Forwards Listings of non-routine Correspondence Between Util & NRR for Which Written Responses Required
ML20214G052
Person / Time
Site: Vogtle  
Issue date: 05/14/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
SL-2353, NUDOCS 8705260395
Download: ML20214G052 (6)


Text

n i Georci Power Comp:ny 333 Piedmont Avenu2 a

Atlinta. Georgu 30308

. Tetephon) 404 5264526.-

Mailing Address:-

Fbst Office Box 4545 Atlanta, Georgia 30302 Georgia Power L T. Gucwe the southern electnc system

- Manager Nuclear Safety and Licensing SL-2353 0239m X7GJ17-V200

~

May 14,1987

.U'. S. Nuclear-Regulatory Commission

-ATTN:. Document Control Desk-Washington, D.C.

20555 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425-OPERATING-LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 OUTSTANDING SUBMITTALS LIST Gentlemen:

Enclosed for your information and use are_ listings of no'n-routine correspondence between-Georgia Power Company-(GPC) and NRC-NRR for which written responses are required. lists those. items, awaiting GPC response while Enclosure 2 lists items awaiting NRC response.

Please contact this office -if you have any questions.

Sincerely, pg--

L. T. Gucwa JH/1m Enclosures

1.. Correspondence Awaiting GPC Response 2.

Correspondence Awaiting NRC Response

(. see next page)

-c:

l l

8705260395 870514 PDR ADOCK 05000424' P

PDR t

a

.a.

GsorgiaPowerA

. U. S. Nucle'ar. Regulatory Commission

'May 14, 1987 Page Two

.c(w): ' Georgia Power Company Mr. R. E. Conway Mr. J. P. O'Reilly Mr.

G.' Bockhold, Jr.

Mr. J. F. D' Amico Mr. C. W. Hayes GO-NORMS:

Southern Company Services Mr. R. A. Thomas Mr. J. : A. Bailey Shaw, Pittman, Potts & Trowbridge Mr. 8. W. Churchill, Attorney-at-Law -

Troutman, Sanders, Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law U. S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector-0perations, Vogtle Georgians Against Nuclear Energy -

' Mr. D. Fei g Ms.. C. Stangler 0239m u.

n=ns

7..

~

orgia P6werI, ENCLOSURE 1

' PLANT V0GTLE = - UNITS 1, 2 ;

NRC DOCKETS.50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 CORRESPONDENCE AWAITING GPC RESPONSE ITEM -

SUBJECT UNIT (S)

' REFERENCE-1

-NUREG-0737 Item III.D.1.1, 2

' SSER 3, Page 11-2 Report of leakage outside containment 2-Loose Parts. Monitoring 1,2 SSER 5,'Page 4-1;:SER,

' System baseline report 1 Page 4-32' 3'

-Verification.of test 2

SSER 5, Confirmatory.

results of electrical Item 30, Page'8-3 distribution system 4'

Main control board 2

SSER-4, Page: 9 <

separation 5-Implementation'ofi Unit 2 2

. SSER 4, Confirmatiory

seismic separation program Item S4, Page-3-6

'6

' Incorporation of generic _ and

~2~

SSER 5, Confirmatory.

plant-specific recommendations

. Item 36, Page 9-3 for TDI diesel -generators'.

.7 Inorganic zinc coating of.

1,2 -

License Condition (8);

diesel fuel oil tanks

.SSER 4, Page 9-22.

8 Alternate' Radwaste Facility 1

. License Condition (9);

~SSER 3, Open Item 20, Page 11-1; SSER-4, Page 11-1 I~

9 Generic Letter 83-28: Salem 1,2 SSER 4, Open Item 5, Page ATWS Items 2.2.1, 2.2.2, 4.2.3, 15-3; SSER 5, Page 15-1 4.2.4,.4.5.3-

.10 '

Plastic cable ties-long term 1,2 -

SSER 5, Open Item 22,.

9 port-Page 3-5 11 IE Bulletin 80-06 2

SSER 5, Confirmatory Item 25, Page 7-1 0239m El-1 05/14/87-SL-2353 700775

~-

~ _.

