition-Busy, Time Called No Ans.-Contacted Called By Technical Support Center (TSC) Communicator I - EOF Communicator o or , 2.2.6 PERSONNEL SAFETY TEAM LEADER (ONE) Communicator shall request that the Team Leader call in

   ]                                Group Leaders and that the Group Leaders call in their groups.

Disposition-Busy, Time Called No Ans.-Contacted Called By Senior Health or aniis W a< W M

                                                                          ~

E 7.'n3LF*J%IET.IS.7 %7.~ M W.Ic K Uir3I*T I*E N ** "' '

EP-291 Rev. 9 Page 5 of 7 MJR/mc - I 2.2.7 DOSE ASSESSMENT TEAM LEADER (ONE)

I' Communicator shall request the Team Leader to call in team and the Field Survey Group Leader, and to report to the TSC or EOF as determined by Step 2.1. 4 Disposition-Busy, Time Called No Ans.-Contacted Called By Technical Support Haalth Physicist or M -

Prot. M 2.2.8 TECHNICAL SUPPORT TEAM LEADER (ONE) Communicator shall request call in of Technical Support Team Members. l Disposition-Busy, Time Called No Ans.-Contacted Called By M ineer l 2.2.9 CHEMISTRY SAMPLING and ANALYSIS TEAM LEADER (ONE) Communicator shall request call in of Chemistry Sampling and Analysis Team Members by Group Leader. Disposition-Busy,

                              .            Time Called  No Ans.-Contacted   Called By l    Chemist l                                 or ko

l . . EP-291 Rev. 9 Page 6 of 7 MJR/mc .

! 2.2.10' FIRE AND DAMAGE TEAM LEADER (ONE)

Communicator shall request the Team Leader to call the appropriate Group Leaders and have Group Leader call in Group Hembers. . Disposition-Busy, Time Called No Ans.-Contacted Called By aintenance A tant En ineer Maintenance Engineer 2.2.11 SECURITY TEAM LEADER (ONE) Communicator shall dequest the Team Leader to call appropriate Group Leaders and have Group Leaders call in

                                             ~

personnel.- In form Security Team Leader if EOF is to be j {s activated. I Disposition-Busy, l ime Called No Ans.-Contacted Called By aumme N  % rk)

    "                               W a

D ACTIONS-FOLLOW-UP 3.1 None Required. _ . ~ _ . . . . . .

4 l . EP-291 Rev. 9 Page 7 of 7 , MJR/mc

  !  O  .0          APPENDICES None.

5.0 SUPPORTING INFORMATION 5.1 Parpose The purpose of this procedure is to provide guidelines and information necessary to perform staff augmentation. 5.2 Criteria for Use This procedure shall be implemented at an Alert, a Site Emergency or a General Emergency or at the discretion of the Emergency Director. 5.3 Special Equipment None. , 5.4 References None. O 1 1

 .O e
      . l-                                                                                   EP-301, Rsv. 2                       l Page 1 of 3 3865136410                               VAW/ MPG /rgs          ,

l TN PHILADELPHIA ELECTRIC COMPANY LIMTRICK GENERATING STATION O 2[ EHERGENCY PLAN IMPLEMENTING PROCEDURE 1 f EP-301 OPERATING THE EVACUATION ALARM AND RIVER WARNING SYSTEM

1.0 PARTICIPANTS

1.1 Shift operation personnel calling the site evacuation operate those alarms. 2.0 ACTIONS-IMMEDIATE 2.1 Verify the following: 440v mcc ll4-B-R-C-17 is energized for River Warning System

                                                       ~

Emergency AC power from lighting panel 13L circuits 25 and 26. , 125v DC 1PP01-07 and IPPO4-05 are energized (f 2.2 TO ACTIVATE THE EVACUATION ALARM: 2.2.1 Set the " SIREN TONE GENERATOR" tone selector switch located on MCR Panel 00C650 to one of desired positions: 2.2.1.1 SIREN (harmonic tone) (Preferred) 2.2.1.2 PULSE (high pitched pulses) (Alternate) 2.2.1.3 STEADY (steady tone) (Alternate) 2.3 Set the " EVACUATION ALARM AND RIVER WARNING SELECT" switch located on MCR Panel 00C650 to o e desired positions and then push, g itch 2.3.1 la-CONT 1 - Sounds y

                                                                    ;0010 'pripary 9 .,

contal y e- % ; b Gifli.jtV 2.3.2 CONT 2 -SoundsalarminOpk,t["pr# nary containment only b d J' 2.3.3 PLANT ALARM - Sounds g alarm @ebNe p m ? . ,' Y 'mL- m.- e v,ge -- g s="r-r.v:w 3y~;~;~q-er mn ~, 3. . - - . =- *.~ -* -~ ~? * =, , .

                                                                                             ,        7, n ;~ r~ -- -'- * . ~

,- .l .. EP-301, Rsv. 2 Page 2 of 3 ' VAW/ MPG /rgs '( - EVACUATION ALARM OVERRIDES THE PA SYSTEM. 2.4 Sound the alarm for approximately 30 seconds. 2.5 Return the " EVACUATION ALARM AND RIVER WARNING SELECT" , switch located on MCR Panel 00C650 to the "OFF" position to silence the alarm. i 2.6 TO ACTIVATE THE RIVER WARNING SYSTEM: 2.6.1 Set the " EVACUATION ALARM AND RIVER WARNING SELECT" switch located on MCR Panel 00C650 to one of the

                                        . desired positions and push the selector switch in.

2.6.1.1 MIKE - To broadcast live, depress the

                                                               " RIVER BROADCAST MICROPHONE" pushbutton and proceed to give message.

2.6.1.2 TAPE - To broadcast pre-recorded message automatically. 2.6.2 Verify that the me'ssage is being broadcasted by observing response on the " RIVER BROADCAST SPEAKER VOLUME MONITOR" located on MCR Panel 00C650. l 3.0 ACTIONS-POLLOW-UP 3.1 Return the " EVACUATION ALARM AND RIVER WARNING SELECT" switch located on the MCR Panel 00C650 to the "OFF" position to end the broadcast. 4.0 APPENDICES None 5.0 SUPPORTING INFORMATION 5.1 Purpose l The purpose of this procedure is to describe how to operate the Evacuation Alarm and River Warning System. l l l l

    . . . . .            . . - ~ _ .                                                                       -
  .          l-                                                                            EP-301, Rev. 2 i
                      .                                                                       Page 3 of 3 VAW/ MPG /rgs I

5.2 Criteria for use ( 5.2.1 A site evacuation is ordered by the Emergency Director or Interim Emergency Director. 5.2.2 A test of the system is authorized. ' 5.3 Special Equipment None 5.4 References 5.4.1 Limerick Generating Station Emergency Plan 5.4.2 FSAR Section 9.5.2 5.4.3 E-1364 Wiring / Connection Diagram l Evacuation Alarm and River Warning Systems (>6 s

 -,,...-vn.,..,,.m.,...,,...,..,.,.--. urn,.n.~.--.,.......,.-....,...---.----,.----
                            =.5, l

6 - .

                                                                                                         \

l..' EP-304 Rev. 4 l

          .         .                              3865136420                      Page 1 of 3           i VAW/ MPG /rgs   ,

1 PHILADELPHIA ELECTRIC COMPANY i b LIMERICK GENERATING STATION h l EMERGENCY PLAN IMPLEMENTING PROCEDURE g{j l EP-304 PARTIAL PLANT EVACUATION 1.0 PARTICIPANTS - 1.1 Personnel in affected areas requiring evacuation shall evacuate the area and notify the control room. 1.2 Emergency Director or Shift Supervision shall direct the partial plant evacuation. 2.0 M TIONS - IMMEDIATE 2.1 Personnel in the affected area not directly [ involved in controlling the hazard shall: , 2.1.1 Evacuate to a safe area. 2.1.2 Notify the control room of the type and location of the hazard.

                      ,2 , 2         Emergency Director or Shift Supervision shall:

2.2.1 Upon receiving information from personnel in the field about a hazardous condition or from Control Room indications, evacuate the affected areas by making-the follcwing announcement:

                                     "THIS (IS) (IS NOT) A DRILL. THIS (            S NOT) A DRILL. THIS IS A PARTIAL PLANT                      .

EVACUATE (LOCATIONS OF HAZ E AT (LOCATION OF ASSEMBLY .

                                                                                      , S NOT) A DRILL. THIS (IS       g OT     ,

2.2.2 If necessary, acc [UV & ersonnel

                                                                   *fforp.,c.,%$yinthe   #

affectedareausingmeansBuch'hgsehur{t computer, RWP's, etc. ..s61,, (t C '

                                                                         !     ,WQ\\

_ wn .,a

                                                                                 ~

l, ,

                  ,                                                                        EP-304 Rev. 4
            .-      ,                                                                        Page 2 of 3                              ,

VAW/ MPG /rgs J

 /                   2.2.3                     If the. hazard has a potential to spread to Unit 2, f                                             evacuate construction. personnel by notifyi Bechtel Safety           r Bechtel Security                    .

