ML20214E456
| ML20214E456 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 05/12/1987 |
| From: | Jonathan Montgomery NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mccullugh R SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER |
| Shared Package | |
| ML20214E458 | List: |
| References | |
| NUDOCS 8705220092 | |
| Download: ML20214E456 (1) | |
Text
_
4 MAY 121987 j
Docket No. 70-1257 Advanced Nuclear Fuels Corporation 2101 Horn Rapids. Road P. O. Box 130 Richland, Washington 99352-0130 Attention: Mr. R. W. McCullugh, Vice President Engineering and Production Gentlemen:
Subject:
Responses to NRC Safety Assessment Team Report This will acknowledge receipt of your response dated April 30,1987, to the comments and recommendations. included in the February 26,:1987,-Assessment Team Report.
Thank you for your timely response..Your. conclusions and planned actions will be reviewed in rubsequent inspections.
Sincerely, James
. Montgomery, Chief Nuclear Materials Safety and Safeguards Branch cc:
Mr. Charles W. Malody, Manager.
Corporate Licensing cc w/cy of ltr dtd 4/30/87:
T. Strong, Chief Dept. of Social & Health Services bec w/cy ltr dtd 4/30/87:
RSB/ Document Control Desk (RIDS) (IE05)
B. Faulkenberry J. Martin J. Zollicoffer bec w/o cy of ltr dtd 4/30/87:
M. Smith Region V
[ REQUEST COPY-] REQUES Y ] REQUEST,f,0fY ]
[ YES V/ NO
] YES NO
] YES / (80'
[SpqTOPDR db W
[ W W / ^NO ]
B rock / norma BThomas JLMontgomery 5//k/87 5//$f61 5/I /87 V
0705220092 870512 fi PDR ADOCK 07001257 C
PDR DO6-
- ^
i i