g w-mis # fuw~

56 454 ys7-cc.-

ff/yf

,ggg,. & y

e 45 4

//

7)

RULES -,, -

/ /(L.K. COMSTOCK TEST FACILITY

--._,.L.~.,

1 with concurrence of the L.K.C. Level IIN h Weld Inspector WC y pn or his designee can terminate a weld test at any point if it is determined that The QC Wald Inspector 1.

j t the welding does not meet job requirements this will be considered as a re ec.

37 E -1 P7 :10

'87 APR -1 P7

. Test The welder will have 24 working hours to complete his asifgned welding tests. gggg-

,y M

time will commence at time of fit up and tacks.

DOCr.E{ ';-

wv 2.

Only authorized personnel are allowed in the weld test facility.

3.

Once a weld test has been started the only people authorized to enter the test bpoth is the welder and the QC weld inspector, or as authorized by the QC weld inspector.

4.

Hold Points as defined will be points during the welding test that welding will be 5.

discontinued until the QC weld inspector performs a required inspection.

i 6.

Mandatory Hold Points shall be When the test plates are properly marked, fit up, tacked and welded a.

to the test fixture.

At the' completion of the root layer.

The root layer can be deposited in one pass or more. The welder will b.

Note:

be permitted to grind only his stops and starts for the root layer.

However, if the welder deposits the root layer in two passes he will be permitted to do light grinding at the toe of the weld prior to.

depositing the second pass.

At the completion of the final weld.

The welding test is to remain in the test fixture until the QC weld c.

i-Note:

The cover passes

, inspector performs the fing1 visual inspection.At no time during will be inspected in the as welded condition.

the weld test will a weave head be deposited whose width exceeds' (5) five times the diameter of the electrode being used.

The welder will be responsible for all tools assigned to him.

7.

A portable electrode oven will be assigned to the welder by number it shall be 8.

plugged in at all times during the weld testing.

Electrode ovens will be used for stowing electrode only.

9.

There will be no spitting on the floor within the veld test facility.

10.

The welder will be responsible for cleaning his test booth at the end of each 11.

working shift.

Electrode stubs are not to be thrown on the floor a stub bucket will be provided.

12.

At the and of each working shift the welder will empty his stub bucket into a 13 designated receptacle.

The welder will return his tools to the tool crib at the end of each working shift.

14.

Once a welder starts a weld test his test coupons are not to leave the test facility A locked box will be provided 15.

unless so authorized by the QC weld inspector.

with in the test facility. The QC weld inspector will lock the test coupons up 8705220056 860701 gDR ADOCK 05000456 PDR

y RULES - L. K. COMSTdCK TEST FACILITY Page 2 15.

(continued) at the end of each working shift, and will re-issue them at the beginning of the next working shift.

16.

The welders filler material that is unused may be left in the portable electrode oven overnight.

17.

It will be the QC Weld Inspector's responsibility to check the portable electrode oven prior to the start of the following shift to assure that the electrode oven has not malfunctioned during the night and exposed the electrode to ambient temperature for a period exceeding 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

I have read and understand the above Sig.