Ljf 4 l'lf1'- 0h
(
gh 1 cn -u f COM5TOCK 67/,/g,
.\\ ; :. ',
N.% '
BR AIDWOOD NUCLEAR POWER PLANT Y
R.R. # 1, P.O. Box 23A2 Braceville. IL 60407 (815)458 2801 Comstock Engineering.Inc.
A COMSTCCK GAOUp COVDANY April 1, 1985 Commonwealth Edison Co.
e.
Braidwood Station
,M D
Y R. R. 1, Box 81 Braceville, IL 6040~/
g
- 8 g
5" Attn:
D. L. Shamblin
~'
w 3
N Proj. Construction Superintendent
SUBJECT:
BR-PCD #298 Letter m
(jt u
Dear Mr. Shamblin:
Pursuant to the above referenced letter dated 3/29/85, listed below are the planned actions to be taken by Comstock Engineering, Inc.
relative to the above subject.
i I. Comstock Engineering, Inc. has enforced Policy Statement 1.0.0 relative to the QC inspector concerns.
II. Comstock Engineering, Inc. will be performing an i
investigation of the concerns.
The Comstock investi-gation team will consist of R. E. Marino, General Manager QA/QC Services Comstock Engineering, Inc.,
T.N. Tru=ble, Corporate Administration Manager Comstock Engineering, Inc.
This investigation shall commence on 4/2/85.
III. Based upon the results of this investigation, the future status of the Comstock QA/QC personnel will be finalized.
If you have any questions or require any additional information, please contact me.
870526009B 860611 Sincerely, PDR ADOCK 050004S6 PDR
/(
p O
T. E.
Paserba QA/QC Services Manager Chicago Office EP/sm cc: R. E. Marino T. N. Trumble F. Rolan f/ g y
I. DeWald MPeelueet j.EXHlBIT\\ %
WWiN= gig s'000015sa R.
Seltmann
=h "i
- SAN FkiNOISOO PITTSBURGH e
NEW YOR<
e AJJUX#?A e.
p e