Text
o
\\
de d56,/457-6L
, y - M.........
S/7,d'd, p
n n
_]
F ore m - f m
Comstock Engineering, Tnc.
Memorandum'87 f?R 22 P6 :48 To:
C. Mennecke
- yFf, ogg;c,: Braidwood tml q
'~
From:
I. F. DeWald
Subject:
Manpower from Oct. 1983 h,.
5-18-8 4 Summary Control No.
84-05-18-05 In October,1983, authorization was given to add ten (10) additional QC Inspectors to enable the QC Deparonent to have fif ty (50) Field Inspectors.
November,1983, a total of forty-seven (47) Inspectors were on board with one (1) Inspector resigning. Included in the total forty-seven (47) Inspectors were some not involved in field activities (Document Review). Another seven (7) Inspectors were required to have fif ty (50) Field Inspectors.
December,1983, a total of fif ty-four (54) Inspectors were on board; one (1) resigned; three (3) were required to fill the fifty (50) Field Inspector requirement.
January,1984, a total of fif ty-five (55) Inspectors were on board; three (3) resigned; hired five (5) to fill the fif ty (50) Field Inspector requirement.
Authorization was given to hire an additional QAE.
February,1984, a total of fif ty-two (52) Inspectors were on board; five (5) resigned; hired two (2) Inspectors; still needed five (5) to fill fif ty (50)
Field Inspector requirements.
March,1984, a total of fifty-two (52) Inspectors on board; four (4) resigned; hired four (4); needed five (5) to fill the fif ty (50) Field Inspector requirements.
April,1944, authorization to hire fourteen (14) additional Inspectors plus fill the vacant areas caused by attrition were given, Total number of Inspectors on board, fifty-two (52), eight (8) resigned, nine (9) hired. Also during this month authorization to hire a Training Coordinator and an additional Assistant QC Manager was given. From the fourteen (14) additional QC Inspectors, a Level III Welding Inspector will be brought on as well as a QC Supervisor for the QC Document Control area.
May, 1984 A total of fifty-eight (58) Field Inspectors are on board. Areas needed to fill the total requirements are as follows:
6]C0003112 SSS$000lgs PDR
. ~.
\\..
a s'
Memo to C. Mennecke i
Control No.
84-05-18-05 Page 2 (1) Asst. QC Manager - To report 6/4/84.
(2)
Training Coordinator - Interviewing.
s.
(3)
Inspectors out of which one (1) Level III Welding and one (1) QC Supervisor, Document Control.
Upon completion of filling the Inspector requirements, a total of sixty-two (62) Field Inspectors will be on board for inspections.
i To date, the present staff is as follows:
1 QC Manager Asst. QC Manager - 1 to report 6/4/84 1
I 2
QA Engineers 1
Training Coordinator - Open QC Supervisor - Open, Document Control 1
Clerks - 1 off Medical Reasons (Pregnancy) 9 1
Secretary Level II Inspectors (Vault, Document Review) 3 Field Inspectors - 4 needed to fill requirement.
57 Fourteen (14) in training.
t The following is an example of reasons why the Inspector actrition rate is/was at a high level:
I (a)
C. Tyler - $14.40 - Daniels at Wolf Creek.
(b)
G. Hagler - $14.00 - Zimmer Nuclear Plant.
(c)
S. Rowbatham - $14.00 - Perry.
(d)
H. Washington - Would not disclose amount.
(e)
K. Bushue - $13.50 - Ebasco, Houston, Texas.
l (f)
W. McGuigan - Monetary, would not disclose amount.
(g)
C. Friemark - Monetary, to Midland - Consumer Power.
~
C0003113 e
,-~,
a.- -
I 1
f Memo to C. Mennecke Control No.
84-05-18-05 Page 3 (h)
M. Wynter - Monetary and personal.
(i)
J. Hall - $13-$14 Ebasco, Houston, Texas.
(j)
D. Norman - $22.00 - Diablo Canyon.
This just names a few examples.
I In April, Comstock Engineering, Inc changed the salary guidelines for Level II Inspectors and, at present, the level starts at $12.00 per hour with l
a $.50 increase for each additional certification obtained by the individual.
it This system puts the emphasis on the individual to execi and, at present,
{
- Also, appears to be accepted quite well by the existing group of Inspectors.
j a training program is being instituted scheduling all Inspectors for cross-training, also enhancing the program.
I
- 1. F. DeWald Quality Control Manager IFD/j f cc:
F. Rolan T. Paserba I
i l
1
,i i
i 6100003114 1
i I
i
,