Text

.-.

,C a _ e

.(55h So-d5U4S7-6L t

.qE y

.5/7/s%

~~

Comstock Engineering, Ihc.

/ - Bo um -//o Memorandum

  • 87 APR 22 P6 :49 To:

DISTRIBUTION - ATTENDEES

(,

ottice: Braidwood From:

I. DeWald subject: Site Meetino Minutes 02/07/86 om:

02/07/86 Control No.: 86'02-10-02 MI4UTES OF THE MANAGEMENT MEETING - 8RAIDWOOD MANAGEMENT COORDINATION MEETING ATTENDEES:

CEI/LKC CEC 0/PC0/0A I. DeWald M. Dougherty J. Klena R. Seltmann F. Rolan NOTE: Please bring your copy of the meeting minutes to the next scheduled meeting on 02/21/86 to use for discussion and to update topics pertaining to your area of responsibility.

TOPIC 13053-12 000. REVIEW (Action - I. DeWald)

DOCUMENT REVIEW AS OF 02/07/86 A.

Weldino (Unit I & II Complete)

O. CEA's/ Core Drillino(Unit I & II Comp) 1.

Documents to Review 43,401 1.

Documents to Review 18,029 2.

Documents Reviewed 43,401 2.

Documents. Reviewed 18,029 3.

Documents Rejected 12,184 3.

Documents Rejected 213 4.

Documents Corrected 11,716 4.

Documents Corrected 207 5.

Orawers: Unit 1 - 49, comp. 49 5.

Drawers 30, Comp. 28

  • Unit 2 = 9, comp. 9 6.

2,042 not reviewed due to being voided or still active.

  • NOTE: Conduit / Cable Pan Hangers done; Equipment and pan 19's to complete.
8. Configurations (Unit ! & II Comp)

E.

Conduit (Unit I & II Complete) 1.

Documents to Review 14,134 1.

Documents to Review 6,017 2.

Documents Reviewed 14,134 2.

Documents Reviewed 6,017 3.

Documents Rejected 4,081 3.

Documents Rejected 795 4.

Documents Corrected 3,644 4.

Documents Corrected 784 5.

Drawe rs 21, Comp. 12 5.

Drawers 5,

Comp. 5 6.

Rev. 0/A review is generating 6.

Conduit packages were initially

,, e new Fonn 7's on a daily basis, counted-various packages had more L *

  • than one (1) form 60A.

' ; :~

C.

Eculo./JB/Penetra.(Unit I&II Comp)F. Cable Pan (Unit ! & II Complete).

1.

Documents to Review 2,682 1.

Documents to Review 2,51 7

~

2.

Documents Reviewed 2,682 2.

Documents Reviewed 2,517 3.

Documents Rejected 351 3.

Documents Rejected 635 4

Documents Corrected 184

4.. Documents Corrected 630 5.

Drawers 20, Comp.

20 5.

Drawers 12, Comp. 12

p' 8705220249 860507 PDR ADOCK 0S000456 G

PDR

Site Meeting Minutes 02/07/86 Page 2 of 6 Control No.: 86-02-10-02 l

TOPIC 13053-12 000. REVIEW - continued i

I G.

Teminations (Unit I & II Comp)

I.

Welders Certs 1.

Documents to Review 10,382 1.

Documents to Review 979 i

2.

Documents Reviewed 1J,382 2.

Documents Reviewed 0

3.

Documents Rejected 1,391 3.

Documents Rejected 0

i 4.

Documents Corrected

.1,391 4.

Documents Corrected 0

5.

Drawers 5,

Comp. 5 5.

Drawers 3 Comp.

0 6.

RWR's were included into the 6.

Test is developed. Lesson plan.

temination count changing the being developed and to be given l

number of reviewed documents.

the week of 2/10/86.

1 H.* Cable Pullina (Unit I & II Comp)

J.

GIR's (Fom 104) 1.

Documents to Review 4,608 8eing pulled from packages and 1

2.

Documents Reviewed 4,608 assembled for review.

3.

Documents Rejected 303

1. a. To date total 4,320 complete 4.

Documents Corrected 79

b. Review to conenence upon 5.

Drawers 6,

Comp. 6 approval of 4.13.1.1 revision.

TOPIC 08064 SECURITY & FIRE PROTECTION Surveillance 4316.

Procedure needs CECO approval and S&L approval.

