Text
,.
p._ [F4/# ' 5 }O 7
f - /2 c r " -
SARGENT& LUNDY y[j[sCef ENG1NEERS
' '. r E :.
rouMoEosee.
' 'N
/
SS CAST MONRCE STREET eme.co, wuois o.o2 87 APR 22 P7 :18
( Jia ) 26 -2000 Twx 010 2232807 August.7, 1986 Pro 3katfos. 4683/4-00 Commonwealth Edison Company nuCuAa etcuut0p COMulS$10N Braidwood Station - Units 1 & 2 Daciet no.S_b-fS4W7 A.aan ta. No. /2C ott Cable Separation Report BRCSR No. 62 i,m,n,a.t.f M ( c/ / f
- A' C Staff IDENilflID b
Apolicant RECUVED RUECTID latervenor Mr.
D.
Elias g, gy, Proj,ect Engineer 4), p,g g et, cart Common 1
Edison Company g
Chicago, Illinois 60690 d
Dear Mr. Elias:
We acknowledge receipt of Braidwood " Cable Separation Report" BRCSR No. 62 dated June 10, 1986 with your letter dated June 17, 1986.
BRCSR No. 62 transmitted copies of L. K. Comstock &
Company Cable Separation Conflict Report (CSCR) Nos. 0511, 0512, 0513, 0514, 0515, 0516, 0517, 0518, 0519 and 0520 for review.
Each of these CSCRs reported instances of less than the twelve-inch required separation between safety-related and non-safety related cables in free air.
This separation requirement is dictated by the Electrical Contractor 's Installation Procedures.
We have reviewed each of these CSCRs and have determined that the violations of the separation requirement described do not degrade Class lE circuits below an acceptable level for the CSCRs listed below.
The analyses performed to justify the separations reported on the CSCRs are documented on Byron /Braidwood CSCV No.1988, dated July 14, 1986, which is on file at Sargent & Lundy.
Based cr our review, we therefore recommend that you approve L. K. Comstock CSCR Nos. 0511, 0512, 0513, 0514, 0515, 0516, 0517, 0518, 0519 and 0520.
This completes our review of BRCSR No. 62.
8705190261 860909 PDR ADOCK 05000456 G
PDR f7AffERVeUE%Teeressted
- EXHIBIT W' - [/9 /d E S*a9s "W?cyr.232.o2sr C00167sg
!e y
CARGENTO LUNDY EN GIN EE RS CHICASO Mr. D.
Elias August 7, 1986 Commonwealth Edison Company Page 2 Should you have any questions, please contact me at 269-2142.
Yours very truly, T k' IKEGMf h J.
D.
Regan Electrical Project Engineer JDR:WDB men In duplicate Copies:
D. L.-Leone /W. C. Cleff K. T. Kostal/G. C. Jones D.
A. Gallagher R. J. Netzel T. B. Thorsell/B. G. Treece d