Forwards Insp Rept 99900251/86-01 on 860113-17. Nonconformance Item 2 Noted in Insp Rept 99900251/85-01 Re fit-up Procedure Withdrawn
ML20214C539
Person / Time
Issue date: 02/19/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Holtz M
JOSEPH OAT CORP.
Shared Package
ML20214C542 List:
References
REF-QA-99900251 NUDOCS 8602210173
Download: ML20214C539 (2)


Text

.

Q-

/

o UNITE *) STATES -

~

~

r NUCLEAR REGULATORY COMMISSION o

{

1 WASHWGTON, D. C. 20555

  1. ,i s

February 19, 1986 Docket No. 99900251/86-01 Joseph Oat Corporation ATTN: Mr. Maurice Holtz Vice President 2500 Broadway Camden, New Jarsey 08104 Gentlemen:

This refers to the inspection conducted by Messrs. R. Cilimberg, R. Pettis, J. Thon.as, B. Brown, and Ms. C. Abbate of this office on January 13-17, 1986, of your facility at Camden, New Jersey and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

Further, your response to the previous NRC inspection report dated December 18, 1985 has been received and reviewed..The results of this review are discussed below.

The puroose of this inspection was to review the fabrication of the fuel and knockout canisters to be used during the defueling and storage of TMI-2 core debris and to review the implementation of the Joseph Oat Quality Assurance Program and quality control procedures with respect to the canisters. Areas examined during the inspection are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.

Production activities associated with the fuel and knockout canisters were observed.

Within the scope of the inspection, the activities reviewed were being performed in accordance with the NRC requirements of 10 CFR Part 21 and 10 CFR Part 50, Appendix B, or the requirements of the Joseph Oat QA program.

In addition as discussed below, corrective actions for previous NRC inspection findings (documented in inspection report 99900251/85-01 dated December 18, 1985) were reviewed.

The corrective action items discussed in your January 20, 1986 response to NRC inspection report 99900251/85-01 dated December 18, 1985 were in place and reviewed by the NRC inspectors during the January 13-17, 1986 inspection.

The corrective actions were promptly implemented and responsive to the concerns stated in the Notice of Violation and to the items of nonconformance contained in the inspection report. All items identified in that inspection report are considered closed; no further information is requested.

Additionally, please note that Nonconformance Item 2, referring to the fit-up procedure in which a steel bar and hammer were used to achieve a concentric fit-up, is hereby withdrawn.

During the recent inspection, the inspectors determined that the fit-up process was being performed in accordance with Joseph Oat fabrication procedures.

This item is discussed further in section E.3 of this report.

8602210173 860219 pOf PDR GA999 EfwJOAT 99900251 PDR

'a o

Joseph Oat Corporation February 19, 1986 In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

No additional information concerning Inspection 85-01 or Inspection 86-01 is requested. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Ga y G. Zech, Chief Vendor Prcgram Branch Divisior. of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1.

Appendix A-Inspection Report No. 99900251/86-01 2.

Appendix B-Inspection Data Sheets-(5 pages) cc w/ enclosures:

Bechtel Power Corporation ATTN: Mr. T. I. Gillespie Manager, Quality Assurance Projects 15740 Shady Grove Road Gaithersburg, Maryland 20877 GPU Nuclear Corporation ATTN: Mr. F. Standerfer Vice President / Director TMI-2 Post Office Box 480 Middletown, Pennsylvania 17057 U.S. Department of Energy - TMI Site Office ATTN: Mr. W. W. Bixby Manager Post Office Box 88 Middletown, Pennsylvania 17057 Nuclear Energy Services Manufacturing ATTN: Mr. C. E. Anderson Director of Quality Assurance 1000 Shelter Rock Road Danbury, Connecticut 06810 Nuclear Energy Services Manufacturing ATTN: Mr. F. Sugar General Manager 101 Swing Road Greensboro, North Carolina 27409