Direct them to ement the Procedure for Emergency. Evacuation for Limerick Generating Station Unit 2 as necessary. 3.0 ACTIONS - FOLLOW-UP 3.1 Emergency Director or Shift Supervision shall:

                    '3.1.1                     Evaluate the situation and if conditions degrade call for an evacuation of the site in accordance with procedure EP-305, Site Evacuation.

3.1.2 If the hazard can be contained and when conditions permit, perform recovery / cleanup operations ~in accordance with EP-401, Entry for Emergency Repair and Operations. 4.0 APPENDICES [^'d . None 5.0 SUPPORTING INFORMATION , 5.1 Purpose The purpose of this procedure is to define the actions to be performed in the event that a partial plant evacuation is required. l 5.2 Criteria For Use 5.2.1 This procedure should be implemented by the . Emergency Director of Shift Supervision when one or more of the following occurs: 5.2.1.1 An increase in the area radiation monitors or continuous air monitor indications to greater than alarm levels in two or more large operating areas. l f l e

a

      *         ..[~
  • EP-304 Rev. 4 Page 3 of 3
  • l
               ,                                                                      VAW/ MPG /rgs ,

I l

                 )                 5.2.1.2    Radiation levels greater than 100 mR/hr within two k<(                                        or more large operating areas which normally experience less than 10 mR/hr.                            l 5.2.1.3    Airborne radioactivity greater than 3N8 uC1/cc for an unidentified isotope, (except for noble gas activity) or 10 MPC for identified isotopes in restricted areas in two or more large operating areas.

5.2.1.4 Release, leakage or spill of a toxic reagent such that the concentration of chemical vapors makes the areas uninhabitable in two or more large operating areas. 5.2.1.5 Other hazards such as flood or fire affecting two or more large operating areas 5.3 Special Equipment None 5.4 References  ! i . i 5.4.1 Limerlck Generating Station Emergency Plan I 5.4.2 NUREG 0654 Criteria for Preparation and

!                                             Rev. 1     Evaluation of Radiological,
 ,                                                       Emergency Response Plans and Preparedness in Support of Nuclear Power Plants 5.4.3      EP-110  Personnel Assembly and Accountability 5.4.4      EP-305  Site Evacuation 5.4.5      EP-401  Entry for Emergency Repair and Operations i

5.4.6 CP-S-8 Procedure for Emergency Evacuation for Limerick Generating Station Unit 2. I l l , i\ l l l l l M M 7?? M E R.' M T F W U T73~ EF F W "'?"~ G T U [' T E i _ _

                                                                                       ~
      '-l, ,

EP-305, Rev. 6 i Pega fs 3865136430 VAW/JLP:mgd  ; PHILADELPHIA ELECTRIC COMPANY b(O LIMERICK GENERATING STATION j y b-EMERGENCY PLAN IMPLEMENTING PROCEDURE j, EP-305 SITE EVACUATION 1.0 PARTICIPANTS ' 1.1 Emergency Director shall direct the evacuation of

                            ,       the site.

1.2 Security shall perform accountability of personnel during the evacuation. 1.3 Bechtel/ Subcontractor personnel shall evacuate in accordance with Bechtel Evacuation Procedures. 1.4 Non-essential. Unit 1 and Unit 2 personnel shall evacuate.

                                                                                                                ~

( 2.0 ACTIONS - IMMEDIATE 2.1 , Emergency Director shall: 2.1.1 Determine the offsite assembly area based on wind direction, weather conditions, and other pertinent information: Cromby Generating Station or, Limerick Airport 2.1.2 Determine route to be used to leave site (i.e. main gate or back gate). If wind is from south i consider using back gate, for any other rection consider the main gate. l l IF THE WIND DIRECTION IS F NSIDER USING CROMBY GENERATING ST . ( AN THER WIND DIRECTION CONSIDER NG EIM8SII.CK' KIRPORT.

                                                      .4
                                                      ~

W % '> ....v.9 i

                                                       \s        ,.. C't.' .' ;.h l

l

                                                        .a      ;. 1;. ; \\
                                                                   . 4 -. .

(#e c. g Y','(' 3 (,'j e%1 gi.9 4  : 1

 - {_      [: k        f.?? .f   *
                                                        ?   .

1 __:__,._

          . l,     ,                                                      EP-305, Rev. 6
                 ,                                                           Page 2 of 5 VAW/JLP:mgd
  /                  2.1.3         Notify and inform the Security Team Leader of the
 -P                                following information:

A. Chosen exit points, routes and selected offsite assembly areas.  ; B. Implement EP-268, Security Team for Site Evacuation. 2.1.4 Notify and inform the Personnel Safety Team Leader of the following informations A. Chosen exit points, routes and selected offsite assembly areas. B. Implement the applicable actions in EP-254, Vehicle and Evacuee Control Group. 2.1.5 Notify PEMA or BRP (if on site) that a Site-Evacuation is being called. 2.1.6 Notify chosen assembly area of the site evacuation:

                                                                                         ^

Cromby Statioit: W or g or @

;                                 Pottstown Limerick Airport: M
. . s.

2.1.7 Evacuate all Construction Personnel b contacting Bechtel Safety W or Security and i direct them to call for a " Total Project Evacuation" in accordance with Bechtel Evacuation Procedures, if not already done, and direct them to report to the selected offsite assembly area using the selected routes for leaving the site. 2.1.8 Implement the evacuation of the Information Center in accordance with EP-306, cuation of the Information Center g or , if not already done. l 2.1.9 When the Security Team Leader is ready, direct the l ACTIVATION OF THE ALARM in accordance with EP-301, Operating the Evacuation and River Warning System. ACTIVATE BOTH THE SIREN AND THE RIVER WARNING MESSAGE. l k n--xrrm war w m ,.s ~ xc c--- - mm,: - - . -

 .         l.     ,

EP-305, Rev. 6 Paga 3 of 5 VAW/JLP:mgd 2.1.10 When the alarms are silent, ANNOUNCE EVACUATION as [?- follows:

                              " ATTENTION ALL PERSONNEL. THIS (IS)(IS NOT) A DRILL. THIS (IS)(IS NOT) A DRILL. THIS IS.A SITE EVACUATION. DESIGNATED EMERGENCY RESPONSE PERSONNEL REPORT TO ASSIGNED ASSEMBLY AREA. ALL OTHER PTRSONNEL EVACUATE THE SITE IMMEDIATELY. ALL EVACUATING PERSONNEL SHALL RE-ASSEMBLE AT (CROMBY         .I (THE LIMERICK AIRPORT). THIS GENERATING STATION)

(IS)(IS NOT) A DRILL. THIS (IS)(IS NOT) A DRILL. l 2.1.11 Activate alarms again. 2.1.12 Repeat announcement. Make announcement on Unit 2 j Page 2.1.13 + Direct the workers at the RMC Facility on Fricks Lock Road to evacuate M . 3.0 ACTIONS - FOLLOW-UP 3.1 Security shall: (_j 3.1.1 Perform accountability of personnel in accordance with EP-110, Personnel Assembly and Accountability. 3.1.2 Inform the Emergency Director of unaccounted for personnel. 3.2 Emergency Director shall: 3.2.1 Direct the Personnel Safety Team Leader to initiate search and rescue operations for any unaccounted for personnel in accordance with EP-252, Search & Rescue /First Aid. 3.3 Bechtel/ Subcontractor (Unit 2) Personnel shall: 3.3.1 Evacuate in accordance with Bechtel Evacuation l Procedures, using personal vehicles to leave the site. , 3.4 Non-Essential Unit 1 personnel shall: l 3.4.1 Exit the protected area through the Administration Guard House or Technical Support Center Guard House by depositing security badges and dosimetry into containers, and report to the selected

   -[                      offsite assembly area, using personal vehicles.

1

                                                                                   ~~~~

L_"3E' M'*2*.TM,~~%"";3*WXM :My=& D W M V'~T"Y7V mKTT Y

            ,I.     .

EP-305, Rev. 6 Page 4 of 5

         .-                                                                               VAW/JLP:mgd              -
    -(                3.4.2          Follow vehicle evacuation routes as directed by
 .I                     -

Security personnel. 3.5 Designated Emergency Response Personnel shall: 3.5.1 Report to their designated assembly area in accordance with Appendix EP-110-1, Emergency

  • Assembly Areas.

4 1 4.0 APPENDICES None. , 5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to define the acticns to be performed if a site evacuation is required.

       \              5.2            Criteria For Use 5.2.1          This procedure should be implemented by,the Emergency Director at his discretion or when an actual or potential radioactive release exceeds l                                     that specified as an Alert or Site Emergency level in EP-101, Classifications of Emergencies.

