U.S. NUCLEAR T.EIULATORY COMMISSION N tc soia s.EOUEST NUWE%$1 M.

  • ~v*,

Feii9-P& - & f 1 t.ESPONSE TYe t DhOb T

I l "7'

RESPONSE TO FREEDOM OF (e..e/

INFORMATION ACT (FOlA) REQUEST NOV 2 01986 DOCKET NUMBENSa ur appeceam REQUESTE g

JCH 6 E m m E R..

Jn] A L D

  1. PART l.-RECORDS RELEASED OR NOT LOCATED (See checked bomes)

No agency records subrect to the request have been located.

No additonal agency records subsect to the request have been located.

Agency records subsect to the request that are identsfed in Appendix are already available for public inspecten and copying in the NRC Public Document Room, 1717 H Street, N.W., Washington, DC.

Agency recor$s subsect to the request that are identifed in Appendix are being made available for pubic inspecten and copying in the NRC Public Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOlA number and requester.name.

The nonpropnetary version of the proposaHs) that you agreed to accept in a telephone conversation with a member of my staff is now being made ava3able for public inspection and coying at the NRC Pubhc Document Room,1717 H Street, N W., Washington, DC, in a folder under thes FOIA number and requester name.

Enclosed is anf' rnaten on how you may obtain access to and the charges for copying records placed in the NRC Public Document Room,1717 H Street, N.W., Washington, DC.

Agency records subject to the request are enclosed. Any applicable charge for copies of the records provided and payment procedures are noted in the comments section.

f;ecords subject to the request have been referred tu another Federal agencyies) for review and direct response to you.

In vow of NRC's response to the request, no further acton is being talten on appeal letter dated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain informaton in the requested records is being withheld from public disclosure pursuant to the FOIA enemptons descnbed in and for the reasons stated in Part 11, sec.

tone B. C, and D. Any released port.ons of the documents for when only part of the record is being withheld are being made available for public inspecten and Copying in the NRC Pubhc Document Room,1717 H Street, N.W., Washington, DC, m a folder under this FOIA number and requester name.

Comments

)

A h

t\\ l

. I Of a

sc6 tune. odin croT Sision os

/utEs *No bEcono) x(

U s-n

m. smn t w 'y. >U -

j r.

I 8611250261 861120 LF 6-689 PDR NRC FORM 464 iPart n C e6s

T o

Government Accountability Project 1515 Connecticut Ave.,

N.W.

Suite 202 FREEDOM OF INFORMATION Washington, D.C.

20036 ACT REQUEST fcxA u 9 GM-d 9-aa46 FOIA Request September 12,1986 Freedom of Information Division Nuclear Regulator Commission Washington, D.C.

20549 To Whom it may Concern:

Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.

section 552, the Government Accountability Project (GAP) re-quests copies of any and all agency records as defined in 10 C.F.R. section 9.3a(b) and information including but not limited to notes, letter, files memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, in-terview reports, procedures, instructions, engineering analyses, drawings, graphs, charts, maps, photographs, books, telephone messages, computations, voice recordings, any other data compilations, interim, status and/or final reports related to and/or generated in connection with:

1. All documents for pipe clamps furnished by Western Piping &

Engineering, 1428 Yosemite Ave., San Franciso, Ca. 94124, fur-nished to the Perry 1 and Perry 2 nuclear plants.

a.) Pipe clamp certifications (by a professional engineer and his seal).

b.) Outline / assembly drawings. (Shows parts and dimen-sions).

c.) Installation drawing, showing load nut torque require-ments.

2. All documents in house by Western Piping at the Perry 1 and Perry 2 Nuclear plants regarding:

A.

For single connection type of pipe clamps, only.

a) materials / parts drawings for clamp u-bars, clamp" shoe", load nut washers, jam nuts.

b) engineering calculations.

3. Pipe support a) Pipe support details-where WPE clamps were uaed.

b) Plant piping systmes line list to identify pipe line numbers in pipe line list to have line data: pressure, temp, flow rates, pipe spec.

c) Furnish piping specifications for lines.

4. All complaints / correspondence to the NRC regarding:

A. Mr. Van Meter to Mr. Owen Shackleton, 6-7-82 (confidential), Deficiency Complaint-River Bend Plant.

B. Mr. Van Meter to Chairman, 1-25-84, (confidential), Defi-ciency complaint-River Bend Plant.

C. Letter, Mr. Van Meter to Omstead, Office of Legal Direc-tor, NRC, 7-21-82.

Sito i lo 0 9 J'l

l.*

e'

~

a D.

Letter, Mr. Van Meter to Chairman, 8-18-82, (confidential), Generic Design Deficiencies.

If any records as defined in 10 C.F.R. section 9.3a(a) and covered by this request have been destroyed and/or removed, and/or destroyed and removed after receipt of this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken, relevant date(s),

individual, office and/or agency-wide policies and/or justifica-tions(s) or the action (s), identification of all personnel in-volved with the action (s), and any and all records relevant to, generated in connection with, and/or issued in order to implement the action (s).

GAP requests that fees be waived, because " finding the information can be considered as primarily benefiting the gener-al public", 5 U.S.C. section 552 (a)(4)(A).

The Government Ac-countability Project is a non-profit, non partisan public inter-est organization concerned with honest and open government.

Through legal representation, advice, national conferences, films, publications and public outreach, the Project promotes whistleblowers as agents of government accountability. GAP re-quests the above information as part of an ongoing monitoring project on the adequacy of the government's efforts to protect the public safety and health at nuclear power plants.

For any documents or portions that you deny due to a specif-ic FOIA exemption, please provide an index itemizing and describ-ing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is rele-vant to the document or portion of the document withheld. This index is required under Vaughn v. A.Rosen(l), 484 F.2d 820 (D.C.Cir. 1973), cert. denied, 415 U.S. 977 (1974).

We look forward to your response to this request within ten days.

Sincerely, b-Donald L.Schlemmer