Text
.
s.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSIO?!
DOCMETED USNRC BEFORE Tile ATOMIC SAFETY AND LICENSING APPE41. EfLit_D r n zu MO :16
~
In the Matter of
)
gic CLEVELAND ELECTRIC
)
Docket Nos. 50-44P&t;H ILLUPIINATING COMPANY, ET AL. )
50-441 OL
)
(Perry Nuclear Power Plant,
)
Urdts 1 and 2)
)
NRC STAFF MOTION FOR EXTENSION OF TIME TO RESPOND TO OCRE MOTION TO REOPEN TIIE RECORD TO ADMIT A CONTENTION CONCERNING THE SEISMIC DEoIGN OF TIIE PERRY PLANT I.
INTRODUCTION By motion dated February 3,1986 the intervenor, Ohio Citizens for Responsible Energy (OCRE) requested the Atomic Safety and Licensing Appeal Board ( Appeal Doard) to reopen the record to admit a contention concerning the adequacy of the seismic design of the Perry Nuclear Power Plant (PNPP). The basis provided by OCRE for the motion is a newspaper account of the January 31, 1986 carthquake near the PNPP site.
Under the Commission's rules of practice, the response of NRC Staff (Staff) is due on February 24, 1986, 10 CFR I 2.730(c).
Because this provides insufficient time for Staff and their consultants to analyze the exten-sive data obtained during and after the carthquake so as to provide an adequate technical response, the Staff seeks an extension of time to respond to OCRE's motion as set forth below.
GRANTED For the Appeal Board' e6o22:0333
- 6om, PDR ADOCM 050.2440 0
PDR g[
i Secrbtary'to the Appeal Board b
1 O
_g_
II.
DISCUSSION As correctly indicated by OCRE's motion, an earthquake of approxi-mately 5.0 on the Richter scale occurred near PNPP on January 31, 1986.
This event has been the subject of extensive investigation by NRC, Cleveland Electric Illuminating Company (CEI or Applicants), the United States Geological Survey (USGS) and other experts.
The plant has been inspected extensively by Staff and Applicants.
The results of these investigations and inspections comprise a large body of information not yet completely analyzed and correlated into a comprehensive evaluation by the Staff.
The Applicants' full report and analyses of data obtained by seismic monitors at PNPP were submitted to Staff on February 12, 1986 so that detailed review of this data by the Staff experts in the several disciplines involved is only beginning.
The Staff intends to provide its evaluation and conclusions concerning this data in a supplemental SER about March 7, 1986.
Until that time, the Staff will not be ade-quately prepared to provide a full and accurate response to OCRE's motion.
The Staff believes that sufficient review and evaluation will be completed by the several members of NRR and OIE, assigned to this task as well as the consultants who are assisting the Staff, so that a response can be provided to the Appeal Board on March 5,1986. Accord-ingly, the Staff requests extension until March 5,1986, to respond to OCRE's motion.
Staff Counsel has contacted representatives of OCRE and the Applicants concerning the Staff's request for an extension of time.
Both representatives stated they have no objectior to the extension requested.
._w,eww w n,- ~ e e -me nw,-e m,m,r.
.,---ee.,,
a,
REQUEST FOR RELIEF Based on the foregoing and for good cause shown, the NRC Staff respectfully requests that the time for the Staff to respond to OCRE's February 3, 1986 motion to reopen the record be extended to March 5, 1986.
Respectfully submitted.
Colleen P. Woodhead Counsel for NRC Staff Dated at Bethesda, Maryland this 18th day of February,1986.
1
I l
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 00tKEILE ATOMIC SAFETY AND LICENSING APPEAL BOARD USNRC
'86 FER 20 #0:16 In the Matter of
)
)
Offla.9 t
Tile CLEVELAND ELECTRIC ILLUMINATING
)
Docke t00tasuh 5G 444Dr.0L
)
~
)
)
(Perry Nuclear Power Plant, Units
)
1 and 2)
)
)
CERTIFICATE OF SERVICE I hereby certify that, on this 19th day of February, 1986, I mailed a copy (first page only) of the Appeal Board's grant by stamp endorsement of "NRC Staff Motion for Extension of Time to Respond to OCRE Motion to Roopen the Record to Admit a Contention Concerning the Seismic Design of the Perry Plant," dated February 18, 1986, to each of the following:
Terry Jonathan Lodge Colleen P. Woodhead, Esq.
618 N. Michigan St.,
Of fice of the Executive Suite 105 Legal Director Toledo, Ohio 43624 U.S. Nuclear Regulatory Commission Jay Silberg, Esq.
Washington, D.C.
20555 Shaw, Pittman, Potts &
Docketing and Service Branch Trowbridge 1800 M Street, N.W.
U.S.
Nuclear Regulatory Washington, D.C.
20036 Commission Washington, D.C.
20555 Susan L.
Iliatt 8275 Munson Road Mentor, Ohio 4 4060
~Q h~- - A sic itary to tIIo AEUcal Bo< rd