ML20214B841
| ML20214B841 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/04/1986 |
| From: | Cosaro R, Sommerfield T COMMONWEALTH EDISON CO. |
| To: | Beth Brown, Patton J, Rubino A AFFILIATION NOT ASSIGNED, COMSTOCK ENGINEERING, INC., PHILLIPS, GETSCHOW CO. |
| References | |
| BRD-#7272, OL-I-ROREM-224, NUDOCS 8705200437 | |
| Download: ML20214B841 (1) | |
Text
..
22-f
[~
M /h -
h N$ $1bk' W cetober p.
'87 mY 13 A e.:BRD #727211, 1982 4
Gir.
GC C1':.
5 TO:
A. Rubino Ti Salem Phillips, Getschow Midway Industrial B. Brown D. Grant L. K. Comstock Pullman Sheet Metal l
J. Patton Gust K. Nawberg V. S. Wallgren J. Pruitt L. Smetana li.I.S.Co.
Pittsburg Testing Lab
SUBJECT:
Qualification of On-Site Contractor Personnel Upon receiving Ceco approval of personnel qualification procedures, site contractors will be required to upgrade all on-site inspection personnel to the new criteria.
All areas of the program will be administered to all on-site inspection personnel.
The 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> O.J.T. requirement and lecture require-
[
ment can be waived for personnel who have been on-site performing inspections prior to approval of the subject pro-cedure; however, all personnel must successfully complete the required general, practical, and written Q. A. tests.
The e
waiver of 0.J.T. and lecture requirements will be on a case by case basis with length of service prior to procedure approval and test scores reviewed to detemine the need for O.J.T. and lectures.
These waivers must be approved by CECO site'Q. A.
non usuuwncussioit j
j wugo->tgt.of-/hb?!n$.u. 22Y
- f. [,, pyy7pfp
/
Cm #Sht-
- 7. R. Sommerfield 3,,,m Q. A. Superintendent Braidwood Station 10NN sig g.g
.RICIIVED REJECTID g,,
CAft /
'Y
/
c trx=.
h/
oinn -
/
hentu [), Qq 4 -
r R. Cosaro
- - " ~ ~ ~
g Project Construction Superintendent Braidwood Station
/b TRS/K!Ji/mjv cc:
Q. A. File /40.7 8705200437 861204 "
HR000C48 PDft ADOCK 05000456' G
PDR '
l
- _.