The Emergency Director should consider the following when deciding to evacuate the site: 5.2.1.1 The decision to evacuate personnel as a protective action should be based on the determination that it will result in the lowest personnel exposure in comparison with other protective action options. 5.2.1.2 Consider the dose rates at the personnel assembly areas, onsite, and along evacuation routes, number of personnel onsite, and the potential for mitigating or terminating the emergency prior to personnel receiving exposures in excess of the protective actLon guides. Nm=~x-rw r- w. mmme:x a.u.~ rmr-m - .- --m.- w : v m - .. :y: m -: - ;-~ _ .

  ,         .l.   '
                        .                                                          EP-305, Rav. 6 Page 5 of 5 VAW/JLP:mgd              -

5.2.1.3 Initiate site evacuations before or after the

'((                               passage of the release, and when practical, evacuation routes shall be given to lead personnel away from the path of the plume.

5.3 Special Equipment  ! None 5.4 References . , 5.4.1 Limerick Generating Station Emergency Plan 5.4.2 NUREG 0654, Criteria for Preparation and Evaluation of Rev. 1 Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power l Plants. 5.4.3 EP-252 Search and Rescue /First Aid Group l l 5.4.4 EP-101 Classification of Emergencies ' 5.4.5 EP-110 Personnel Assembly and Accountability )

             )            5.4.6   EP-208  Security Team 5.4.7   EP-254  Vehicle And Evacuee Control Group                                              )

l 5.4.8 EP-301 Operating the Evacuation Alarm and River l Warning system 5.4.9 EP-306 Evacuation of the Information Center l i l l l l O 1 mmmy-- .- p -- - pp - ., v;r . a:ez v - r.- r ::m,u-, ~ - ? -- ,-m,~ ~; rr -

4 l . EP-306 Rev. 4

 .-         s     .                                   3865136440                  Page 1 of 4 MJR/rgs      .
                                                                                         $a (V                                    PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE
                                                                                          -s g

f EP-306 EVACUATION OF THE INFORMATION CENTER 1.0 PARTICIPANTS 1.1 Emergency Director shall determine if the Limerick knergy Information Center is to be evacuated. 1.2 Information Center Staff shall direct the evacuation. 2.0 ACTIONS-IMMEDIATE

                    '2.1    Emergency Director shall 2.1.1   Call the LIMERICK ENERGY INFORMATION CENTER using the numbers below to determine if anyone is present.

Direct the.Informatien Center Staff to evacuate the - center. . A. @ (Centrex) B. 2.1.2 If there is a gaseoas release of' radioactive material, . inform the staff as to the wind direction so evacuation routes can be identified. 3.0 ACTIONS-FOLLOW-UP 3.1 Information Center Staff shall: 3.1.1 Inform the visitors that a precautiona uation is , necessary. EVERY EFFORT SHOULD BE MADE ITORS CALM.

                                                           +

INFORMATION RELATING 1 lt ' S- AFETY SHOULD BE PROVIDED. , 4' fl.\ 3.1.2 Mave the visitors pro rde inf6:rwasi,oC 306-1, Information Center Visi(or 4 Li *gepEP-

1 l . EP-306 Rev. 4

      .             .                                                        Page 2 of 4        i MJR/rgs    -

(( 3.1.3 Direct the visitors to leave the Information Center. Inform them to use one of the following routes based on the wind direction, if there has been a gaseous 1 release of radioactive material. l Wind Direction From: Evacuation Routes NW Take Longview Road North to 422 SW Take Longview Road South to 724 Other Directions Either route 3.1.4 When possible, forward the list of visitors to the Personnel Safety Team Leader. 3.1.5 Direct the Information Center staff to secure the building and leave per the appropriate evacuation routes. 4.0 APPENDICES 4.1 EP-306-1, Information Center Visitor's List

!             5.0     SUPPORTING INFORMATION 3

5.1 Purpose The purpose of this procedure is to define the actions to be performed in the event that the Information i Center must be evacuated.

.                     5.2    Criteria For Use i

This procedure shall be implemented by the Emergency Director at his discretion or when a Site Evacuation is implemented in accordance with EP-305, Site Evacuation. l l l( t 1 l

    --r m - n . . ~- .- nr ~vrx mm. .=              ,-~~vwn .w m r     -~.m -   ~~~~'v~~- -     1
   .           l EP-306 Rev. 4
                      .          ,                                                                                                                        Page 3 of 4
                 ,                                                                                                                                            MJR/rgs 5.3            Special Equipment
   -k None 5.4            References 5.4.1          Limerick Generating Station Emergency Plan 5.4.2          NUREG O Criteria For Preparation and l                                      Rev. 1                   Evaluation of Radiological Emergency Response Plans and Preparedness In Support of Nuclear Power Plants.

5.4.3 'EP-305 Site Evacuation m -

   "- u O
 , ,<t ~>
   .". g.          s t: . %, .
                                                                       ;, .-l m,h s,.-t .' L ,}V V',   ~r,.
                                                                                                             ^-
                                                                                                                    ,.. ,.s ? n't.' , ? - . r.,, -
  • Q * " , '_ J *. r* g..-.' ..
                                                     ' .: -_' *:"l.',.                                                             *
I ",* ,
                                      -*? ?0.)

L*? *.* ,I e ' *' . 's . * ' - l C M . . ..

  • 3* e

[s6;t ? c

  • 4 .

iI [8. ' jr.t[.. '

                                          ,R$bit
                                                 ;bp:1>. >.p:vF I

l

                                                                 $.g:,:,'"E uif1:K F p. p ,(:
                                                                                                 !  > fE 44s g
       .fr vo:                                                                                                                 .

e R4J 6e 0g 3a R M F F A e P T P S E R R E E T B N M E U C N N E O N I O T H A P M R O F N I E R T U S T I A L ' N E E G T M S I A I R S D T 1O T 6I 0S 3I V , P ER XT IN E . O= DE NC E S PN S PO E AI R T D A D M A R O F N I O= E M

  • A a ^

N . i4

4, . I

  • 4, 3865136450 S'; "Si '

VAV/ MPG /mc . ( PHILADELPHIA ELECTPIC COMPANY LIMERICK GENERATING STATION yJ k EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-307 RECEPTION AND ORIENTATION OF SUPPORT PERSONNEL L I CAUTION 6 THIS PROCEDURE IS NOT INTENDED FOR IMMEDIATE OFF-SITE RESPONSE I PERSONNEL SUCH AS AMBULANCES OR FIRE COMPANIES. 1.0 PARTICIPANTS l.1 Planning and Scheduling Coordinator shall direct the reception and orientation of support personnel. 1.2 Personnel from the Nuclear Training Section or their contractors shall train the support personnel, 4 f ( 2.0 ACTIONS-IMMEDIATE 2.1 Planning and Scheduling Coordinator shall: 2.1.1 Direct Training personnel through the Training Coordinator to report to the Emergency Support Center or other designated area and perform the appropriate training. 2.1.2 Direct the Security Team Leader to assign a Security Team Member to report to the Emergency Support Center or other designated. a to issue security badges. 7 l 2.1.3 Direct the Personal Safety e r to assign a Personnel Dosimetry, Elo @ iratory Protection Group Memb ep,o ;.to the Emergency Support Center or ot{fe'r' tjnated, area and saue l

        #                                                    ance   tih, theitfahpropri                                   j dosimetry       in section of EP-273f.acco  p\ PersonnelD6simetry               ay,                       '

Respiratory Prod ct; ion'Grodp..'ql's W \;r% k 3.0 ACTIONS-FOLLOW-UP s

 ' - >-=tte _~"p,3 77 err y -r en am=:'mpga,-*pTyr* r rg*?p? p M ?W!t.q! a',*y7 ff,--==.* *r** - ,* 7 * "~* y-*

(, .- , r;< '

 .s                                                          ja
      =.

l- I EP-307, Rav. 3

         .                                                             Paga 2 of 3 VAV/ MPG /mc

( 3.1 Training personnel shall: 3.1.1 Request from the Planning and Scheduling Coordinator information regarding the team or staff to which the Support personnel are to r'eport. 3.1.2 Request from the Planning and, Scheduling Coordinator information regarding the plant status. 3.1.3 Assemble personnel in the classroom and provide them with the following information: c A. Basic description of the plant status. B. Work shift hours they will be assigned to. C. Arrangements for hotels, meals and transportation. D. Person to whom they are to report. 3.1.4 With the same group conduct a General Employee Training Class,. Also, if necessary, conduct /a General Respiratory Training Class and Respiratory Fit Test. - - '( 3.1.5 Conduct training sessions on special topics as necessary such as ute of Potassium Iodide tablets, evacuation plans, etc. 3.1.6 Contact appropriate Station personnel assigned the responsibility for supervising the support personnel. Request authorization to release personnel to these Station personnel and have them meet the support personnel at the entrance of the Technical Support Center, if activated or the ' Administration Building Guard Station. ' 3.1.7 Ensure that personnel have appropridte badges and dosimetry before releasing them. - 3.2 Planning and Scheduling Coordinator shail: 3.2.1 Inform the Site Emergency Coordinater/and Err.ergency Director when the designated Support personnel have been properly indoctrinated and trained and'are ready for work in the plant or on the site. , O . wwmmmmmm= = = = ::

EP-307, Rav. 3 l

           .      ,                                                    Page 3 of 3 VAV/ MPG /mc .
             .4.0

[( APPENDICES None. 5.0 SUPPORTING INFORMATION 5.1 Purpose This procedure defines the actions to be taken to receive and train those support personnel who will be coming on site for an extended period of time to respond to an emergency. 5.2 Criteria for Use 5.2.1 Emergency Support Center or other reception area is activated. 5.2.2 Off-site personnel needed for assistance and will be arriving at the reception area. 5.2.3 This procedure.shall be implemented when the arrival of off-site support personnel requested by the Philadelphia Electric Company is anticipated and the Emergency Support Center or other reception (Os area is activated. 5.3 Special Equipment None. 5.4 References 5.4.1 Limerick Generating Station Emergency Plan 5.4.2 EP-253 Personnel Dosimetry, Bioassay, Respiratory Protection Group O - - _ - _ , . ~ . - - - -

                                                                                                                     .. , A n p. 7 ~ ::, ;. '

h '.,. . . . ..L

                                                               > . .. . . .,b .. 3 : . .d
                                                                                            *'..'.~'-

4' * . .TE:::..L -:.C. ;. :. .. .. . . l . . . ..: : . .