Acti.n - CECO.

o TOPIC 101984-02 WORKING PROJECTS

1. ICR/NCR Close out Total in QC - Unit I - NCR 85/ICR 104 Unit II - NCR 12/ICR S

]

Priority (old) Unit I - NCR 15/ICR 20 Unit II - NCR 6/ICR 2 4

f Action - I. DeWald i

2. Drawing Review 81 Inspection Requests received - out of 18 drawings reviewed j

16 Inspected, 65 to complete Orawing review Work Instruction to be revised. Meeting to be held with j

CECO PCD on revised Work Instruction. Action - J. Klena.

1

3. Unit I Node Match-up (Complete for Unit 1 and Common except for a,b.c.f).

a.

35 0-18, horizontal missing, list to LKC Eng, on 7/29/85 b.

2 0-18 and horizontal problems c.

5 Hangers in Unit II Aux. With horizontal and i

verticals missing - sent to Engineering on 9/30/85 d.

35 Nodes yet to release Unit I Aux. and Conroon e.

2168 Nodes released for Unit I Aux, and Common i

f.

2 Nodes yet to release Unit ! Containment j

g.

272 Nodes released Unit I Containment j

h.

126 Nodes yet to release Unit II Aux. elevations 426 & 414 W/W i

126 no Installation Report 3 Require Inspection Form 17 Dwg 0-3670 Elev. 426' = 90 no Installation Reports I

Dwg 0-3666 Elev. 414' = 36 no Installation Reports

)

1.

1930 1 odes released Unit II Aux.

I NOTE: This is part time due to the large number of teminations at.this j

time. Action - I. DeWald.

a I

Site Neeting Ninutes 02/07/86 Page 3 of 6 Control No.: 86-02-10-02 TOPIC 101984-02 WORKING PROJECTS - continued

4. Containment Flex *acket Nodification NOTE: All complete that can be worked at present time. Remainder will be finished after IHF.

P. Sheppard.

/

5. Butt Splice Inspection Program - Ref. CECO NCR #598 i

All complete that can be worked at present time. Remainder will be finished after IHF.

P. Sheppard.

topic 032985 CAT AUDIT FOLLOW-UP

~

NCR 39, issued April 1979, and NCR 3776, issued January 1985, identified sub-vendor (Systems Control) Weld deficiencies on struts and hangers. NCR 3776 has been dispositioned by all parties and is in L.K.C. QC for closure. Closure of the subject NCR will be accomplished upon closure of CECO NCR's 708, 709 and 451 per CECO disposition to NCR.

NCR 293, issued Nay 1981 and NCR 3770, issued January 1985 identified 8-Line corp weld deficiencies on back to back strut and spaced back to back strut (to field 8/1/85). Field compliance is being accomplished, old strut given to L.

Tapella.

J. Klena to follow up on progress. Action - J. Klena.

TOPIC 042685-01 1.

AVO Problem - To date, (A) 1760 inspections requested; (B) 1732 AVO reviewed; (C) 823 completed by QC (0) 117 on hold in Engineering (E) 813 to be inspected. Action - Review J. Klena, I. DeWald (QC).

2.

D. Landers follow-up on U-1 Diesel Generator Room - In process.

Action - Craft working /QC following craft performing inspections of new work and ICR/NCK repair. Action - I. DeWald.

Diesel Generator Room 1-3331 ICR NCR 11479 11970-6 4788-5 4378-3 A.

Welding / Configuration 14050-2 13375-5 4739-2 4411-3 12 ICR/14 NCR 11408-5 13048-5 4375R1-3 4420-3 12017-8 6285-5 4607-3 4815-3 12615-5 4322-7 4458-3 4699-2 13381-5 6284-6 4854-2 4474-3 4543R1-3 4376R1-3 8.

NCR Status 2 - Field Engineering 3 - CECO - S&L 4 - Return to Construction 5 - To Field Engineer for review 6 - Field Working 7 - QC to close 8 - QC rejected - reissued 0C313G10 I

Site Neeting Minu8es 02/07/86 Page 4 of 6 Control Ns.: 86-02-10-02 TOPIC 042685 continued Fuel Kandlino 0-3356 A.

Welding - 1 Inspections to do (WA-10):

L. Ford has list.

8.

Configurations - 0 Inspections to do.

6 ICR's

& NCR's Fuel Handlino 0-3357 A.

