ML20214A038

From kanterella
Jump to navigation Jump to search

Forwards PGE-1049, Trojan Nuclear Plant Inservice Insp Program for Second 10-Yr Interval, Per 860829 Commitment. Approval of Relief Requests Contained in Sections 3.3,4.3,5, 5.3 & 6.2 Requested.Fee Paid
ML20214A038
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/14/1986
From: Lindblad W
PORTLAND GENERAL ELECTRIC CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20214A039 List:
References
TAC-63974, NUDOCS 8611190172
Download: ML20214A038 (1)


Text

-

a O

POHTLAND GENEHAL ELEcTHic COMPANY 121 S. W. $ A LM O N STREET WILLIAM .J. LIN O BLAD PORT LA N D. OR EGON 97204

~**

iscal zze-ea rs November 14, 1986 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation ATTW: Mr. Steven A. Varga Director, PWR-A Project Directorate No. 3 U.S. Nuclear Regulatory Commission Washington DC 20555

Dear Sir:

Inservice Inspection Program In accordance with our letter of August 29, 1986, attached is a copy of Topical Report PGE-1049, " Trojan Nuclear Plant Inservice Inspection Program for the Second 10-Year Interval". This program is based on the 1983 Edition with Sununer 1983 Addenda of Section XI of the ASME Boller and Pressure Vessel Code. The Inservice Inspection relief requests for the second interval are contained in Sections 3.3, 4.3, 5.3, and 6.2. Your approval of these relief requests is requested. In accordance with 10 CFR 170, an application fee of $150 is enclosed.

Sincerely, Attachment c: Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. Lynn Frank, Director State of Oregon Department of Energy r

I f- g %9 146\

8611190172 PDR 861114 ADOCK 05000344 y4 G PDR I