                                 ^

1~k EP-330 Rev. 5

                                                                                                                             ~

a' ,. -

                                                  .                                                 3865136460                             Page 1 oe 1.

(( 'zt ..,. PHILADELPHIA ELECTRIC COMPANY f 2[ h I LIMERICK GENERATING STATION (EMERGENCY PLAN IMPLEMENTING PROCEDURE l s l

                \          ,

EP-330 EMERGENCY RESPONSE FACILITY HABITABILITY N l'. 0 ' Pa rt. icipants t

              ,                \
               'y                 4-1.1                           The Ettergency Director shall direct that                                           -

i s habitability surveys be performed.

   \
                    %                        1. 2 >                        The Personnel Safety Team Leaders shall direct the Plant Survey group to perform radiological habitability surveys.

1.3 , The Plant Survey Group Leader shall direct to an

  • i Health Physics technician in performance of radiological habitability surveys.

1.4 The HP Technician shall do radiological

                                                    ,                      habitabi-lity surveys.

O 1.5 .~ The Chemistry and Analysis Group Leader shall

i. I direct a chemistry technician in performance of
                                     .                       t             chemical habitability studies.
1. 6 ' The Chemistry Technician shall do chemical habitability surveys.
                  +

1.7 The Facility Director is responsible for determining if an evacuation of the facility is

                       !                                                   warranted based on the information provided by the s

1 HP and/or Chemistry Technician. 2.0 ACTIONS - IMMEDIATE 2.1 The Emergency Director shall: 2.1.1 Direct the Personnel Safety Team L perform habitability surveys of the Em ~ n' nse Facilities and to report the e surveys s? ' to the appropriate Facility d., O .-,

2. 2, The Personnel Safety Team Le'ader'shall':
                                                                                                      ,s.,p .            .-    a
                                                                                                                                      /;<
                                                                                                       ,,..         p           .
                                                                                                                                             ,, \
                                                                                                                      . .}:;          'Q .' , '

j Qy) h - -_

l

                                                                                                      <^                      .a,
                                                       .- .. ; E . . .-L ' O . " . :.3.. I. . M.,.~ .J. v:.::aL :[.: :O a ... . - .L *:x*: :. ..' .
                                                                                                                                           .a            e- w
                 .  ,1:          .      v. ...:
                           ~

l EP-330 Rev. 5 . Page 2 of 16 , MJR/mgd 2.2.1 Direct the Plant Survey Group Leader to perform a radiological habitability evaluation of the Emergency Response Facilities (as required) and to report the results of the surveys to the appropriate Facility Director. g' 2.3 The Plant Survey Group Leader shall: 1 2.3.1 Instruct a Health Physcis Technician to: 2.3.1.1 Report to the appropriate Emergency Response . Facility and perform a radiological habitability evaluation. Perform a general area dose rate survey, and draw an air sample to determine airborne radioactivity concentrations, or evaluate the operating cam, if one is in the area. 2.3.1.2 ' Compare the evaluation with Appendix EP-330-1 and inform the appropriate Facility Director that, (1) Present radiological conditions are within the guidelines of Appendix EP-330-1.

                               ^

(2) Present radiological conditions exceed the

  ,yO W    ,,

guidelines in Appendix EP-330-1 and to what extent the guidelines are exceeded. 2.3.1.3 Report the results back to the Plant Survey Group Leader or (Interim) Personnel Safety Team Leader. 2.4 Health Physics Technician shall: 2.4.1 For the TSC, OSC, Chemistry Lab Area, and Maintenance Office perform the following: 2.4.1.1 Start a continuous air monitor, if not already operating, and document baseline readings or perform an airborne survey and analysis in accordance with HP-213 and HP-214. 2.4.1.2 If continuous air monitor baseline readings or air sample results exceed the values in Appendix EP- , 330-1 or the equipment is not operable, notify the 4 Plant Survey Goup Leader or (Interim) Personnel Safety Team Leader. 2.4.1.3 Perform a general area survey. l d 2.4.1.4 Set up a frisker, if there is not one present, at the entrance to the emergency response facility.

2.4.2 For the Control Room, perform the following

p ,

.- . ,. g, . - --
                                                                                                                      .;..:... . ..:n: u = _... . . a ; .'i .:...'. .,.. :.'. a .
 . ...                      . -,           .     ...a              .
                                                                       .t :1 u .*e.:.:                              .

l

  • EP-330 Rev. 5 Page 3 of 16 -

l MJR/mgd i(( O , 2.4.2.1 Determine the status of Control Room ventilation (e.g., isolated). 2.4.2.2 Perform a general area radiation survey. - 2.4.2.3 Set up a frisker, if there is not one, at the Control Room entrance. 2.4.3 Report the results of the habitability check to the respective emergency response facility personnel indicated below and Plant Survey Group Leader.

                                                                     .                Emergency                                               Emergency Response 2.4.3.1                             Response Facility                                                  Facility Personnel Technical Support                                                  Emergency Director Center Operations Support                                                 OSC Coordinator Center Control Room                                                       Shift Supervision Chemistry Lab Area                                                 Chemistry Sampling And Analysis Group

'( Leader Maintenance Office Senior Person Present or Fire and Damage Team Leader 2.5 Chemistry Sampling and Analysis Group Leader shall: 2.5.1 When required, direct a chemistry technician to: 2.5.1.1 Perform a chemistry habitability survey of the appropriate facility using Appendix EP-330-2, Determination of Toxic Gas Concentrations. 2.5.1.2 Compare the survey results with Appendix EP-330-2 and inform the appropriate facility director that: , A. Present atmospheric conditions do not exceed the guidelines in Appendix EP-330-2. B. Present atmospheric conditions do exceed the guidelines of Appendix EP-330-2 and to what extent the guidelines are exceeded. 2.5.1.3 Report the results back to the Chemistry Sampling 1

'O                                                                      and Analysis Group Lcader.
 -- ---..-       -e.-            ,,y-y  ,,.y,,_, , , ,,,,.-_y_m.           ,,,m_.,,--         ,,__v-_,ym-,..ww           .

wm y. .,_r_,... __.-----~wy.m_,y--- , .,-% , ,, , .-..--,..,._-,m,_. c.

                ..   ..   . r' . .. n     ... ./ . : : '. . *.. . . . , :.: .. . . _ . : a 2.x. . c. . . s. a I                                                                                                      EP-330 Rev. 5 Page 4 of 16 MJR/mgd Y.                  2.5.2              Report the results to the Chemistry Sampling and Analysis Team Leader.

2.6 Chemistry Technician shall: ' 2.6.1 Report to the appropriate Emergency Response Facility and perform the following: USE OF RESPIRATORY PROTECTION EQUIPMENT SHOULD BE l' CONSIDERED (SCBA) FOR ENTRY INTO A FACILITY WITH SUSPECTED TOXIC SUBSTANCES IN THE ATMOSPHERE. 2.6.1.1 Perform a check of the Emergency Response Facility for toxic gas concentrations in accordance with Appendix EP-330-2. 2.6.'l.2 Use Appendix EP-330-2 to determine if the measured toxic gas concentrations levels are acceptable. 2.6.2 Report the results of the survey to the respective emergency response personnel and the Chemistry Sampling and Analysis Group Leader. , Emergency Emergency Response -

      '^N            2.6.2.1              Respon'se Facility                                        Facility Personnel b                                    Technical Support                                         Emergency Director Center Operations Support                                        OSC Coordinator Center Control Room                                              Shift Supervision Chemistry Lab Area                                        Chemistry Sampling And Analysis Group Leader Maintenance Office                                        Senior Person Present or Fire and Damage Team Leader 3.0     ACTIONS - FOLLOW-UP 3.1               The Facility Director shall:

l 3.1.1 Based on the information provided by the Health Physics Technician or Chemistry Technician determine if the facility should be evacuated or if ' (, \.('J 'T protective devices are needed.

h.

