\\.1 Comstock Engineering'; Inc.
M em o ra n d u ryj pM 22 P6 '49 To F. Rolan QFi.
office hsiduced oh.
From
.. I@.,al,
~.
a u
Sun c:: Mantover Date
',, ~. Y- -
Centrol No.
85-OL-19-OL In reference to =y previcus =e=o 85-OL-11-CS-OL, atiitional reviews have been conducted in regard to Doc. Reviev, AVO Pregram, loss of inspe:::rs to the Cable Pan Hanger Walkdown. All cf these ite=s vill and are having an i= pact en the. current in process and priority inspections as well as the Unit F1 fuel leading efforts.
A) Therefore, in order to ec=plete the doc =ent reviev Of approxi=ately 151,127 docu=ents with the presen: L docu=ent reviewers, this effort vill not be ace =plished until Septe=ber 1986. Therefore, the request is for eleven (11) =cre dec=ent reviewers which vill allev co=pletics by the end cf Dece=ber 1955.
The following is a breakdown te justify the additional dec=en-review persennel:
hesert Total decu=ents to be reviewed 151,127 (Approx.)
Total drawers to be reviewed 155 Docu=ents per drawer 975 (Avg)
Docu=ents reviewed per persen 89 (laily)
T0tal dec=ents revievei per veek 53- (?er Ini' Total docu=ents reviewed (L) reviewers 2,135 (Fer *n Esti=ated c =ple:icn (i) reviewers 71 (Weeks)
Esti=ated c0=pletien (h) reviewers - Sept. 1956 13 (M:::hs' s
hecesed Ictal docu=ents :: be revievei 151,0.27 (Ap;r x.i 15 Reviewers per day 1,335 (Fer 117 Avg' 15 Reviewers - 6 day veek (53 h:urs) 5,C10 (Per Wk s
Total =:nths fer ce=pletien 5 (M:nths
Es'd-=*a' ce=pleti'en date - December 31, 1955 TO =eet
-k-==-eted Dece=ber 1955 ce=pletion date, hiring should beg'a 4-adiately in order te have the necessarf reviewers en site and to provide the required training in order te preceed by June 16, 1955.
ooomm og 373 8705220236 860507 PDR ADOCK 05000456 O
pyg y+.
\\ _':
's' ' % i,,
g 9..
h c.-
T. Ro1an F1Fc 2 Centrol No.
85-OL-19-Oh If approved, the basic drawback vill be providinc a=ple verk space for an adequate review. Although the review could be 1
[
acco=plished on a second shift, this also has its drawbacks in providing the necessary supervision required.vith the present supervision enec=passine the Quality Control reccrds which involves " Record", "Turnever", and " Doc"-a view."
4
- 3) In addition, the Q.C. Depart =ent has pulled 5 inspecters fro = the current inspection force to acec==odate the Cable Pan Walkdcun. This has i=pacted the in process inspection and'the closure of ICR's and NCR's.
C) The AVO Progra= has just recen,tly started and to date, the number of requested inspections is 83 for e AV0/ Drawing
~
trans=1ttals.
With this nu=ber of inspections being requested, it vill also have a tremendous i= pact en the current in process inspections and NCR/ICR closecuts.
D) In reference to A, 3, C and in addition to the (11) Decu=ent Reviewers, approval to hire 10 additional inspecters is requested, five (5) inspectors is to replace the Cable Pan Walkdown Inspectors re=cved frc= the current inspection force, and five (5) inspectors vill be used fer Docu=ent Review Cerrecticns/ Inspections and AVO Progrs= re-inspection.'
inspecticn request.
Your i==ediate attention to this =atter vill enable recruiting to begin and provide the required training to be acec=plished in a ti=ely =anner so these progra=s do not fall behind.
j Please advise =e of this request as seen as possible.
Sincerely, i
J/Di&
.. :. uena.:
Quality Centrol Manager IFO/s==