ML20214F357
| ML20214F357 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 05/09/1986 |
| From: | Dewald I COMSTOCK ENGINEERING, INC. |
| To: | COMSTOCK ENGINEERING, INC. |
| References | |
| OL-I-ROREM-029, OL-I-ROREM-29, NUDOCS 8705260042 | |
| Download: ML20214F357 (1) | |
Text
{ h I '$6 Y#lb le 3
0 w
WELD PRocOURE MEETING 22-84
~
f/7/F6 2E ij.
i A M NCEE'S:
E. Netrel
- G CO QA
.g n,F9 22 P6 :52 T. DeAntonio - CCO QA J. Gieseker - C CO PCD L. Tapella
- C CO PCD sff:3 F. Rolan
- LKC
"#" E I f,,,
~ ' " ~
I. DeWald
- LKC W. Puckett
- LKC R. Saltmann - LKC J. Louden
- S&L S. Klevens
- S&L A)
J. Giesaker opened the meeting establishing the criteria of the meeting which was the dispositioning of NCR #3099 and to allow for the revision of PQR's H & O to add A-36 to the existing materials presently listed on the PQR's.
B)
It was agreed by all parties involved that A-36 will be added to the PQR's on the next revi ion of 4.3.3., PQR's H&O.
C) Proc. 4.3.3 to be ready for review board by afternoon of 8-23-84.
D) NCR #3099 to be dispositioned to use PQR H only and that welding is limited to 3/8" min. to 11/16" max. not to include smaller welds.
E)
NCR to be initiated for welding being done to PQR H which requires ::inimum of 3/8" Welds, maximum 11/16", although Quality Control inspected to the afgg490u4nnediassthwhich require 1/8" welds, y,, u p'b V5d 4 Vf f otticisi Es. na.
Y to the matte
- of l
IDENiJ1ED V
Suff W
)
IECIIYIU Appf.caat REJECTED latenance _
Cont's Offt o(,
O oM-w in m
- z. 1. =eW 1e
,. _ 2 m -
J'
)
Iro/pb 9
o#5 i
O DR AD C o
,