ML20214F671

From kanterella
Jump to navigation Jump to search
Intervenor Exhibit I-ROREM-109,consisting of Undated Resume of Gj Archambeault
ML20214F671
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/09/1986
From: Archambeault G
AFFILIATION NOT ASSIGNED
To:
References
OL-I-ROREM-109, NUDOCS 8705260212
Download: ML20214F671 (4)


Text

'

So '/Sl>t+/57-Oh P il-c  ;# Q g f, Q

U : *r-RESUME OF 4 GREGORY J. ARCHAMBEAULT Certified Quali,ty Inspector arr:

n

SUMMARY

OF EXPERIENCE I have worked eight and a half years in various phases of censtruct2on: residential housing, commercial building and highway construction.

Four years and eight months as a Certified Quality Inspector QA/QC, responsible for: inspection of electrical items, welding, anchor ocits, document review and documentation with all applicable codes and standards; both in the construction and shut-down, (outages) of nuclear power plants.

INSPECTION EXPERIENCE September 1985 - BALDWIN ASSOCIATES Present Certified Quality Control Inspector (Electrical) Level II Per ANSI N45.2.6 -

1978 (construction)

Clinton Nuclear Power Station, d - Performed inspection of electrical items to ensure compliance with approved project design requirecents and with quality control procedures and specifications.

8705260212 860909 - Reviewed and researched the required PDR ADOCK 05000456 quality documentation.

G PDR - Activities inspected include: raceway supports and anchor bolt installation.

April 1985 - BALDWIN ASSOCIATES September 1985 Certified Quality Assurance Field Verification Inspector (Electrical / Welding) Level II Per ANSI

.' N45.2.6 - 1978 (construction)

Clinton Nuclear Power Station Clinton, IL 4/85 - 9/85

- Performed verification of electrical I"*** ## i"*P'**i " * '"*""*

001G"- 7 compliance with approved project design  !

requirements and with quality assurance

  • ? procedures and specifications.

- Reviewed and researched the required 4 quality documentation. d

- Activities inspected include: raceway l

g1-- c' M , and supports, including welding and

' T.7/

anchor bolt attachment.

pg@jd.fiM]j

EXHIBITI 164

- Document research & review.

. ( .

. .g. . /

4 september 1983 - DANIEL CONSTRUCTION COMPANY March 1985 Certified Quality Inspector (Electrical),

Level III (construction Shearon Harris Nuclear Power Plant New Hill,*NO, 12/83 - 3/85

- Perform or witness inspections, tests, and verifications to ensure compliance with approved project design p requirements and with Quality Control procedures and specifications.

- Generate the required quality documentaticn.

i - Activities inspected include: cable installation and terminations, document review and surveillance.

J Certified Quality Inspector (Electrical)

Level II (outage)

Turkey Point Nucleer Plant Florida City, FL, 9/83 - 12/83

- Activities inspected include:

electrical test, conduit, coaxial connectors, electrical equipment, heat shrink, cable installation and terminations, structural velding of electrical supports and equipment, plant modifications and documentation.

July 1982 - U.S. TESTING COMPANY July 1983 St. Lucie Nuclear Plant Hutchinson Island, FL, 7/82 - 7/83 Electrical Quality control Inspector -

Level II (construction and outage)

- Performed inspections of the following:

grounding, electrical testing, coaxial 7"7 connectors, conduit, manhole, fire barriers, electrical equipment, electrical embed items, electrical taping, electrical penetrations, heat shrinkg structural welding of electrical supports and equipment, documentation and plant change sodifications.

March 1979 - Electrical / Mechanical / Receiving Qua1ity j August 1980 control Inspector - Level I, 3/79 - 8/80

- Responsible for inspections described above. Although I held' certifications

. /7 in Mechanical and Receiving, I did not work in those disciplines.

CONSTRUCTION EXPERIENCE 001C'r.3 l 1982 Carpenter / Electrician, Self-employed, l 3/82 - 7/82. l

- Trim _med houses and performed light l electrical work.

y eew+c. .p- m-, -

. - - - g _y g

. i . .

. .3 /I d

1981 - Carpenter, Space Tech Homes 1982 Port St. Lucie, FL Responsible for trim work on pre-fab homes.

Participated in erection of houses, including truss work and roofing.

1981 Carpenter, Spanish Lake Mobile- Home Communitles, Port St. Lucie, FL

- Performed rough carpentry and trim, laid rebar, welded and painted.

1980 - Carpenter, Jasper Construciton Co.

1981 Ft. Pierce, FL

- Duties include rough carpentry, laying rebar, welding and blueprint reading for the construction of bridge caps of I-95.

1980 Carpenter / Electrician, Self-employed

- Activities included wiring, lighting, conduit, framing, trim,- and blueprint reading.

1978 - Department Manager, East Coast Lumber 1979 Co., Fort Pierce, FL

- Managed pre-hung door department, controlled inventory, performed maintenance on equipment.

MILITARY EXPERIENCE 1974 - U.S. ARMY 1977 Rank: E-5 Helicopter Repairman (crew chief)

Honorable Discharge EDUCATION & TRAINING 1983 EBASCO SERVICES, INC.

TPC Training Systems (40 hrs.)

Awarded certificate in all of the following courses: Electrical Troubleshooting, Single-Phase Motors, Electrical Protective Devices, Three-Phase Systems, D-C Power in Industry, Transformers & A-C Circuits.

1979 EBASCO SERVICES, INC.

Babcock, Wilcox and Columbia, MD Basic Steam Generation Techniques -

120 hrs. (certificate). "

Practical Nuclear Power Plant Technology

- 90 hrs. (certificate).

005.GCf9

, t,  ;

k A .

l 1977 Completed requirements and earned GED, State of Georgia.

1985 Society member of the American Nuclear Society.

"THE FACTS STATED IN THIS RESUME ARE TRUE AND COMPLETE"

.M w ~

/ ., b.u

(/Q /

i i

?' l 001C'.20 ,

-  ;