*              '......;     :9 e h. .
                                         ~-
                                                    .         . - l, ~ ,&

i

                                                    . . .:: .a.u. ..:.s.. . ~. . u.. . .

l '

                                                                                          .r .: .a , . . c .
                                                                                                                      ~      -
                               .~ .                                                                            -s...
                         ?.                                                                                             .. , . . . .
    ,l                                                                                           EP-330 Rev. 5                       .

Page 5 of 16 ((, h l THIS DECISION SHOULD BE BASED ON THE TYPE OF l HAZARD, THE EXPECTED DURATION OF THE HAZARD OR ' FACILITY OCCUPATION AND IF A SUITABLE ALTERNATE

  • LOCATION IS AVAILABLE. THIS DECISION SHOULD BE DISCUSSED WITH THE (INTERIM) EMERGENCY DIRECTOR, IF APPLICABLE AND IF TIME PERMITS.

3.2 Plant Survey Group Leader or Personnel Safety Team Leader shall: 3.2.1 Establish the frequency and type of follow-up radiological monitoring for the Emergency Response Facilities. 3.3 Chemistry Sampling and Analysis Group Leader shall: 4 3.3.1 Establish the frequency and type of follow-up a chemical monitoring for the Emergency Response Facilities. 3.4 The Health Physics Technician and Chemistry Technician shall:. 3.4.1 File the. survey results and report to their [

  ~

appropriate Group Leader for re-assignment. 4.0 APPENDICES 4.1 EP-330-1 Emergency Response Facility Radiological Habitability Guidelines 4.2 EP-330-2 Determination of Toxic Gas Concentrations 5.0 SUPPORTING INFORMATION l 5.1 The purpose of this procedure is to provide habitability guidelines for the Technical Support Center, Operations Support Center, Control Room, Chemistry Lab Area, and Maintenance Staging Area. 5.2 Criteria for Use 5.2.1 An Emergency has been declared in accordance with EP-101, Classification of Emergencies. 5.2.2 Known or suspected chemical release as indicated by: 5.2.2.1 Control Room toxic gas detection system or chlorine gas detection system alarming. 5.2.2.2 Fire in the plant.

e .- _ _I. M' '. I . d. . . ~ a.; . <:. A . . .: .u .

                                                                                       . . . . -..2   _. .._. r . ._

l EP-330 Rev. 5 ' Page 6 of 16 MJR/mgd lD 4((O 5.2.2.3 Visual observation or detection by odor in the area of the facility. 5.2.2.4 Train derailment on or near the site. 5.2.2.5 Report from Shift Supervision of toxic gas or

  • chlorine release from nearby offsite facility.

5.2.3 Upon alert or alarm of ERF continuous air monitor. ' 5.2.4 Alert or alarm of an ERF area radiation monitor. 5.3 , Special Equipment 5.3.1 Toxic Gas Detection Equipment 5.3.2 Oxygen Monitor 5.3.3 Continuous Air Monitors 5.3.4 Radiation Survey Meter 5.4 References 5.4.1 NUREG-llllll-CriteriaforPreparationandEvaluation [/N (A (, ,) of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants. 5.4.2 FSAR 1.13.2 Item II.B.2 - Plant Shielding 5.4.3 FSAR Table 2.2 Potentially Hazardous Chemicals Requiring Monitoring 5.4.4 29 CFR 1910.1000 5.4.5 20 CFR 1910.1017 5.4.6 HP-210 Radiation Survey Techniques 5.4.7 HP-212 Airborne Contamination Monitoring - CAMS 5.4.8 HP-213 Airborne Contamination Sampling Techniques 5.4.9 HP-214 Air Sample Analysis and Evaluation '(

l EP-330 Rev. 5 Page 7 of 16 MJR/mgd APPENDIX EP-330-1 EMERGENCY RESPONSE FACILITY RADIOLOGICAL HABITABILITY GUIDELINES Whole Body Dose Rate 25 mR/hr Airborne concentration 0.25 MPC NOTE THESE VALUES CORRESPOND TO ADMINISTRATIVE GUIDELINES WHICH WILL BE RETAINED DURING EMERGENCY CONDITIONS, OF 300 mR/ DAY AND 20 MPC-HRS / WEEK. ASSUME 12 HOUR OCCUPANCY TIMES PER PERSON PER DAY. IF THE RADIOLOGICAL CONDITIONS EXCEED THESE VALUES, NOTIFY - THE PERSONNEL SAFETY TEAM LEADER FOR ACTIONS TO BE TAKEN. n, - ( )

   \ s' U
                                                           . i. . . .        .... ~         . . . . . .     .     .       . . - .   ..              ,

I* , *l EP-330 Rev. 5 Page 8 of 16  ;

l. MJR/mgd APPENDIX EP-330-2 DETERMINATION OF TOXIC GAS CONCENTRATIONS Obtain the necessary equipment and check the pump performance by parforming the following steps:

THE GAS DETECTOR PUMPS ARE LOCATED IN THE CHEMISTRY EMERGENCY CABINET AND THE GAS DETECTOR TUBES ARE IN THE CHEMISTRY CONVENTIONAL LAB REFRIGERATOR. STEPS A, B AND C ARE TO BE DONE AWAY FROM THE AREA IN QUESTION. Checking Pump Performance A. Visually check rubber inlet flange for cracks or tears. Replace if damaged. Tighten inlet clamping nut. B. Valve Leak Check

1. Insert a fresh sealed detector tube into pump.

Misalign red dots on pump and handle. Pull several fairly rapid continuous full pump strokes.

2. Pull handle out 6 mm (1/4 inch) and hold in this position for 1 or 2 seconds.

( 3. Release handle. If handle returns to within 1.5 mm (1/16 inch) or 4. less of fully closed position, continue to step C.

5. If handle does not return to within 1.5 mm (1/16 inch) of fully closed position (or less), consult Chemistry Supervision.

C. Field Volume Check

1. Insert a fresh sealed detector tube into pump.
2. Align red dots on pump body and handle.
3. Pull handle firmly and at a moderate speed until handle locks into position. Wait 1 minute.
4. Unlock handle by turning it and guide it back.

TO PROTECT PUMP STOPPER from breakage, do not release the handle and allow it to spring back when conducting a leak test. Make sure you hold your hand onto the handle and guide it back.

5. Pump handle should return to within 6 mm (1/4 inch) or less of the fully closed position.
6. If pump handle does not close to within 6 .tm (1/4 inch) or less, consult Chemistry Supervisio.,.
 ,.r....  , u . u . s ,,. . .. : . - - . s . m.~ .
                                                   ., .m - ~ ,. e .m. ., . . m . . . .,..,v         ..     , w n . ..; . - -      . u. . . . . . . . .

EP-330 Rev. 5

           -{

Page 9 of 16 l MJR/mgd

           \/                                         APPENDIX EP-330-2 (CON'T)

NOTE STEP D IS TO BE DONE AT THE AREA IN QUESTION i D. Sampling & Measurement Procedure

1. Perform the MEASUREMENT PROCEDURE Section of the .

appropriate Appendix Sheet for the desired gas: a) Sheet A: Ammonia b) Sheet B: Chlorine c) Sheet C: Ethylene Oxide d) Sheet D: Formaldehyde e) Sheet E: Phosgene f) Shtet F: Vinyl Chloride

2. Complete the Data Sheet and forward to the Group Leader.

I 4 l l

   . . - .     .~..._.,....,......u....n..m,.,-m.,.m..,__..,..,,.....              . _ , . . , . , . . . . . ~ . . - - ~ . . . . . . . . . .  ;

v re-aav nev. d  ! I ME:- R nuj i G:s l I l l lMeesuringl No. l Tube l Correction I l E Tube No. l Limit l Sampling l Color lPerformlRange IPump IReadingl Factor l Result lHabitabilit'y

}                  l(ppm)l Time         IChange l(Check)l(ppm)         IStrokesl(ppm)       1(Multiply by)l(ppm)                      lyes /No j                 1         1          1.        I        I           I         l          l                            l            l 2                  l        l  1       1          I       I l-2       1    2    I          I     0.5                    I            I ii   Ammonia       l        IMinute/'l Pink l             l            l         l          l                           l             l l    No. 3L        l <50 IPump         l   to     l       l 2-30       l   1     l          1    ---

I l i l IStroke lYellow I I I I l l l .{ l l l l I 30-60 1 1/2 l l 2 l l i 1 I I I I l l l l l 1 '! hj l l 1 l l l 0.33-2 3 1 l l 0.33 I l i i Chlorine

  • l l Minute / l White l I l l l 1 i No. 8La l<1.0 l Pump l To l I l-8 l 1 l l ---

l l l IStroke IOrange l I I I .I l l l l l l l 8-16 1. 1/2 l l 2 l l [ Ethylene l l 2 l Yellow I I l l l l l Oxide l <50 l Minutes /l To l l 0.4-1 1 4 l l 0.4 l l 3 No. 163L l l Pump 1Reddishi l l l l l l l ? I IStroke i Brown l l 1-100 1 2 l l --- l l

