ML20214G052
| ML20214G052 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/14/1987 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| SL-2353, NUDOCS 8705260395 | |
| Download: ML20214G052 (6) | |
Text
n i Georci Power Comp:ny 333 Piedmont Avenu2 a
Atlinta. Georgu 30308
. Tetephon) 404 5264526.-
Mailing Address:-
Fbst Office Box 4545 Atlanta, Georgia 30302 Georgia Power L T. Gucwe the southern electnc system
- Manager Nuclear Safety and Licensing SL-2353 0239m X7GJ17-V200
~
May 14,1987
.U'. S. Nuclear-Regulatory Commission
-ATTN:. Document Control Desk-Washington, D.C.
20555 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425-OPERATING-LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 OUTSTANDING SUBMITTALS LIST Gentlemen:
Enclosed for your information and use are_ listings of no'n-routine correspondence between-Georgia Power Company-(GPC) and NRC-NRR for which written responses are required. lists those. items, awaiting GPC response while Enclosure 2 lists items awaiting NRC response.
Please contact this office -if you have any questions.
Sincerely, pg--
L. T. Gucwa JH/1m Enclosures
- 1.. Correspondence Awaiting GPC Response 2.
Correspondence Awaiting NRC Response
(. see next page)
-c:
l l
8705260395 870514 PDR ADOCK 05000424' P
PDR t
a
.a.
GsorgiaPowerA
. U. S. Nucle'ar. Regulatory Commission
'May 14, 1987 Page Two
.c(w): ' Georgia Power Company Mr. R. E. Conway Mr. J. P. O'Reilly Mr.
G.' Bockhold, Jr.
Mr. J. F. D' Amico Mr. C. W. Hayes GO-NORMS:
Southern Company Services Mr. R. A. Thomas Mr. J. : A. Bailey Shaw, Pittman, Potts & Trowbridge Mr. 8. W. Churchill, Attorney-at-Law -
Troutman, Sanders, Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law U. S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector-0perations, Vogtle Georgians Against Nuclear Energy -
' Mr. D. Fei g Ms.. C. Stangler 0239m u.
n=ns
7..
~
orgia P6werI, ENCLOSURE 1
' PLANT V0GTLE = - UNITS 1, 2 ;
NRC DOCKETS.50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 CORRESPONDENCE AWAITING GPC RESPONSE ITEM -
SUBJECT UNIT (S)
' REFERENCE-1
-NUREG-0737 Item III.D.1.1, 2
' SSER 3, Page 11-2 Report of leakage outside containment 2-Loose Parts. Monitoring 1,2 SSER 5,'Page 4-1;:SER,
' System baseline report 1 Page 4-32' 3'
-Verification.of test 2
SSER 5, Confirmatory.
results of electrical Item 30, Page'8-3 distribution system 4'
Main control board 2
SSER-4, Page: 9 <
separation 5-Implementation'ofi Unit 2 2
. SSER 4, Confirmatiory
- seismic separation program Item S4, Page-3-6
'6
' Incorporation of generic _ and
~2~
SSER 5, Confirmatory.
plant-specific recommendations
. Item 36, Page 9-3 for TDI diesel -generators'.
.7 Inorganic zinc coating of.
1,2 -
License Condition (8);
diesel fuel oil tanks
.SSER 4, Page 9-22.
8 Alternate' Radwaste Facility 1
. License Condition (9);
~SSER 3, Open Item 20, Page 11-1; SSER-4, Page 11-1 I~
9 Generic Letter 83-28: Salem 1,2 SSER 4, Open Item 5, Page ATWS Items 2.2.1, 2.2.2, 4.2.3, 15-3; SSER 5, Page 15-1 4.2.4,.4.5.3-
.10 '
Plastic cable ties-long term 1,2 -
SSER 5, Open Item 22,.
9 port-Page 3-5 11 IE Bulletin 80-06 2
SSER 5, Confirmatory Item 25, Page 7-1 0239m El-1 05/14/87-SL-2353 700775
~-
~ _.
