ML20214B698
| ML20214B698 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/04/1986 |
| From: | Dewald I COMSTOCK ENGINEERING, INC. |
| To: | COMSTOCK ENGINEERING, INC. |
| References | |
| 85-03-15-03, 85-3-15-3, OL-I-ROREM-221, NUDOCS 8705200373 | |
| Download: ML20214B698 (1) | |
Text
L-
,-em-2 2 /
(I IW R2. '
WIM Comstock Engineering, Inc.
Memorandum "a7 w//13 AG :39 yo:
Supervisor Distribution b-Oh Braidwood From:
I. DeWald
Subject:
Certification of Supervisors Surv. 4241' 3/15/85 Date:
Control No.
85-03-15-03 In reference to the CECO Surveillance Response all Supervisors must be certified in all areas in which they are supervising. This is to be accomplished by June 1,1985.
With the date of June 1,1985 it is imperative that this date g amt and not slipped for any reason.
With the above,it should be kept in mind that B.P. 4.1.3 Rev. C Training Sequence be followed. This includes required reading, I hour, 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, the 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> OJT and testing.
I n%22 I. F. DeWald ~
Quality Control Manager IFD/1f cc:
R. Seltman R. Sak1ak NUCLEAR RfCULAipM CCuursston R. Simile
- o g., g, 83_ggf., o (,,[M3 7-0 4-7 9
la the matter of ' d&
D. Landers start-O* 30**I 10tm u
, Aopffcent v
QC File
- IClivro -
A QC Mgr. File
8tJICUD -
Cont'g Qtfr
~
/2-v.fd:,
C*a'ac5' oui
^
ntness..
fNAgQ nao.,,,r -
s er I
jh$N$$56 07052
(
HR000279
. _ _.