b das
'Af Telephone (412) 393-6000 Nuclear Group
$i op$p'o,1, PA 15077-0004 May 11, 1987 ND2MNO:1452 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 2 Docket No. 50-412 Reactor Containment Building Integrated Leakage Rate Report Gentlemen:
Enclosed is the Beaver Valley Unit No. 2 Reactor Containment Building Integrated Leakage Rate Report submitted in accordance with Appendix J of 10 CFR Part 50.
The report provides a summary of the results of the Preoperational Integrated Leakage Rate Test conducted at BVPS Unit No. 2 during February 1987.
Also submitted with this report is a summary of results for all Local Leakage Rate Testing performed prior to the Pre-Operational Integrated Leakage Rate Test.
Very truly yours, J. O. Crockett Senior Manager Nuclear Operaticns Attachment l
l l
8705190095 870512 l
PDR ADOCK 05000412 l
A PDR 1
r
,.Benvar Vollsy Powsr Station, Unit No. 2 Dock 3t No. 50-412 Reactor Containment Building Integrated Leakage Rate Report Page 2 cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U.
S. Nuclear Regulatory Commission Regional Administrator Region 1 631 Park Avenue King of Prussia, PA 19406 Mr. Peter S. Tam U. S. Nuclear Regulatory Commission Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555
- Mail Stop 340 Addressee only Director, Safety Evaluation & Control Virginia Electric & Power Company P.O. Box 26666 One James River Plaza Richmond, VA 23261
-