- .3 LGeorgiaPbwer A ENCLOSURE 1:(Continued):
' CORRESPONDENCE AWAITING GPC' RESPONSE ITEMi 1 SUBJECT'
' UNIT (S)
REFERENCE SSER 5, Open Item 14(b) 12"
- Plant Safety Monitoring :
1;2 System (PSMS) verification-Pages:7-1, _18-5 Land validation report 13 Battery room spray protection 2
SSER'5,-Page 8-2 g 14_
Spent. fuel pool configuration -
2
' SSER 4, Page 9 "15 ~
Control' Room Design Review..
1,2 License Condition (7)c;.
' (CRDR)' additional surveys and SSER'5, Page 18-4 and z l evaluations.
Appendix T
~
21 6i Steam Generator Tube Rupture 1,2 -
License Condition '(5);
SSER 3, Confirmatory
- Items 48 and 49, Page 15-11'
'17 ~
NUREG-0737 Item II.F.2',
1,2 License Condition (7)a; Reactor Vessel Level Indication' SSER 4, Page 4-2 System (RVLIS) report L
18 Groundwater reports-per 1,2 SSER 2, Confirmatory program Item 5, Page 2-3 b-
~ 19 1 Settlement reports-per 1,2 SSER 4, Confirmatory Item 7, Page 2-3 program:
l 20 FSAR. revisions 1,2 GN-1228 (12/10/86);.
GN-1257 (12/22/86);
GN-1254 (12/22/86);-
GN-1336 (1/15/87);
i SL-2183 (3/23/87) k
'21
' ATWS Mitigating Systems 1,2 _
Actuation Circuitry (AMSAC)
Plant-Specific Report 4
0239m El-2 05/14/87
- SL-2353; i
I 2
,...-_m.-.
._.s m
,,...._,,_.,m,.,
..g.,
-y.
-.,,m,
..___.m..
9 7
y
5 lGeorgia'Poiverd
.c.
~
ENCLOSURE 11(Continued)
CORRESPONDENCE AWAITING GPC RESPONSE ITEM
> SUBJECT UNIT (S).
REFERENCE' 22-Bypass'and Inoperable -
2
.SSER 5, Confirmatory-Status Panel' Item'27, Page 7-3; SSER 4,-Page 7-2; SER, Page-7-33 2
SSER 4, Confirmatory -
23 Test of Engineered Safeguards P-4 Interlock Item 24,' Page-7-1 24
' Override of Isolation 2
SSER 4, Confirmatory.
Signals Item 26, Page ~7-1 i
25 NUREG-0737. Item II.K.3.1, 2
SSER 5, Confirmatory
.PORY Isolation.
Item 28,'Page 7..7 26 Intraplant Communication.
1,2 SSER 3, Page'9-3 l
Systen Test 27.
SPDS Supplemental Report 1,2 License Condition (7)b; SSER 6, Page118-3 and '
F Appendix-V E
-28, Spent Fuel Racks '. Seismic 1
NRC Letter to GPC Design dated 4/7/87 29 Seismic - Equipment -Qualification 2
SSER 4, Open Item 1 and Confirmatory Item 52, Page 3-10 1
30 Environmental Equipment 2
'SSER 5, Open Item 1, e
LQualification Page 3-12 31 Pre-Service Inspection Program 2
SSER 4, Open Item 2, Pages 5-1, 6-4
-32 Pump and Valve In-Service Test 2
SSER 6, Confirmatory Program Item 13, Page 3-1 33 In-Service Inspection Program 2
SSER 4, Page 5-1, 6-4 1 -
4 0239m El-3 05/14/87 SL-2353 4
MM775
e Georgia PowerI
- r
~
ENCLOSURE'2 PLANT V0GTLE~ - UNITS 1, 2-NRC DOCKETS 50-424, 50-425.
OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 CORRESPONDENCE AWAITING NRC-RESPONSE ITEM'
SUBJECT:
UNIT (S)
REFERENCE 1
-Generic Letter 83-28: Salen
- 1,2 GN-1329 (1/15/87)
ATWS Items.3.1.1, 3.1.2, 3.2.1,-
- 3. 2.2, ; 4.5.1 -
~
2-Proposed Tech Spec Change -
1 SL-2136 (3/30/87)
i 1
L l'
I 023%n -
E2-1 05/14 87 SL-2353 i-l imns