ML20214B646
| ML20214B646 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/04/1986 |
| From: | Tapella L COMMONWEALTH EDISON CO. |
| To: | Dewald I, Quaka T AFFILIATION NOT ASSIGNED |
| References | |
| 0158O, 158O, 85-107E, OL-I-ROREM-220, NUDOCS 8705200350 | |
| Download: ML20214B646 (1) | |
Text
h y w)- ?U h.Si M. 220 PDY &
i
(
'87 Ma i 3 A 319,,3 11, 1,,3 85-107E CI:
f,,,
- i. u
( y.;
To:
- 1. Dewald.
t i T. guaka 3
g,AR 12 ;gg5m "'g L.K coMSTocIt
Subject:
Braidwood Station Units 1 & 2 CONST,pgpy*
System Control Hanger Inspections O
s
.N
.: '::V 2 T:'
T**
~~
The intent of this letter is to provide direction by clarifying any previous correspondence concerning cable pan hanger inspections.
As a result of the issuance of CICo NCR's '708, 709 and the supplemental walkdown instruction (reference Ba/PCD 85-216), LKC should stop ali configuration inspections of vendor supplied Cable Pan Hangers except as described in the walkdown instruction. Since the walkdown does not include attachment weld inspections, LKC is to continue those inspections and submit the reports to PTL for evaluation.
In order to be consistent, CECO QA is requested to direct FTL to.stop configuration and weld inspections of all cable pan hangers. As with L. K.
Comstock, this does not include cable pan hanger attachment welds.
Any questions concerning this letter, please call me on extension 2404.
NUCLEAR RECULATORY COMM11310ll DetW Na I D "e-Y Y 0m, e h0 t t, s.
J.j 5
L,e 8'8"
'ONU -
- . 4. Tapella Ankaat arctivtD Project Construction inter,.n.,
Rijtctro araidwood Station i.
Cont *g Off, LJT/dsb I
/ 7. g,f (,
g,,,,,
g 1
(01580) Other Witness R. Seltaan f,,, f M ,
cc:
J. K&apa T. D'Antonig/E. R. Wetzel D. Shamblig 1
x,.-
%. t'.**
B705200350 861204 y
h[*%g@*.
DR ADOCK0500g6
. '{
i 00'278
~~.
.L e
4 *, b '. *
- f.'a ' *[*
\\
t,'
t
- h **
.... ? Y Y ^ '
, h k # (,g', 'g'g'.
-