ML20214C064
| ML20214C064 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 09/04/1986 |
| From: | Weil C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Pawlik E, Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| OL-S-021, OL-S-21, NUDOCS 8705200527 | |
| Download: ML20214C064 (2) | |
Text
uNirro s7 Arts
{
([
[f.nc, NUCLEAR REGULATORY COMMtsslON 0,
REGION W
. u MEf,,,
g i ;.,
7,
,,,noosevgLymano CM r
',E CLEN ELLYN ILLINots 40137 8.,
g,..., p 24 P4 :45 October 26, 1984 7.!L..
uuCKi;.tc
,(;
d.x - h MEMORANDUM FOR:
R. L. Spessard, Director, Division of Reactor Safety E. T. Fawlik, Director, Office of Investigations x
Field Office, RIII C. H. Weil, Investigation and Compliance Specialist FROM:
ALLEGATIONS RE: WELDING BY L. K. COMSTOCK COMPANY AT
SUBJECT:
BRAIDWOOD (50-465; 50-457) (ATS NO. RIII-84-A-0123) 9/6/84 memo, C. H. Weil to C. E. Norelius and R. L. Spessard
Reference:
The following is provided for inclusion in the DRS inspection to resolve the The referenced memorandun documented welding allegations allegations.
involving the L. K. Comstock Company at Braidwood. Subsequent to that interview the alleger was interviewed under oath and a transcript was made The transcript was reviewed and several during that interview (enclosure 2).
new allegations were identified. They are:
Transcript Reference Comment Page 28, Line 3 Alleger had reviewed weld procedures for L. K. Comstock at Perry and had identified procedure inconsistencies.
Comstock inspection procedures do "not deal with Page 42. Line 18 a full penetration weld of any kind."
Page 50, Line 16 The L. K. Comstock Braidwood QC Manager was previously an inspector and passed many welds which should have been rejected, Several areas of possible wrongdoing were identified.
Instances of record falsifications were discussed on Page 33 at Line 19, Page 37 at Line 9, Page 40 i
at Line 14, Page 41 at Line 20, Page 46 at Line 3 and Page 111 at Line 9.
The Office of Intimidation of inspectors was discussed on Page 92 at Line 10.
8705200527 860904 ADOCK 05000456 PDR PDR g
.aA. k
_.c d L mwuuao pirM*5,,9RM a3 m
ayn f
o.
October 26, 1984 2-Spessard/ Pawlik Investigations RI{I Field Office is requested to review these potentia
~
01 invest 0gation.
wrongdoing issues to determine the appropriateness for j
] f/
Charles H. Weil Investigation and Compliance Specialist E
Enclosures:
1.
Interview Memorandum I
2.
Interview Transcript cc w/ enclosure 1 only:
W. L. Forney R. C. Knop W. S. Little C. E. Norelius R. F. Warnick SRI-Braidwood cc w/ enclosures 1 and 2:
D. H. Danielson
..s. a r.; q i n L
/g
.a A D s...'.
-