.'                 l        l  30      l Yellow l         I         -l          l          l                           l             l 3     Forcaldehydel         ISeconds/l to         l       1 0.2-5      1    5    l         l     ---

I l i No. 91L l <3 l Pump lReddishi l l l l l l ,

!                 l        IStroke l Brown l             l            l         l         l                            l            l                         i j                  l        I   1       l         l       l            l         l         l                            l            l 1        IMinute/ I White l            l            l         l         l                            l            l Phosgene     l<0.1 1 Pump        l    to    l       l 0.1-1.0 1       7   l          l     2.2                   l             I j      No. 16     l        l Stroke   l    Red   l       l           l         l          l                           l             l 1                 I        I          I          l       l           l         l          l                           l
  • l f l l 1 lYellow l l 0.1-1.0 l 7 l l 0.5 l I j Vinyl l l Minute / l to l I l l l l l t Chloride l<l.0 l Pump lReddishi 1 0.2-4.0 l 4 l l ---

l l 1 No. 131L l l Stroke l Brown l l l l l l l j i l l I l 4.0-8.8 l 2 l l 2.2 l l -

                                                                                                                                                        ^,

{ Allowable exposure to Air Contaminants. l L 4 Maximum exposure allowed by OSHA in an 8 hour work shift of a NAME: !i l 40 hour work week (Time weighted Averages)  ; i

     *NIOSH Certified Tubes, 1 25% Accuracy                                                                                                    .

i Non-NIOSH Certified Tubes, 1 50% Accuracy i '

__- 1 1 mee

       - as
  • E
  >WN of O a:

a:

   . cn
a. m CQ L I,-
                                                                      'Il                    1             1
                                                                                                                          $                               .5 5-[l$I  I g { }. i ,

s t

                                                                      -14 145 i r, y e

i

  • i 1 =1 c s'
                                                                                                                                                          =
                                                                                                                                                          ]
                                         .,2;   E 354 y                            sE                              c s                                                        s                         EE     a
                                    = 11 g
2. pt 1, 2
                                                                          -s 2'
                                                                                              -           *=.s         =

T=VV x gs =v { i o. p

                                    =  =x! g,,n.    .71           .. i l3 1 gs
                                                                  >tiy
                                                                                                          "'d 11me .

I . g n 4 g -t ig'n s E*o!g-u

                                                                  <s-                         jns             s        =4 o

n a g 5 41si 11 d* e S2 as  :

                                                                                                                      <}3
a. es-.3 iu ~~ d .

E litss a 51 i 2 1 g

                                    - 3_v ls!s
                                    =

O a*i. -

                                                              =ga!=3zq.[

ie g 2  : Et

                                                                                         ~3           .muna r I .:ng21
                                                                                                           .          o- I 21 I

i

                                    "                             g_gl                   g         ag                 <

u g E c; ill5_r g$,g g{, o, .a iFI E>j q > v o u Eg5Et57 I Ei$' at

                                       .ses:-                 a
                                                                                         $1,5     '15i                El ly 3
                                                                                                                                                    =
                                                                                         .u , . =- a                                               a
                 . z o
                                    =.sr gggag 1-
s. -
i. {!t I WI. s l =]5]

e . x-jd N i u.asslE u!!s3 cl! EJ i 4"3}3E Em a5 o m - m n. w b *E j M M s z*

                                               .3              s
                                                                             'lE                      3     !

I T T .3 1 ter P L Q 2 w lI: m 9 o a 4-u 5

                                                               =-

S$1 R i I a 2 E 4 g yI J.33 e g3 23 g, f

                                                                                                                                                  -.    ~
                                                                                             .                  3-      .

a w .E F  : 1 i * } 22 = Ij a

                 <                      a D is
                                        >      s               -

E . y 4. . a*E E I E 2 i Irta=

                                                                                                                             .:gepatl a2
                                                               .il..I
                                                                                                                                        --E r i                             :. R        -   '    E        1    2    a            2=g=t.Ee             E
                                        $ j!"!

w - ji' l i6 i g

                                                                                                                =

2

                                                                                                                      's
                                                                                                                            }J)3252 5 51              8 1

gr o t s E - 2 3

                                    - o 95               R            1       ~

g gg'i-s:(31fla.3 s I l g. t1 isi3iifa A ~ a ,o =!$  :: il wa I 4=

                                                                                                                                                  "I
                                        <   ga=i g" A Ess                                                  c3       inja e           *Ig                   g[
<< g~

ils l i .#I 2 3 at 2g I 't g - [2 = g 5 8 S

                                        !llj I

Elj! !

                                                               !  :3 : Y*

I 53 ! b!ifIllI!if!'2Ilj! t f[g= r { EIS l- 11 'i E 4 8"I* =8

                                                                                            ! !!           } !IZII!d                            k!!

_ts. f  ! mg i i .. . . . .. -

         ,.....s..<;-. ve.;: ~ c ,~y3, 7,e- ,.,7. s,
  • r s y ~y.n-* ~ 71 i
                                                                                          ~ ~. ~ ;r ~ ~ .   ****~~~~r"*-v~~               **%~'~~~~*'~"'
w. ,

i l EP- Ruv. 5 Pcgt. pf 16' I j R/mgd APPENDIX EP-330-2 (CONT'D) I SHEET B: CHLORINE t CASTEC' cost #f CTION FOR TEMPER ATI#Rt. HUMtetTV Oft PRESSURE : , CHLORINE LOW RANOE OETECTOR TURE NO SLe Cemeteen of one Casser detects tem e ne ete se hosed se e sehe seegerece of Pet ~

                                                                 '                                                                                                                             g, y , g , ,                  ,,, , g                                           n ,,,,,,

' no ces.a. .e.e. e, rene = R. - e e .e.e.a e e.e.,,,e of .e **-**'*--*d-"***a=* *'== * = *d'-'**' ~

  • es.ees e eelci. . se e - erw,e . m eti. ,e. s * ~ d - a t a- 'a 'd '- ~*"" *-a"- d "-"'

haes 7tv er i 35% se 1/2 Ity sete g the cesset ose h s5frohe Co Semphas Pomo '*" """ I' PERFORM ANCE : AiIs'eIpGeTKeeisie'ia'asFei~

  • Cetteshoe Sce's I-8 pone Resed se i pump eerenst
                                                                                                                                                                                           . CALISRATION AND ACCURACY:                                                                                           *

, Coew g.theave. - - . . . . -

                                                                                                                                   -whee - fireat.e. .. . . -.. _                              the cettec detenter lehe me me a twes esy selbreled as se telepsf part of the ass pe==e'se ( , ~eti-in.                                     ] sWe.                        s -is ep                      *raa* *= "*d'=          **"** 8 -8 "'8 + 'd*"" *** 8

_Dentas Isad,*_ , , _ nt op ,,_ , , e,I p= ,,,,, DETECTION PRINCIPLE: * [ res, Shee, tekem

                                                                       ' Semphag Inne
                                                                                                        '~3                                 I~

l sneste per peh elede t/F' ' ~ C seme esafee e femene le fue masse prederte.  ?

                                                                      " " ~                                                                                                                           CIe f Ceellsefle
  • C teNeeEpCle 4 Ces35sCle

{ Nhe seannee deidtEle"eNEshee OANGEROUS ANO HAZAROOUS PROPERTIES: MtASUfttMENT PROCEOUSIE:

  • Ih'eehsti tong Watse Tone acqhted Aeessge hy ACCfifll1981; l gem (F.S heerel

( $ I med I,e et o tree estector Ishe hp honese earh Ishe end to che gehe tip Theodest tend Vetse $hort Ieem (spessee lesel hy ACr.lH(19018: 3 sem its sometast b "- d'**8"**

. l'eserts le INTERpERENCES

late serwafy We the sehher Wet of lhe pump elph Se erres se lhe

ido peauhat Ioeses the pump . g , ,

t 3 mehe sete= the pons homes a es as ser m As esme e d does en Re seest one es.. thm 3 pp. ph,e e,.. , riessies ,see. ,

end hesamt of the pump Meer et 4 pre

, e pas = haam se = .e, e .w a hehe . ,es, de nm we w.= ens { steeseg sospo miregee es e me,e me ijs , ci, e e,ede,ee ,ees. - eseg,eseehan eten hy no e e s #ess seatseershee et the Westore of Ihe eleaned to.esseehed eeegent , tremho pure he1 e 4 6 Fw eiese occwde seetonneben heeremehen es est more thee 3 ppm.see 3 peep ,,,,,,,,,,,,,/s et cle e shetee 138e met cheen tese sence.nessa hy meteng the tehe eeed.g h,3 tese !. letse hose. l APPLICATION FOR OTHER OASES : fe 3 pee, eerske(MS m81 sesipang, she homes meet he toned IA pere as seher i .wi.e i. e ,h e p p . ehe he The Catec detwee tehe me Re ese e se s he seed Ier essersag eserenerettee of ese he .e.wew .e sie, pes e c ,,os t ,cio,0. ,s. c.e, , e a

f. a the stese eneses the honess sese eene e no te r, sal odh t peup serpelles ,e.,e, ,he e,,, ,ee ,,

mit see I/7 pwme seede tw est cheen eres comeahecen h, sessees t% sehe 8.

a*** a~ 'a* **=+  %., e.p,iend g, gi.,,s.htie ido em to speed h deced m spesse. e is ed esp.