.3 LGeorgiaPbwer A ENCLOSURE 1:(Continued):

' CORRESPONDENCE AWAITING GPC' RESPONSE ITEMi 1 SUBJECT'

' UNIT (S)

REFERENCE SSER 5, Open Item 14(b) 12"

Plant Safety Monitoring :

1;2 System (PSMS) verification-Pages:7-1, _18-5 Land validation report 13 Battery room spray protection 2

SSER'5,-Page 8-2 g 14_

Spent. fuel pool configuration -

2

' SSER 4, Page 9 "15 ~

Control' Room Design Review..

1,2 License Condition (7)c;.

' (CRDR)' additional surveys and SSER'5, Page 18-4 and z l evaluations.

Appendix T

~

21 6i Steam Generator Tube Rupture 1,2 -

License Condition '(5);

SSER 3, Confirmatory

- Items 48 and 49, Page 15-11'

'17 ~

NUREG-0737 Item II.F.2',

1,2 License Condition (7)a; Reactor Vessel Level Indication' SSER 4, Page 4-2 System (RVLIS) report L

18 Groundwater reports-per 1,2 SSER 2, Confirmatory program Item 5, Page 2-3 b-

~ 19 1 Settlement reports-per 1,2 SSER 4, Confirmatory Item 7, Page 2-3 program:

l 20 FSAR. revisions 1,2 GN-1228 (12/10/86);.

GN-1257 (12/22/86);

GN-1254 (12/22/86);-

GN-1336 (1/15/87);

i SL-2183 (3/23/87) k

'21

' ATWS Mitigating Systems 1,2 _

10 CFR 50.62(c)(6)

Actuation Circuitry (AMSAC)

Plant-Specific Report 4

0239m El-2 05/14/87

SL-2353; i

I 2

,...-_m.-.

._.s m

,,...._,,_.,m,.,

..g.,

-y.

-.,,m,

..___.m..

9 7

y

5 lGeorgia'Poiverd

.c.

~

ENCLOSURE 11(Continued)

CORRESPONDENCE AWAITING GPC RESPONSE ITEM

> SUBJECT UNIT (S).

REFERENCE' 22-Bypass'and Inoperable -

2

.SSER 5, Confirmatory-Status Panel' Item'27, Page 7-3; SSER 4,-Page 7-2; SER, Page-7-33 2

SSER 4, Confirmatory -

23 Test of Engineered Safeguards P-4 Interlock Item 24,' Page-7-1 24

' Override of Isolation 2

SSER 4, Confirmatory.

Signals Item 26, Page ~7-1 i

25 NUREG-0737. Item II.K.3.1, 2

SSER 5, Confirmatory

.PORY Isolation.

Item 28,'Page 7..7 26 Intraplant Communication.

1,2 SSER 3, Page'9-3 l

Systen Test 27.

SPDS Supplemental Report 1,2 License Condition (7)b; SSER 6, Page118-3 and '

F Appendix-V E

-28, Spent Fuel Racks '. Seismic 1

NRC Letter to GPC Design dated 4/7/87 29 Seismic - Equipment -Qualification 2

SSER 4, Open Item 1 and Confirmatory Item 52, Page 3-10 1

30 Environmental Equipment 2

'SSER 5, Open Item 1, e

LQualification Page 3-12 31 Pre-Service Inspection Program 2

SSER 4, Open Item 2, Pages 5-1, 6-4

-32 Pump and Valve In-Service Test 2

SSER 6, Confirmatory Program Item 13, Page 3-1 33 In-Service Inspection Program 2

SSER 4, Page 5-1, 6-4 1 -

4 0239m El-3 05/14/87 SL-2353 4

MM775

e Georgia PowerI

r

~

ENCLOSURE'2 PLANT V0GTLE~ - UNITS 1, 2-NRC DOCKETS 50-424, 50-425.

OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 CORRESPONDENCE AWAITING NRC-RESPONSE ITEM'

SUBJECT:

UNIT (S)

REFERENCE 1

-Generic Letter 83-28: Salen

- 1,2 GN-1329 (1/15/87)

ATWS Items.3.1.1, 3.1.2, 3.2.1,-

3. 2.2, ; 4.5.1 -

~

2-Proposed Tech Spec Change -

1 SL-2136 (3/30/87)

Shutdown Margin l

i 1

L l'

I 023%n -

E2-1 05/14 87 SL-2353 i-l imns