Welding - NCR 1940 closed - ICA for welding issued hold tag #A7557 L. Ford has list.

8.

Configurations'- 0 Inspection to do.

1 Oiesel Tank Rooms 3321 (No change 12/27/85 - 01/27/86)

A.

Welding - 0 Inspections to do; 2 not installed (WA-54 & CC-42)

L ford has list.

8.

Configurations - 0 Inspection to do.; 1 not installed (CC-42)

L. Ford has list.

i 3.

NCR's for certifications to Rev. C Action - NCR's to be dispositioned by LKC QA. 76 of 115 NCR's dispositioned and i

submitted for concurrence. Action - R. Seltmann l

i TOPIC 052485-01 PROCEDURES The following procedures have been submitted and are awaiting interim approval.

Action - R. Seltmann 4.10.1 4.3.26 4.11.4 4.13.1 4.3.3.2 4.13.1.1 4

4.3.1 TOPIC 080628 OPEN AUDIT DEFICIENCIES AND SURVEILLANCES (See Attachment A)

TOPIC 090685 UNIT CONCEPT & PTL DEFICIENCIES Action - J. Klena.

A.

PTL CEA REJECT STATUS 0-30 Days =

8 Reports 31 - 90 Days =

9 Reports 91 - 180 Days = 13 Reports 180 - 365 Days = 19 Reports 366 and over 14 Reports

=

Total:

63

=

0C0:3g12

.l

{


pnn-

-nn.

n-w-e

-m

..,~.,e-

-n

.c,.n--,

..._e

-.,,y,r

-.,,-m.

Site Meeting Minutes 02/07/86 Page 5 of 6 Control No.: 86-02-10-02 TOPIC 090685 UNIT CONCEPT & PTL OEFICIENCIES - continued 8.

UNIT CONCEPT INSPECTIONS

  1. of Concepts
  1. of Items (approx) 0-30 Days 1 Reports 15 31 - 90 Days 3 Reports 5

91 - 180 Days 5 Reports 30 181 - 365 Days 14 Reports 83 366 and over 15 Reports 80 Total:

48 213 C.

PTL VISUAL WELD 1

0-30 Days =

6 Reports 31 - 90 Days = 25 Reports 91 - 180 Days = 10 Reports 181 - 365 Days = 68 Report!

366 and over 64 Reports

=

Total:

173 0.

E.C. ERNST PTL VISUAL WELD REPORTS Surveillance 4547 Rev. 2.

LXC QC is matching the 274 PTL items to the various drawing involved. P1L rejected items will be re-inspected / repaired when the match-up is completed and all rejected items are identified.

PTL inspections will be listed on the IBM printout and counted as a valid inspection.

The list of required PTL reinspections is proposed to be available the week of i

2/10/86. Action - I. DeWald.

TOPIC 100785 CECO NCR's 708 and 709 Action - I. DeWald As of 02/07/86, Total Rev. A's received 4,903

=

Total Rev. A's reviewed 4,814 Total in-house to review =

89 Exhibit

'A' Status as of 02/07/86 Total Exhibit

'A' issued to S&L

= 665 Total returned from S&L accepted - 277 Total returned from S&L back to S&L with new Exhibit

'A' 17

=

TOPIC 011386 Junction Box Walkdown Both Units to be complete on 4/15/86. Total complete to date, 172 boxes; 82 boxes complete the week of 2/01/86. Action - J. Klena.

Site Neeting Minutes 02/07/86 Page 6 of 6 Control No.: 86-02-10-02 TOPIC 011386 8 CAP CECO NCR CLOSEOUT Completion date 4/15/86.

J. Klena to provide status for next scheduled meeting.

Action - J. Klena/I. DeWald.

NCR 6097 = 117 observ., 71 require rework, 22 out of 71 complete NCR 6070 = 122 observ., 75 require rework NCR 6088 = 95 observ., 35 require rework NCR 6086 = 156 observ.

NCR 6112 = 134 obsery.

NCR 6107 = 196 observ., 40 require rework, 1 out of 40g omplete TOPIC 020786 NCR's 3419 & 3a72 TOOL CALIBRATION NCR's in LKC Engineering for evaluation and disposition.

Progress report will be provided at next scheduled meeting.

Respectfully Submitted,

-S I. F. DeWald Quality Control Manager IF0/sm cc: Attendees: