CARGENT O LUNDY L-2790 E N O I N E E ft 0 A.A. 49, 07-18-84 cments DOCMETFD APPROVAL PAGE, Cont.
USNRC NUCLEAR SAFETY RELATED ITEMS ARE PART OF THIS SPECITICATION 87 m 31 A8 :39 l
Issue Prepared by C0Cr E~ciG. B by '
J " cf Purpose Date Respons_ible Elect. Engr.
Reviewed by ADerov
- E 5 0- ab
/
Amendment 12-09-83 j
36 issued Amendment 01-31-84 T. Y. G M 37 issued b.$.C. O 7
7((M[
Amendment 03-30-84 38 issued Amendment D @ C.. kes. d.
[4
~
05-14-84 39 issued Amendment 07-18-84 b.(. G L.r.
gj g ;rfg 40 Issued i.
- ,s 4
- t 1,
NUCLEAA RIr.ULAT0tf COMMIS$10N N
f al Enh. Me.
Docket Na d@bW4 6
- i. in...ue,.,
Staff ICtWFitD
- RICIWU -
Ascheset _
GMTM.
inteneam _._ _
Cant's Mr
~d' Centractor Cther Mnsas M Reperta v
AP4 fpyg 05000456 860610 Final G
PDR 9p 4 44.7
CARGENT O LUNDY
' " $j ",,$$ " U 0, 07-18-84 POST-AWARD ISSUE
SUMMARY
PACE, Cont.
Purpose of Issue Date Pages Affected Amd. 39 - Issued to Incorporate 05-14-84 AP-4, (Post) IS-3, (Post) IS-4, ECN's 7581 and 7726.
CP-3, 3-6 and 3-8.
Amd. 40 - Issued to Incorporate 07-18-84 AP-4, (Post) IS-4, CP-3, 3-6 and ECN's 22194 and 22197.
3-8.
~
I l
l l
l l
t I
._m (Post) IS-4 Final 4
SAGGENT O LUSOY 1,.1790 ENOINEEQO crea m pgg,,40, Q7-18-84
\\
CERTIFICATION OF SPECIFICATION, Cont.
Revision:
Amd. 2h Certified By: 7 Dates _
10-20-82 Revision:
Amd. 25 Certified By:,I ate:
02-10-83 Revision:
Amd. 26 Certified By:M (f/
Date:
04-01-83 Revision:
Amd. 27 Certified By:
44u./ Date:
04-25-83 Revision:
Amd. 28 Certified By:
.Y Date:
05-26-83 Revision:
Amd. 29 Certified By Date:
06-20-83 Revision:
A=d. 30 Certified By:
I es Date:
07-14-83 Revision:
Amd. 31 Certified By:
. he Date:
08-05-83 Certified By: A Y M d [ M Revision:
Amd. 32 Date:
08-29-83 Revision:
Amd. 33 Certified Sy:
W Date:
10-07-83 Revision:
Amd. 34 Certified By 7 j///
Date:
10-24-83 Revision:
Amd. 35 Certified By:
Date 10-31-83 f.
Date:
12-09-83 Revision:
Amd. 36 Certified By:
Revision:
Amd. 37 Certified By Date:
01-31-84 Revision:
Amd. 38 Certified By: M Date:
03-30-84 Revision:
Amd. 39 Certified By: I M c//
Date:
05-14-84 Revision:
Amd. 40 Certified By: */4 N'
[
Date:
07-18-84 VOID CP-3 Final
4.-
SAR2ENT O LUNDY L-2790
" fAE,f[UC Amd. 40, O' 16-84 STD-EB-146-B/B - Standard Specification for the Installation of Seismic Cate' ory I Conduit Systems Containing g
Class lE Cable (03-01-84).
Amd.39 STD-EB-148-B/B - Conduit and Miscellaneous Electrical Equipment Amd.36 Installation Specifications (10-27-83).
l STD-EB-151 Steel Conduit Through Concrete Wall and Cable Seal Amd.1 for Conduit (8-16-77).
STD-EB-153 Pull Box Fittings for Rigid Steel and Aluminum Conduit (6-15-77).
STD-EB-154 U-Bolts Specifications (4-21-77).
STD-EB-163-B/B-Conduit Connections At Thermocouples, Transmitters, Amd.40 Solenoids, etc. (6-27-84).
Amd.29 Specifications for Termination of Conduits and imd.1 STD-EB-168 Cables at Motors, Drive Units, Valves, Etc. (6-9-76).
STD-EB-176 Type II Motor Terminal Housing Insulator Supported Terminations (6-8-76).
Agd.2 STD-EB-181 Termination of Conduit and Cable at Hot Equipment Amd. 1 (7-7-77).
