ML20214G424
| ML20214G424 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/18/1975 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Thornburg H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| CON-WNP-0042, CON-WNP-42 NUDOCS 8605220101 | |
| Download: ML20214G424 (1) | |
Text
UNITED STATEf>
}
N"9 TEAR REGULATORY COMMISSION nrclON V
$UITE 202, W ALNUT CREEK PLAZ A 1990 h. C ALIFORNI A BOU:.EVARD W ALNUT CREEK, C ALIFORNI A 94S96 i
l.-
3,t k,, ; p.,' [" ',d ? ' ~ ~ '
m is ms 4,,,y,...
p
b *b
)rm..., l';r l~ Q
- p..
s,
..Cb~
=h-H. D. Thornburg, Chief, Field Support & Enforcement Office of Inspection & Enforcement, HQ y
WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WNP-2 (FORMERLY HANFORD 2)
DOCKET NO. 50-397, FABRICATION PROBLEM WITH CONIAINMENT VESSEL Attached for inforr.ation and any coments is a preliminary report by the licensee on a fabrication problem with the WNP-2 contain-ment liner. Although information is preliminary, IE:V believes the problem might be applicable to other containment structures of similar design. There are ten other reactors with over-under pressure suppression containment but WNP-2 is the only one of these ten plants utilizing Burns & Roe as A-E.
It is also possible that the problem originated from improper welding procedures or is metallurgical in nature.
The M. nue ;ue: tic.::' :he reportetilli.y of i.his item unoer 50.55(e) which is the IE:V position. However, the licensee had no prob?2m with supplying a report in response to a specific request by W. G. Albert, the principal inspector.
We will keep you advised as further information becomes available.
Our next inspection at this facility is scheduled for mid April.
vtCco 1
C. S. Spencer, Chief Reactor Testing and Operations Br.