ML20214G447

From kanterella
Jump to navigation Jump to search
Requests Technical Assistance in Review of Util 741203 Submittal Re drywell-to-wetwell Leakage.Section 4.5 to SER Identifying Item as post-CP Review Item Encl.Downstream Block Valves Cited But Not Appearing in Figure 1 Listed
ML20214G447
Person / Time
Site: Columbia 
Issue date: 01/08/1975
From: Butler W
US ATOMIC ENERGY COMMISSION (AEC)
To: Schroeder F
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0045, CON-WNP-45 NUDOCS 8605220150
Download: ML20214G447 (3)


Text

.

DISTRIBUTION:

Docket File h

~

LWR 1-2 file iMcDonald RCDeYoung RWKlecker l

RTedesco TR AD Cling TR BC J0rndoff PM SVarga LWR 1-2: 75-1 Docket No. 50-397 4 Frank Schroeder, Acting Deputy Director for Technical Review, L TECHNICAL ASSISTANCE REQUEST PLANT:

VPPSS Nuclear Project No. 2 (formerly Hanford-2)

STARTS:

Post-CP Review BRANCH:

LWR l-2 PROJECT MANAGER:

John Orndoff TR BRANCHES INVOLVED:

Auxiliary and Power Conversion Systems DATE REQUIRED:

February 21, 1975 REFERENCF.:

Letter from J. J. Stein, Washington Public Power Supply System to A. Giambusso dated December 3, 1974 with attached technical report (WPPSS 74-2-R6, concept for Hain Steam Isolation Valve Leakage Control System)

DESCRIPTION OF REQUEST: Technical assistance is requested for evaluation of the submittal by WPPSS en drywell-wetwell leakage. This is a post-CP review item ubich is identified in Section 4.5 of the SER. This section of the SER is provided in Enclosure 1 for your convenience.

The above sited WFSS report refers to deemetream block valves appearing in Figure 1, but these valves are act shown in the figure. I have checked with WPSS and they state that these block valves include:

1.

Turbine stop valves, whiah will estisfy asiesic category I critancia(PSAR commitment)I and i

orrac a p ownse nma p pavs >

i Foran AEC 318 (Re. 9 $3) AECM 0240 W u. e. oovan=neemt reenve=0 orricas 9974.534699 8605220150 750108 PDR ADOCK 05000397 E

PDR

w*

TTf1ETICAL ASSISTANCE REQtT.ST 2.

A notor-operated valve in the 24-inch extraction eteam line, which is classified seismic Category I and quality Group C.

Origi"I *IE" y;auer Butkr Waltar R. Bstler, Chief Light Water Raaetors Branch No. 1-2 Directorate of Licensing

Enclosure:

As stated cc:

R. Tedesco C. Long 1

..bj.hk.1"2___..hl.h11".1.'

NC E

  • J. Orndoff W._R.

Butler i

s o.... s.,

ALLD5YN...11SD5__.

o r.

+

Form AEC.318 (Rev. 9-$3) AECM 0240 W u. s.aovann sur pesatime orrecas sete.sas.see I

4.5 Main Stenu Line Isolation valve Lechene Leakage through the closed Main Stcan Line Isolation Valves (MSLIV) following a postulated LOCA results in an uncertainty in calculating the potential radiological doses. The applicant has ccc-ritted to providing a closed scaling nystem and has in prop.rens a study to select this MSLIV seal t,ystem. -The final design of the colected system will be subnitted for our review prior to its installation.

.