ML20213H011

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leakage Rate Rept, Per 10CFR50,App J.Rept Provides Summary of Results of Preoperational Integrated Leakage Rate Test Conducted During Feb 1987
ML20213H011
Person / Time
Site: Beaver Valley
Issue date: 05/11/1987
From: Crockett J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20213H013 List:
References
ND2MNO:1452, NUDOCS 8705190095
Download: ML20213H011 (1)


Text

de

'Af M

Teiephone <<i2) 393-8000

  • c';*',,up May 11, 1987 o,

Shippingport PA 15077-0004 -

ND2MN0:1452

/U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C.

20555

Reference:

Beaver Valley Power Station Unit No. 2 D)cket No. 50-41?

Reactor Containment Building Integrated Leakage Rate Report Gentlemen:

Enclosed is the Beav er Valley Unit No. 2 Reactor Containment Building Integrated Leakage Rate Report submitted in accordance with Appendix J of 10CFR Part 50.

The report provides a summary of the results of the Preoperational Integrated Leakage Rate Test conducted at BVPS Unit No. 2 during February,1987.

Al so submitted with this report is a summary of results for all Local Leakage Rate Testing performed since the previous Integrated Leakage Rate Test.

Very truly yours,

QL v

a J.

. Crockett Senior Manager Attachment Nuclear Operations cc: Mr. J._ Beall, Resident Inspection T. G. Zyra U.S. Nuclear Regulatory Commission R. Martin Beaver Valley Power Station R. J. Manko Shippingport, PA 15077 J. S. Patterson T. Noonan U.S. Nuclear Regulator Commission Central File (2)

Mr. Peter S. Tam, Project Manager Phillips Building 7920 Norfolk Avenue Bethesda, MD 20814 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D. C.

20555 y

l Direction, Safety Evaluation & Control h0

()

Virginia Electric & Power Company

, j g

P.O. Box 26666 i

One James River Plaza Richmond, VA 23261 6

m