' eene use ,

                                                                    . _ . - - _ . .            __                                .? *
                                                                                                              *""*C6''.......___..._                                                     set opt = tat =smerions acimve =va int c&stre marrsim c&s
                                                                      .'*'.np    e ehee ns -" en 8

as 'a*' " . . _' 2 _ .1. 5 J_ > Sa"' tac p*

3 pe es .s i n its _ _
's p  ;

swebetree'ws- 'F n "a 's Y s 's s 1

  • I ~

Wr CeWee tegem rdge, Jeen j l/?'ed_.s.i.,.Me.'.si.s.us.e_

                                                                                                .      .7 L '. . _. ...
                                                                                                                                     .         s..      le      er
                                                                                                                                                                   - .l._e    _y _           sit me r                                                                    ,,,,,, , ,,een                          :

i e 3 e < t k a

g, e .........=.-=.*4- = = = - *- - - - * * * * * * * * * * * * * " * ' " * * * * * *

  • i 9

e* 0 O a: a gu, e.ame---: !I l i r 1 a

                                                                                                           ,I t     I              [                    n 2
  • j t3 f 1,{

sg=====---- l

                                              =
                                              ! !i ng ....                ----

I L

r

[I n gi ; .: 1

                                                                                                                                    ]

i[ i 1 ,- [ 1 1 I RE

                                                                                                                                                  .r
                                                                                                           ~~]                      g  se          -

i s[ Ess.==--- } s.. y((

                                                                                                           .;,             .g g
                                                                                                                                    !. . l" a!E
                                                                                                                                                   !               I
                                                                                                             **           6*             b F=                           i                                                                                      l tx 8
5 5s ===--

jjujj!lIjygijjl l

  • sul e xr d -! 5
                                                                                                                                                                  }

I Ei

                -        m
                         =

W

                                                     -4 ,f } n=====---

li ii

                                                                                          ,~.

i=si 1t .,.ip.i a =- n ii!i ,g1 s,

                                                                                                                                               .!                 c 7          a                                                              =                O l l t E El          E b.k,5$5 . a.-3EE 3             il a            RB 1m X        U                                  t         ;                                      I        Ig f            {2                     F i I E        e w                        .., ,l' j           .i                         n                      s i '        ;E x                   .

t g.t f [ az li 2a.!# 1 !.l  ! i, E$ jsi  !!'-i - # it 3 I

                %*                                         lii                                   -! I et i ; 3; I jfi{j 19           1:3 b,l el'}s 5       !!

a g~r

                                                                                                                            >    lf!                 I-E!ff!
                                          .: ! -n N:

4l.

                                                                               -t-i>q[affI!j'i..f.!

EI i r i ni u ni , jll!!I{i i I!

                                                   ! q !,

is['its!! e

                                                                                                     ' I
                                                                                                                          }Iil,!1!!i.iIf i l' it 8
                                                                          .j I

l I k E a[

                                                                                                                                                      !E      'i q{g Ia' ',
                                                          !!.{.!

1,

                                                                                                             ~3 ,I #

1-Us IIfi j!  ! f ! 3 [# jf l 3-E 21 = ! t ih i ilj}a/i t 3.}ll si' Hit ! {l h i -:

                                                                                                                                                  -lI h n.:                  2 ju 11.II!!'$llilidi en}.

i } . l 0

          ,.      . . .. . , , . -,. - , ., . ... , ,- ~; ~ - r - ~ : , - 3; ~~ . ; m c.-
                                                                                                                   "--"<--~~'7""'~~~3~:~''
                                                                                                                                                                                            ' ~ '

Ul - EP R:v. 5 l R/m 9 APPENDIX EP-330-2 (CON'D) SHEET D: FORMALDEHYDE

  .. y s .

h OASTEC TemPoestece Ceeeectten TeMe SIL FORMALDEHYDE LOW RANOE DETECTOft TUSE NO.S1L , p - y,{--

                                                                                                                                                                              ,C            #

1 spe=t invi nov, seu e,sw tint, the cow. swan, two no ,it peewees see, ses ieeese eewr ii se the ceare i e. o,; -e., . 5

                                                  ..e.she.e....             .e,,,,%o              heCo.

J -$ ~ ~ ee- ,, ., ,, ,, ,, ,, a ,et,,,OR ,A.,CE . ,, ,, ,, ,, ,, i. y C .. c e ,,,-~,.d.,-he., ,, ,, ,,,

                          ._""Dd'*I'                .
                                                            . ' .~ ! "* . .                  . . .

i3 **'"**'#I'*',I** I * **"# , he terect** fe homekt f a

                         ,,o            ,
                         . _ . =='=, t =<;_ , _ ,            .,,,. .aedF,- _, _- .aai s                         ,,,,,                  i v. --i r R .see. me , e, a regesed for resetere tems6ty esage of .-90%

i se . m .-e e - - h. ra

        ,                   ,,,,,,,,,--                  - ,,,,, w ,,,,; -------                                         .te        . ,,a,,,e Imm ,
                        ~3hesite      e     ' ~ ~~          , yeylempeeryg
                                                                                                          .       CAllRRATION AND ACCURACY:
 '.j[                                                              the       . ec.tedees.re c.e                   '" Ca'= D*<*        'de "o t a < *e'dr <** *d a a m's,  d **

menetselmbeg peress Cashestes end yrwgy legt see poeteeswg egag gemeenstone eAEASUREMENT PROCEDURE : es eyeems gen she system e d est chemeas e,es,ameses awk ,se

        '.,            , ,reet too et a hesh setorim este 6, toneag eart tube end an the gehe e,
                           , , , , , , , ,                                                                       DETECTION PRINCI'PLE :
                       , tenet the este secessy ete the renber eert et the pan, och the erees se the             *#**''"***b'*'"'"'8""'''b'*8""'"""""**

eweiers pH endrefer le ee(*gh bre.e . 3 Mene estee the peep tende g es lhe egy W segh the fed delt en the hende M + E Me His - e, e eP e + ,lt I + M.0 ead pesne body INTERFERENCES :

                     .8 Pee she heams se she e, see e.re e hres es I pesas stede1108 ene Wee 3, Ansehyden, Ares gene, and itetenes podere sunens stem 6, themseseet end d tees eted sere se sad we nch she honae he mang I/4 sure e othe seertos se seews e se sw, g , paso e.,e, se she see ,eeang the stytog posege sepest thog gemehng pggedag $ awe $sagg per 500 as
                                      ,,,g,,,         g%                                                        OANGEROUS AND HAZARDOUS PROPFRTIES :
                      , e e sense =essesse se the meetmo et the steemed to seitetied essgens, es te een          IhreM (M We WegMed Aewge by EMM , web,howW
  ,f                       pistee of , ymmy shaes seemotig CDRetFCTIOed FOft TEM,fMATURE HUMIOffY AND PRESSURE:

TUSES MUST SE STORED AT REFRIOERATED SPACE. OTHER. WISE SHELF LIFE vil:LL SE SHORTENED.

        !             C.e ef e. ,he Co .                 .she e ,. . .e.e,      .he ,s.e  - e e, M 5878 sad est she tempwe%ee se the ses te"t sesapted, eppesenatesy ,,%                   STt OpftetMIC IN179UCT80ss!14CLU0t0 wffM TIII CASTIC WUtti1790er CAS
                      - he es., e.me, e.m oh . e.e.e                                                                            e..
  ,3                                                                                                            s..e,iset ,

i .. e - e e,h .. m R.Ti ~ .e . . ...d .r,e.d og to lho Temometere Cweertes frtae tese, 8Senefatterer :Cedoc Carpershoe, Temps, Japse

                                                                                                                ,tt ,tt I
        ,                                                                                                                                                                          p,,oges e go,,e
     .f

mw M o% 7 s l 'L) be i

                   "         Il            t          .

t }!{t I - j  ! l

                             ,.            1                                     .

ca i. 8

                                                                                 ',i.      9 y
                                                                                                                                          ]

s1 I Lis1 t i, . 1, l [ .i fi.m!..

                                                            ,1c ",

p.6 :i :.

                                                                               -c-               .

e t 1. i n: In ,- 1 i o r a el ,it 3

                                                            ,1 1li             11- I                                                 3 ya v,4 cr 1

1 3 I ll l'  : i,.il'li ;l ; l i 4 il1ln J  ; , . p  ! i i J t; t i [; v i I ll l h 1 I

                       ! i .{u o   u                                                         gl s:

m a >n ail i ;c!s,.,r r *1 i. l Iri ce.Iasg,,: .i b o i :c i. e si.a E o I 1, s. o D. [s$ 5 b

  • 1, I',1 s o :c 1E. ] ,1 .
                                                                                                                                   ' t. :

i5 g-

                                   ;t gj e i i 31 f i           !ti.l{yrI                                   i,.

