ML20214B919

From kanterella
Jump to navigation Jump to search
Intervenor Exhibit I-ROREM-198,consisting of 860405 Memo on Documentation Procedures
ML20214B919
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/03/1986
From: Brown R, Hii J
COMSTOCK ENGINEERING, INC.
To:
References
82-03-29-04, 82-3-29-4, OL-I-ROREM-198, NUDOCS 8705200470
Download: ML20214B919 (1)


Text

_

T.- S m - /GE &aM) irvc 199 Ca#%10C 4 L. K. COMSTOCK ENGINEERING Cb.,,hANY, INC.

{

M emo ran dun %7 11AY 12 P7 :51 i

ALL LKC PERSONNEL OFFM :.

. u.,-

BRAIDWOOD To:

00CKlit:0 '. J"VICI-R. A.

BROWN, SR.

SFANCd From:

1 DOCUMENTATION MARCH 29, 1!

Subject:

Date:

Control No.:

82-03-29-04 EFFECTIVE IMMEDIATELY!

All documentation shall be comoleted using DARK BLUE or J BLACK INK ONLY!

This includes all Installation. Reports and Inspection Reports along with Corrective Action Reports (i.e.

ICR's/NCR's) and FCR's.

In addition, ALL required information mdst be filled in when applicable or an N/A entered.

Corrections shall be made by drawing a single line TErough error, then inital.

Adherence to these instructions is necessary as the documents involved are permanent plant records most of which will be micro-f,ilme d.

Pencil and various colors of ink will not properly

(

transpose on microfilm.

Documents received that are NOT WRITTEN IN DARK BLUE or BLACK INK WILL BE RETURNED to the originator for correction prior to acceptance.

AR REGULAT0Rf COMMIS$104

. -,, n

-atl %L A i w sun iotermto e

'ggf j

,. -., p 2as a R. A. BROWN, SR.

)

y Rtetsto_ _

QUALITY CONTROL MANAGER late b

RIltCitD

)

u DATE lS"5 SD D' "

    • "8 J. HII

[.)

PROJECT ENGINEER RAB/tdrolan 8705200470 861203 cc:

L. Facchina PDR ADOCK 050004"6 PDH B. Gardner o

B. Ladochy

[\\ S bME Mo ws t t T AEE eFFEd.T gg.

k 5 op 8:oo A.M. ape.iL 4.1982.

APR 2 - 1982,,

(A s Pee J.L\\.W I AT CoutTRUCTLCN MEETIUS om APE. {'2.too P.M)

F. RCLAN Tue ueMo vAs issued To TdE FIELra HR000022 oW Ape..S 1932 2 !15 R M.

A