Comstock Engineering, Inc.
87 M'I 13 AS :46 Memorandum w
To:
F. Rolan 000;' o n;e : Braidwood From:
- 1. DeWald
Subject:
Safety Related Cable Pulls Stopped Date:
5-10-84 Control No.
84-05-11-01 This memo is to inform you of a phone call from C. Mennecke at approximately 5:15 P.M. on 5/10/84.
All Safety Related Cable Pulls are stopped due to NRC, R. Schultz and Procedure 4.8.8 not being approved and implemented with the NRC comments as was committed by March 31, 1984.
s Procedure 4.8.8 will be worked on and hopefully revised with interim Approval by 4:30 P.M., 5-11-84.
Although this is not a defi-nice time, it is the time indicated ~ by Ceco. The QAE's will start this 5-11-84 first thing in the morning.
s 14 Y
^
'. F. DeWald 1
Quality Control Manager IFL/ji 4
cc T. Paserba LA. Saklak nuCtrAR RtGULATORY COMMis3 ION R. Saltmann 57.o7,, 2M1 J. Sumrow g,ci, n, 50 -VS4 -o 4-Ofpcial Exh. ne.
QC Tile gg fh QC }Mnager Tile Staff 10CMilFIED 0
ANIicant REC [lVID Interwner V
AEltCit3 Coat's O!Pr Contracter CATE /2-Other Witnew Reportw M
I f
77
- L G7052h6k c
p PDR HR000856 G
_.