1 i ,l t 11;,i l  ;

      <                           ~i           1        ;3
a i ',"
                                                                                                                              !]i::'

g i [ j i t i 1 j' g g1. t.!, th. lgi

                                                        ),,. 1-1     :i     ' [      .I     n 3
                                                                                                        .-lj  -
                                                                                                                  -  r    :
                                                                                                                              !.Il    i g                                                                                g. k- =l:

o i. E: g: e r i 1 e  ! I3 i i 3 4 1. - I, a i j>l { , {t' l:,,a .' s E 8l;J  ! *! *

                                                                                     )  I';t        J[                        l. I "

[j 1 (f 3

                                               *                                                            )

i 6 s 3 3 = I e.3 f sid' si

                                                                     . l   1[
f. j 3

{ { s a!.j.II o 'i

                   .l 11               j                l 1

(((fi - a .; I .

                                                                                                                              =i l   ,1 i
13.  !,,, j'I! l !IX
i L 1

8f I! h,g,iala%j.gl1,f;tpiijlph}ilir

                                                            .2

{ I I b 4.- I l

                                                                                                                     --gg,j O

........3.

              ,7 7              .
                                             .g-.   ,.....---~,
                                                     ..                     -   -----.-----,r-,..                              ,
                                        .'               ..: : :. a. :: . . . . = .. .
       ""S ?,
>J L

iI!T =$ t t 1 1,]i j ,18 a I. 1 11 ]

                                                 '. I 1 i                                          <!                                     I
                                               'fII                      li*y             -           SI                                     3 i j 4:

i _n, I=  :

                                               }-} {
                                                .;     g
                                                                           }.111,t........{

t.

                                                                                                                                   ,          i g
                                              -} I I                       }                                     g                             r i11 1=1 c       tii                                                    I si9{l1t_{jl8.I I} }lilla                              isnie a s .1.! s 1.1.11 I                            l        1
                                                         .( n' ti l .!!il l i 1g g  ,

o

                                              <-3                      !L; j                               111111! !!                         I        f i                        -

IE {n}' 581 !j!1f ls f o o ,f . . t sl t I- I '!-lB E l j l< I 8 i !1 - l - j.gjj::

                                                    ' E!:

l 7

                            $     ,1      ' s!Ii. ai r s        t,j c, !'i il              ..m               .
g. i I

lI O =,= 1 s B E ' ' ge t;! r i e p!g!!llIll'I: ijji,!< iiijiillf>!l!.. a I t5

                         ~

i llij I 'i i E I

                                      !!li!               !l!!!'[f }                        III             l!!!jl                     l!!             '.llllI l
                                  .i                      P.          ,!! (i                   !!5q!ili.: : i                                                                    ,

ee[lli n[ n zu i .

                                                            .i, ,:! i' .i,                           i il !;!!! ! ..

I 3

;                                     l!j'I>i te                  .til!    's - :
,111.,nilj=!I"llg.

iso g:i i 11 =-

                                                                                                                                                          '[                     ;
                                      !! .!! ! ;            i
                                                                    !            O ~a lflj!!{INli{$l'I                       !

i111 1r g.!!ia1y, 1  ! i  !! ini k,i;hi v niininn! il!ii l i ,':,1 l lij 1 un, 1 i i . !Q .

      =_                                   __                                                         _                                           _                         _

fko 8MAIEDcoxauworvo q } i PHILADELPHIA ELECTRIC COMPANY 00 u M ED E 23o1 MARKET STREET P.O. BOX 8699

                                                                            '86 N0v 24 PS :10             :

PHILADELPHI A. PA.19101 ll swistos t. o Atisiorr (2isi e415001 gygg e; < f

                                                                                          ' ":I ele.'f/.*$EUio                                                 00CKETg. .

November 18, 1986 ft  ;. Re: Docket Nos. 50-352 f 50-353[b l Dr. Thomas E. Murley j; Region 1  : Office of Inspection & Enforcement l4 U.S. Nuclear Regulatory Commission  ! 631 Park Avenue I King of Prussia, PA 19406  :' f

Dear Dr. Murley:

Enclosed are two copies of Limerick Generating Station . Emergency Plan Implementing Procedures. These procedures are submitted per regulations in 10CFR50, Appendix E, Section V. I The procedures being submitted are the following: l l. EP-201 Rev. 6 EP-210 Rev. 6  ! EP-325 Rev. 4 [ Pursuant to Section.2.790 of the Commission's regulations, - it is hereby requested that the names and telephone numbers in procedure EP-201 Rev. 6, pages 2, 9, 18, 19, and 20 be withheld from public disclosure. An affidavit setting forth the grounds in support of this , request is attached hereto. I I i l' I, l t

7 . e !l l r Dr. T. E. Murley November 18, 1986  ; Page 2 of 2 j; Two copies have been sent under separate cover to the Document Control Desk. Very truly yours,

                                        ,.   ' ,t([                             -

Enclosures / { cc: Document Control Desk f. U.S. Nuclear Regulatory Commission Washington, DC 20555 h E. Kelly, Resident Site Inspector - LGS Service List t [ . I

                                                                             ;)

l l F t I l 6' I t { i I i N l

                                    -                 -.                  - .l

COMMONWEALTH OF PENNSYLVANIA :  :

ss. .

COUNTY OF PHILADELPHIA  :  ; S. L. Daltroff, being first duly sworn, deposes and states as , follows:  !

1. He is'Vice President of Philadelphia Electric Company l (hereinafter referred to as the " Company"); her.is authorized to execute this Affidavit on behalf of the Company; and he has reviewed: l l

EP-102 Appendix 1, Rev. 1 EP-282 Rev. 7 l EP-103 Appendix 1, Rev. 1 EP-284 Rev. 7 l' EP-104 Appendix 1, Rev. 1 EP-287 Rev. 4 EP-105 Appendix 1, Rev. - 1 EP-291 Rev. 9 , EP-106 Rev. 5 EP-304 Rev. 4 EP-110 Rev. 7 EP-305 Rev. 6 EP-277 Rev. 10 EP-306 Rev. 4 (hereinafter referred to as "the Documents"), and knows the contents thereof.

2. The parts-of the Documents which are sought to be withheld from public disclosure are the listings of the home telephone numbers of employees of the Company, direct-line work telephone numbers of employees of the Company which are not listed in public telephone directories, and names and home and work numbers of emergency response support personnel and organizations.

l

3. To the best of his knowledge, information and j 1

belief, the names and telephone numbers set forth in the l Documents have been treated as confidential information and have been withheld from public disclosure by the Company.

4. The names and home telephone numbers in the Documents should be considered by the Nuclear Regulatory Commission as confidential and proprietary information and be withheld from public disclosure on the grounds that disclosure of ,

I the names and home telephone numbers of the employees of.the Company and emergency support personnel could constitute an unwarranted invasion of the personal privacy of the individuals involved, disclosure of the work telephone numbers of the 9 Company's employees and of the emergency response personnel and organizations could adversely affect the capability of prompt notification in the event of an emerg?ncy; such disclosure is not required in the public interest; and such disclosure could , l adversely affect the interests of the Company and its ability to effectively implement the notification requirements of the Emergency Plan Procedures. l l f adq n Subscribed and sworn to before me this19 day of Nonmerc.,. t 9 8 6 W)-Na-xlL' v - ji d Notary Public JUnaTH Y. FRANKLIN Not ry ; J. ; . : ' :: , PNta. Co. My Commer.mn Expires July 23.1987

cc: Troy B. Conner, Jr. , Esq. (wh enclosure) Benjamin H. Vogler, Esq. (w/ enclosure) , Mr. Frank R. Romano (w/o enclosure) Mr. Robert L. Anthony (w/o enclosure) (w/ enclosure) Ms. Maureen Mulligan Charles W. Elliott, Esq. (w/ enclosure) Barry M. Hartman, Esq. (w/ enclosure) Mr. Thomas Gerusky (w/o enclosure) Director, Penna. Emergency (w/o enclosure) ' Management Agency

Angus Love, Esq. (w/o enclosure) .

David Wersan, Esq. (w/o enclosure) Robert J. Sugarman, Esq. (w/o enclosure) ' Kathryn S. Lewis, Esq. (w/o enclosure) Spence W. Perry, Esq. (w/o enclosure) Jay M. Gutierrez, Esq. (w/o enclosure) , Atomic Safety 4 Licensing Appeal Board (w/o enclosure) (w/o enclosure)  ; Atomic Safety 4 Licensing Board Panel Docket 4 Service Section (w/ enclosure) - E. M. Kelly (w/o enclosure) Timothy R. S. Campbell (w/o enclosure) , l U I < - - ..}}