Applicant Exhibit A-94,consisting of 840927 Voided Memo Re of Concerns Received Pertaining to Lk Comstock QC Tool Calibr Program & Implementation Practices of Program
ML20214A672
Person / Time
Site: Braidwood  
Issue date: 07/10/1986
From: Dewald I
COMSTOCK ENGINEERING, INC.
To: Seeders J
COMSTOCK ENGINEERING, INC.
References
84-09-27-01, 84-9-27-1, OL-A-094, OL-A-94, NUDOCS 8705190544
Download: ML20214A672 (3)


Text

do - Y SG/v r7 -x e

a

/9-9f o

r

%/P6 owen ij ite C Comstock Engineering, Inc.

W8N Memorandum OFFICE Of bN' f[cf 00CKEThbic Office: Braidwood To J. Seede rs (File)

I. DeWald Fr:m 9-27-84

'ntrmination, Substandard Work Practices Date:

Sutject; Control No. 84-09-27-01 REF:

R. Seltmann letter dated 9/25/84 On 9/25/84 a letter o cern was received pertaining to the L.K. Comstock Quality Cont 1 Calibration Program and the implenunt ionpracticeqof the s ect program.

In viewing the cc nte.ts o e let

, the f cts rewaled are esppcially toifi that Mr.

So was assigned to

(

very ala n

review h s ci librhtion recor to ure < eficiency re rts had been written a,.1 ca.ibrated tools nsure e work rfo d with the is I searched and ete. Being' aware that

\\

revi w

. Se rs acconplisheb t QA-2 84-28 ding 2 item had been accomplished in correc e

whi a

writte 4 warning was issued Mr. Seeders,

ch ti

\\3 othe i

QC inspectors were igned

, do a 100% re" f the calibr%ti

(

I records, t rough repords from QC iins) r R. Snyder the indication was th various probit-ns ng dis osed, altho 4

ota {y cospiled.

the extent o the ts were not g

l Upon e ce t of R. Sel

's er and 1 ng $habd ing the CECO r 1 Office Audi conducted 9/1 th

/14/

at torque A

h /

wrench cali ration doc tation ecked by auditcr h a 40%

9.1 j

rejection r in viol o

e 1

atj proce ithe a y finding rs 2e paragraphs 3.3.7 and 3 zevealed 5 items of hi re out ration no documentati j

was generated per pr dure 4.9.1, to e the repair /

recalibration and eva untion o rk per by these tools.

Mr. Seeders generated CR's 32 295, 329 d 3297 on 9/15/84 the day after the exit meeting.

1 2 rough further re kondu a by Mr. Seltmann sure serious deficiencies were n

d that

/9/84 of which Mr. Seeders was practices for out of calibra-

.9 do t

trained of proced que wrenches were found to have eleven 11) t tion tools a tot o

tion being generated for the out of the same probl

,n ocumen calibration conditio.

8705190544 860710 PDR ADOCK 05000456 PDR G

App Ex. Ah 9y

' N e

~ f t,

.t.

Y s

s

\\

  • R

, 4y

't v., d, s.

Paga 2 o* 2 j

J. 5 acders (Filo)

Control No. 84-09-27-01 Also other deficiencies were noted such as:

1)

Calibration reports missing from the flies in the QC vault.

2)

ICR's are not being written for all calibrated tools that are found out of calibration or over due calibration.

3) When ICR's and NCR's are written, evaluations are not always made to determine the validity of previous inspections or test results.
4) Missing tool reports are not generally written by the craft foreman and not being followed up with ICR's.

(

5)

IKC procedure 4.9.1 Revision C paragraph 4.1 gives a tolerance of !44 or 1 lb. for calibrated torque wrenches. Torqm wrenches are being accepted up to 110% per S&L BY/BR/3A standard.

Examples were also given in the letter of torque wrenches being issued to the field that have open NCR's and ICR's outstanding, this is totally in violation of procedure 4.9.1 REV C and 10 CFR 50 critaria 12.

This susmation is a partial representation of Mr. Seltmann's letter and is not considered as an isolated case, but a few of many problems caused by Mr. Seeders' unattention and substandard work practices. Through this many costly hours will need be expended resear&ing evaluating and resolving the necessary corrective action. This situation is a potential 50.55E. I am therefore terminating Mr. Seeders' esployment with Comstock Engineering, Inc. at the Braidwood Nuclear power plant.

It is to be understood that this termination is in no way affiliated with the letter Mr. Seeders issued on 8/17/84, and that the termination is solely based on his substandard work of which can be. attested too thru the review of the calibration records and through the aforementioned auditors concerns during the GCO G/O Audit of 9/10 thru 9/14/84 of whid were addressed in the audit exit but findings were not issued.

NK L 12b>A w

I. F. DeWald QC Manager ITD/sm Attachments cc QC File J. Seeders Personal File R. Marino T. Trumble F. Italan D. Shamblin T. Quaka R. Seltmann