STD-EB-182 Cable Seal In End of Conduit or Concrete Encased Amd. 1 Duct (~-7-77).
STD-EB-190 Cabinet Mounting Outdoors Typical (5-5-69).
STD-EE-199 Cable Tray conduit Clamps (3-20-75).
Cable Grins for Cable Tray and Conduit Amd. 3 3 STD-EB-200 Risers (8-22-83).
I Cable Riser Support for Use in Con 4ed
).
Amd. 1 STD-EB-205 Amd. 1 Cable Connectors r
1 or Cable STD-EB-207 Supporting Service 7
Amd. 1 STD-EB-210 Flexible Conduit Crips with Fittings for Liquid-Amd. 2 Tight Flexible Conduits (6-13 80)
Amd.16 Terminal Block Enclosures fot Computer Instrumentation STD-EB-214 Cables (2-5-75).
3-8*
CAOCENTO LUNDY GN0sNEEQs L-90 ca:Aeo Revised CA, 11-12-76
',- s Drawings shall include Outline Drawings, Bills of Material. Schematic and Wiring Diagrams of the equipment and system furnished by the Contractor.
303.3 If Drawings are returned " Reviewed Except As Noted" Contractor shall revise the Drawings in accordance with the markings and consnents, and then resubmit one (1) sepia or one (1) microfilm for review and approval, however, equipment shall be procured or fabricated per Purchaser's in-structions prior to successive Drawing submittal.
303.4 Af ter Drawings have' been raviewed without comment, Contractor stiall send' one (1) sepia or microfilm of all prints to the Consulting Engineers for record purposes.
303.5 If information is not reproducible such as manuals, installation books, etc., Contractor shall submit twelve (12) copies of all such material.
304.
CONFLICTS In the event of conflict.between this Specification and Supplements or between Supplements, the documents will apply in the following order 304.1 General Conditions.
304.2 This Specification.
?.
304.3 Commonwealth Edison Company Standards.
304.4 Sargent & Lundy Standards.
/
9.. :.
8 d' 3-14 Final Page of Division 3
L-2790 CARCENT O LUNDY Amd. 30, 07-14-83 ENGINEEQO 4683/4684 Attachment A, Page 2 of Making all external electrical connections (includfnYg Meonnec-c.
tion).
j d.
' Making of any internal connections on equipment that were omitted for purposes of shipment and the installation of necessary jumpers and local interconnections.
e.
Mounting and connecting of minor item.s shipped se rt lg g,. remove _:.g ing and replacing details for convenient handling 7
,y f.
Cleaningandcheckingofelectricalequipmentandconneg g
S.
Testing assistance as defined in Article 402.25.
~
h.
Assisting manufacturer's servicemen or Furchaser' '
s es 1 c*l equipment in satisfactory operating condition including internal align-ing and adjustment of oil circuit breakers, metal enclosed switchgear, and other similar electrical mechanisms.
1.
Touching up damaged surfaces.
401.17 Contractor shall review the equipment manufacturer's instruction Amd.1 books prior to equipment installation for any special procedures, recommendations and/or conflicts with this Specification or the installation drawings. Purchaser or Consulting Engineers shall be notified of all special procedures, recommendations or conflicts, and permission obtained before proceeding with equipment installation.
401.18 Welders may be qualified to either ASME 5 & PV Code Section IX.
Aed.30 AWS D1.1 or AWS D1.3 requirements.
I 401.19 Field welding inspection requirements:
401.19.1 ASME 8 & PV Code Section IX or AWS D1.1 welding shall conform to the Amd.3*
requirements of Form 1701 except, as follows:
l a.
All welds, including full penetration groove welds. shall be subject ECN 22523 to visual inspection.
n 1
b.
For weld quality inspection of undercut for $
tb thV u11 ding I
support system and welds for component s rs D
shall And. 2 F be followed with the exception of weld nder m?
on of 0.01" Amd.22 depth (Section 3.6.4) when the'wel i getidn.s.fransverseto primary tensile stress in the rt iais tp rcut. However, the maximum depth of weld un 1
11mitedto1/32 inch.
c.
Weld undercut is a groove melted n,t the base metal adjaecnt to the too or root of a wc!d and left unfilled by weld n4t.il.
This groove shall not be considerud as undercu't if it in not greater than 3/16" in length and not greater than 1/16" in depth provided spacing between two adjacent grooven is at least 3 inchen.
d.
Weld undercut greater than 1/32" depth and greater than 3/16" length shall be repaired. Contractor shall submit wcld inspection reports for specific woldments on a nampling basin an specified by the Connutting Engineers.
e.
The visual weld que11ty requirement forconvexktyinAWSD1.1maybe Ard.30 waived.
401.19.2 AWS D1.3 velding shall conform to the requirements of AWS D1.3.
4-3